Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Fragmentation by Blasting through Precise Initiation: Full Scale Trials at the Aitik Copper Mine

    By E Novikov, D Johansson, U Nyberg, A Beyglou, N Petropoulos

    Fragmentation is an important factor for improving downstream processes in mine operations. Six trials have been conducted at the Aitik copper mine to investigate the effect of ultra-short inter-hole

    Jan 1, 2014

  • ISEE
    Use of Explosives to Protect a Native Westslope Cutthroat Trout Population In the South Fork Madison River, Montana

    By Jeff Hiedeman, Clint Sestrich, Christopher Hyle

    Westslope Cutthroat trout have declined in distribution and abundance across their range and currently occupy about 59% of their historic habitat. Due to hybridization with non-native species such as

    Jan 1, 2011

  • ISEE
    Aquarium Tests to Study the Detonation Behaviour of a Non-ideal Explosive.

    By M. Araos

    Non-ideal explosives can be characterised by different methods like velocity of detonation measurement, double pipe tests, underwater tests, aquarium tests, etc., to name a few. Both aquarium and velo

    Jan 1, 2024

  • ISEE
    Description of Damage Constitutive Model as Documented in Pronto3D Manual 3/89

    By Billy J. Thorne

    The damage model in PRONTO simulates the dynamic fracture behavior of brittle rock. It is based on work started by Kipp and Grady, [lg] continued by Taylor, Chcn and Kuszmaul [I91 [20] and recently.mo

    Jan 1, 1989

  • ISEE
    Limestone Fragmentation Case Study Using Regular Rhythmic Timing

    By Tristan Worsey, Jhon Silva

    The paper discusses a limestone quarry case study that looks at change in fragmentation due to using different charge sequences when using the regular rhythmic timing method.

    Feb 1, 2020

  • ISEE
    Considerations in Blasting Influence on Grindability

    By Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta

    The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f

    Jan 1, 2015

  • ISEE
    Anti - Bomb Remote Controlled Inspection Robot

    By G. Geremia, M. I. Serrano, L. Costa, Strohaecker

    The advances in electronics and the development of more efficient algorithms, allow for the designing of more complex and sophisticated automated systems. The new devices include lighter, faster, reli

    Jan 1, 2010

  • ISEE
    How to Achieve 100% of Advance in Tunnel

    By Alan Diaz Butron, Eng. Thierry Bernard

    "In tunnel blasting the most challenging objective is definitively obtaining the maximum advanceassociated to a minimum overbreak. Achieving 100% of advance with no overbreak is the targetchallenge by

    Jan 1, 2017

  • ISEE
    Success Case: Technical and Operational Assurance of Blasting Near Neighboring Mine Structures

    By Hector O. Romero, Paulo C. Fernández A, Claudio C. Gajardo

    Phase 06 of the Los Bronces mine, currently under extraction for development, has the particularity of being close to the installations and buildings of a neighboring copper mine. Therefore, the blast

    Jan 21, 2025

  • ISEE
    Blasting Conditions Couldn't be Worse

    By John Atkinson, Steve Repola

    This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different

    Jan 1, 1993

  • ISEE
    Analysis of Environmental Effects Induced by Cautious Blasting During the Excavation of Istanbul Subway Construction

    By Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Ahmet Varol, Ertugrul Kaya, Turgay Ozat

    This paper presents analysis of environmental effects induced by cautious blasting during the construction of the Istanbul Subway 4 Levent - Ayazaga Darulsafaka Metro Tunnel Project carried out by the

    Jan 1, 2011

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    EU Type Certification of Non-Standard Electronic Initiations Systems used in Blasting at Mines and Quarries

    By Matthew Clay, Colin Chambers, Susan Hookham

    Opencast (quarries) and underground mines around the world use blasting methods to mine valuable ore. Traditional blasting systems use technologies such as electric delay detonator systems (developed

    Jan 1, 2017

  • ISEE
    Initial Testing of a Speed of Sound Test Apparatus for Powdered Explosives

    By Barbara Rutter, Shonn Kevin McNeil

    "This study discusses how a prototype was built to measure the sonic velocity in powdered explosives.The sonic velocity of an explosive is a benchmark to determine if the explosive deflagrates or deto

    Jan 1, 2017

  • ISEE
    Explosive Use for Avalanche Control

    By Don Bachman, Larry Heywood

    Artificial release of snow avalanches, through the use of explosives, is a necessary component of safety planning and operations for ski areas throughout the Western United States, as well as in other

    Jan 1, 1999

  • ISEE
    Debris Directionality Comparison: Full Scale Tests to Q/D and QRA

    By Lon Santis, Bill Evans, John Tatom

    Debris data from the Department of Defense Explosives Safety Board’s Project ESKIMORE full-scale explosives event test program are compared to quantity-distance (Q/D) standards and quantitative risk a

    Jan 1, 2015

  • ISEE
    Epic Blast of 275 US Ton (250 tonnes) Sets Benchmark in Opencast Mining Arena in Environmental Sensitive Area With Desired Fragmentation and Muck Profile.

    By Tapas Kumar Mukherjee, Sujit Kumar, Sanjay Kumar Singh

    This paper dwells on the epic blast conducted at Tata Steel’s captive coal mine in India and the insights drawn from it. Optimal blast design parameters had to be ascertained for operating benches (6.

    Jan 1, 2019

  • ISEE
    Determination of the Precise Origins of Air Overpressure Generated from Production Blasts at Melton Ross Quarry

    By C E. Johnson, S Hosein

    Previous researchers have put forward two different theories as to the origin of air overpressure from quarry blasting. In 1980, Siskind et al postulated that the initial face movement gave rise to th

    Jan 1, 2017

  • ISEE
    Journal: Fifty Years in Explosive Engineering The Story of a Determined Immigrant

    By Milos Bila

    The second half of 2008 and the first half of 2009 brought up important anniversaries. My old passport from Czechoslovakia has a stamp with date 10-10-1968 at 10:00 AM, the exact time I crossed the bo

    Jan 1, 2010

  • ISEE
    Electronic Accuracy Achieved with Non-Electric Initiation (7a8110cb-addf-409b-b1cc-4a8ccdd15ad7)

    By Sandy Tavelli, Thomas L. Barkley

    This discussion will present a case study in developing solutions to a metropolitan quarry’s public relations, legal, environmental, and productivity problems. It details an extensive and detailed pro

    Jan 1, 2004