Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
OFR-11-78 Rapid Monitoring Of Coal Refuse EmbankmentsBy Lawrence H. Roth
Past failures of coal refuse embankments have resulted in more intensified efforts in inspections of coal refuse sites. Inspections, however, are mainly qualitative and time consuming. In August 1975
Jan 1, 1977
-
OFR-17-87 Cost Estimation Handbook For Small Placer MinesBy Scott A. Stebbins
This Bureau of Mines publication presents a method for estimating capital and operating costs associated with the exploration, mining, and processing of placer deposits. To ensure representative cost
Jan 1, 1987
-
OFR-47-77 Reducing The Operator Sound Level Of A Mining Service Vehicle - A Demonstration ProjectBy G. G. Huggins
A demonstration project has been completed to reduce the operator sound level of an underground service vehicle, a personnel dispatch wagon, to go dB(A) or less. The program objective was to implement
Jan 1, 1975
-
RI 7768 Gases Desorbed From Five Coals Of Low Gas Content (73c58934-f8ad-4018-9023-1b01fc834bd4)By A. G. Kim
Methane and other hydrocarbon gases, byproducts of coalification, are emitted from coal at widely varying rates and often present ventilation problems during mining. The air in some coal mines apparen
Jan 1, 1973
-
OFR-140-84 Development Of Engineering And Cost Data For Foreign Gold And Silver PropertiesBy Robert E. Green
This Final Report summarizes the results of work accomplished under Contract No. J0215039. It is in an executive overview or executive summary format. The number and description of the various techni
Jan 1, 1983
-
Technology News - No. 517 - New Updates For NIOSH Coal Mine Ground Control SoftwareThe NIOSH suite of coal mine ground control software addresses nearly every aspect of coal mine ground control planning, including geologic characterization, mine layout, pillar design, and support se
Jan 4, 2006
-
OFR-8(2)-76 Analysis Of Men, Materials And Supplies Handling Systems In Underground Metal And Non-Metal Mines - Volume II ? Phase I Report - Present Systems Study ? IntroductionThis project, "Analysis of Men, Materials and Supplies Handling Systems in Underground Metal and Nonmetal Mines" documents the productivity and safety aspects of the existing equipment and systems uti
Jan 1, 1975
-
OFR-86-75 Ore Handling Equipment Operations Safety Study In Underground Metal And Nonmetal Mines ? Section 1 ? IntroductionThe low production rates associated with the underground metal mining industry have received considerable attention during the last decade. A number of significant technological advancements, in the f
Jan 1, 1975
-
IC 9345 Soil Factors Affecting Mycorrhizal Use In Surface Mine ReclamationBy Michael R. Norland
Surface and subsurface stabilization of mining-related wastes through revegetation depends upon the physical, chemical, and biological condition of the waste following mining. Mining disturbances can
Jan 1, 1993
-
IC 7864 Peat Producers In The United States That Reported Production In 1957 ? Summary And IntroductionBy Eugene T. Sheridan
The 24th annual survey of the peat industry by the Bureau of Mines, United States Department of the Interior, revealed that 76 producers in 20 States reported commercial production of peat in 1957. In
Jan 1, 1958
-
OFR-185-82 Biological Oxidation Of Iron (II) By T. Ferrooxidans In A Sequencing Batch ReactorBy Thomas L. Theis
The use of a suspended growth system of T. ferrooxidans attached in a film to individual particles of bentonite and operated as a sequencing batch reactor has been shown to be a practical way of oxidi
Jan 1, 1982
-
IC 8129 Open Pit Operations At The Tripp Pit, Consolidated Coppermines Corp., Kimberly, Nev. ? Summary And IntroductionBy M. Clair Smith
This report is one of a series being prepared by the Bureau of Mines on exploration, development, mining methods, and costs at various open-pit mines in the United States. These reports have been prep
Jan 1, 1962
-
RI 8686 Molybdenum Removal From Concentrator Waste WaterBy R. O. Dannenberg
The Bureau of Mines conducted laboratory batch and small-scale continuous tests to remove traces of dissolved molybdenum from water simulating waste discharged from a molybdenum concentrator, Molybden
Jan 1, 1982
-
OFR-52-88 In-Mine Development Testing Of An Automated Extraction SystemBy Richard Rittenhouse
This program was to develop a new base line system for automated continuous room and pillar type mining. The primary requirement estab¬lished for this machine is that the machine be capable of mining
Jan 1, 1983
-
RI 3592 Analyses Of Crude Oils From Some Fields Of Oklahoma ? II. Southern Oklahoma (a3df2cb2-a5f0-4d40-9bd8-67ea03677de2)By E. L. Garton
[The oil-producing district, "Southern Oklahoma," is generally considered to be that part of the: State lying; southwest of the Arbuckle Mountains. It includes six counties: Carter, Cotton, Garvin, Je
Jan 1, 1941
-
OFR-74-76 Preliminary Engineering And Economic Evaluation Of Underspoil Haulage In Area Strip Coal Mines - Part I ? Executive SummaryCoal, America's most abundant fossil fuel, is expected to play a key role in our pursuit of energy independence. A substantial increase in coal exploitation will be required if we are to fulfill
Jan 1, 1975
-
OFR-156(1)-77 Technical And Cost Evaluation Of Candidate Large Scale Open Pit Oil Shale Mining Methods In Colorado ? Volume IBy R. C. Adams
This report describes the feasibility of mining the oil shale deposits of the Piceance Creek basin in Colorado by an integrated open pit system. The study is based upon a comprehensive analysis of per
Jan 1, 1976
-
OFR-5(1)-85 Evaluation Of Dust Sources And Control Techniques For Conventional Mining - Vol. I - Field StudiesBy S. J. Rodgers
This report presents the results of in-mine studies to determine the severity of dust sources in conventional mining operations. Three underground coal mines were surveyed using gravimetric samplers a
Jan 1, 1983
-
RI 7790 Methane Control By Isolation Of A Major Coal Panel-Pittsburgh Coalbed (64d8fde6-2783-4e55-b6e4-9e5a47a1fed9)By Charles Findlay
As one of its projects for degasification of major panels of coal prior to mining within them, the Bureau of Mines conducted methane emission studies during development of a set of three headings 1,80
Jan 1, 1973
-
OFR-122(4)-80 Alumina Process Feasibility Study And Preliminary Plot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume IV - Appendix B - General Specification - Section 1 - Building Description1.0 Control House (DWG. NO. 56-401-G) - 1.1 Physical Description The Control House is a single story, 2728 square foot building with an adjacent transformer yard. A four foot overhang provides shad
Jan 1, 1979