Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and Construction
By F. B. Samani, B. Stabel
The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the
Jan 1, 2003
-
TEM Studies Of Pt-Al-Cr-Ru Alloys - Synopsis
By M. B. Shongwe
Pt-based alloys are being developed for high-temperature applications with the aim of replacing some of the currently used Ni-based superalloys (NBSAs) in the highest temperature applications. The Pt-
Jan 1, 2012
-
Verification Of Pillar Life Prediction Method
By J. N. Van der Merwe
The principal goal of the research described in the paper was to determine, by measurement of pillar scaling on pillars that have not failed, whether the pillar life prediction method developed by van
Jan 1, 2004
-
Modeling of factors influencing the extent of mud infiltration in a fractured rock mass
By C. Tan, C. Detournay
Wellbore stability is a major concern for drilling in naturally fractured formations. The infiltration of drilling mud into the fractures is a factor, which may compromise wellbore integrity due to t
Jan 1, 2003
-
Employee engagement among women in technical positions in the South Africa mining industry
By N. Mashaba, D. Botha
The aims of this study were to investigate the factors that influence women’s engagement in technical positions in the South African mining sector and to determine what could be done to promote their
Nov 6, 2023
-
Keynote: Address: A tribute to Prof. D.G. Krige for his contributions over a period of more than half a century
By R. C. M. Minnitt, W. Dr. Assibey-Bonsu, F. A. Camisani-Calzolari
Born in Bothaville (OFS) on the 26th August 1919, Daniel G. Krige grew up in Krugersdorp on the West Rand. Hematriculated from Monument High School in Krugersdorpin 1934 at the age of 15 and graduated
Jan 1, 2003
-
Modeling of plastic deformation and damage due to drying around a shaft in claystone
By J. F. Shao, G. Duveau, W. Z. Chen, O. Ozanam
In this paper, we present a sensitivity study for the numerical modelling of hydromechanical coupling around a shaft in partially saturated claystone. Two representative constitutive models have been
Jan 1, 2003
-
An experimental damage model for predicting the nonlinear behavior of rock
By S. -H. Chang, C. -I. Lee, Y. -K. Lee
Based on results from triaxial compressive tests, an experimental damage model to simulate post-peak behaviours as well as nonlinear behaviours before peak strength was developed. In order to consider
Jan 1, 2003
-
Improvement of the Cobalt Process at the Chemicals of Africa (Chemaf) Usoke Plant – Effect of Seed Recycle
By Jo Katembo, Patty Bwando, Patient K. Ilunga, Yves Kalubi, Emman Mulaj
"From 2010, the dolomite concentration in the ore fed to the Usoke Plant increased, resulting in a significant increase in the gangue acid consumption and Mg build-up in the circuit, and thus an incre
Jan 1, 2015
-
Rock avalanche run out prediction: combined application of two numerical methods
By R. Poisel, C. Scavia, Preh A., W. Roth, M. Pirulli
ABSTRACT: Two methodologies for the three-dimensional simulation of the run out of rock avalanches are presented: one based on a granular approach and the other based on a continuum equivalent approac
Jan 1, 2003
-
Impact of Competent Persons’ judgements in Mineral Resources classification
By K. Dagdelen , S. K. A. Owusu
Uncertainty with regard to estimated grades and tonnages of a mineral deposit demands risk assessment in order to build investor confidence and attract the interest of other stakeholders in the succes
Aug 8, 2024
-
Challenges And Solutions In PGM Furnace Operation: High Matte Temperature And Copper Cooler Corrosion
The key aspects of process metallurgy that distinguish platinum group metal (PGM) concentrate smelting from that of other base metal sulphide concentrates are presented. These differences include cons
Jan 1, 2012
-
Characterizing The Mineralogical Variability Of A Chilean Copper Deposit Using Plurigaussian Simulations
By J. Betzhold
Knowing more about an orebody makes it easier to exploit it profitably. Many orebodies are made up of different rock types, alteration zones or mineralogical ensembles: oxides versus sulphides or faci
Jan 1, 2000
-
A critical investigation into identifying key focus areas for the implementation of blockchain applications in the mining industry
By K. G. Philo, R. C. W. Webber-Youngman
mining, where data-driven decision making optimizes resource extraction, enhances safety, and ensures sustainability. The adoption of digital technologies like artificial intelligence (AI) and the Int
Jul 10, 2024
-
Important Considerations In The Testing Of High-Density Tailings For Beach Profile Prediction ? Synopsis
By G. I. McPhail
The authors have conducted several investigations into the prediction of the beach profile of high-density tailings and have found that there are a number of important considerations that need to be t
Jan 1, 2012
-
The Painting Of Clarifier Steelwork ? From A Quality Control Perspective
By David Colloby, Darelle T. Janse van Rensburg
Premature coating failures of new and refurbished structural steelwork of clarifiers have been a common occurrence at power generation plant in recent years. Several of these failures have ended in di
Jan 1, 2006
-
Development of Best Practice Guideline for the management of hot holes in surface coal mines
By M. Mpofu, G. Stenzel, F. Magweregwede, B. Maphalala, T. Kgarume
Surface coal operations in which mining activities are conducted above old underground workings experience hot holes after drilling. In a coal mine, hot holes are defined as shot holes, which after be
Sep 9, 2024
-
Numerical identification of the excavation damaged zone in rock salt
By K. -H. Lux, Z. Hou
ABSTRACT: It is well known in underground mining and waste disposal that the development of excavation damaged zones (EDZ), and thus, hydraulic pathways, is closely related to the excess in the corres
Jan 1, 2003
-
Practices And Initiatives To Transfer Simrac Developed Technologies To Its Stakeholders And Other Parties
By P. van der Heever
The genesis of Simrac?s technology transfer practices and future initiatives are discussed in this report. Simrac produces a relatively large volume of research-based health and safety outputs that mu
Jan 1, 2002
-
Just-In-Time Development Model For A Sub-Level Caving Underground Mine In Zimbabwe
By C. Musingwini
Traditionally, mineral reserves management at most underground mines in Zimbabwe focus on maintaining large mineral reserves so that the time between development and production is as long as possible.
Jan 1, 2003