Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Real-Time Prediction of Meteorological Effects on Airblast Levels

    By Adrian Moore, Alan Richards

    A real-time system for prediction of the effect of meteorological conditions on airblast overpressure levels has been established in the Hunter Valley Coalfield in Australia. Real-time meteorological

    Jan 1, 2009

  • ISEE
    E7B Sector Drilling and Blasting Challenges and Learnings

    By Robert Jacob Cefalo, Rio Tinto Kennecott

    At the end of 2016, the Mine started a new ore phase in the section of the pit located on the East Wall. The East Wall geological structures required controlled blasting for peak particle velocity (PP

    Jan 1, 2019

  • ISEE
    Performance Evaluation and Effects of Standoff on 10,500 grain per foot Linear Shaped Charge

    By Kevin Phelps, Jason Baird, Philip Mulligan, Dominique Nolan

    The basic metric for linear shaped charge performance is the amount of cutting distance that the charge can effectively yield given a specific standoff and target. Due to its size and restricted produ

    Jan 1, 2013

  • ISEE
    Low Level Continuous Vibration and Potential Damage

    By Edward J. Jr Walter, Edward J. Walter

    The vibration problem is approximately fifty years old. The original investigation of the U.S. Bureau of Mines was begun in 1930. Significant investigation into the problem was done by Crandell, Lange

    Jan 1, 1979

  • ISEE
    Proactive Controls for Highwall Stability

    By Trevor Ames

    Highwall instability, and sometimes referred to as ground failures, historically are a consistent contributor of mine injuries and fatalities within surface mines. To combat this several efforts, incl

    Jan 1, 2015

  • ISEE
    New Variables for Rock Fragmentation Management

    By Rafael Tadeu Pinto e Moura, Giorgio De Tomi, Jacopo Seccatore

    This paper describes a research and development project in an open-cast mine with the goal to achieve an average P80 of 300 mm (11,8”) in the run-of-mine (ROM) product without altering the existing bu

    Jan 1, 2015

  • ISEE
    New Dimensions for Drilling and Blasting In Surface Mining of Precious Metals

    By Tom Short, Paul Kunze

    In this paper, the authors describe major changes in drilling and blasting methods instituted at the Zortman And Landusky Mining Company Properties to maintain the viability of these north central Mon

    Jan 1, 1986

  • ISEE
    Earth Motions Resulting from Large Distributed Chemical Explosive Detonations

    By D Maxwell Ellett

    This report presents an evaluation of knowledge concerning a process used in predicting ground motion resulting from large scale conventional explosive detonations, The shots were set off in Arizona i

    Jan 1, 1976

  • ISEE
    A Survey of Blasting Vibration Regulations

    By Larry Schneider

    In 1998, the Blast Vibration and Seismograph Section of the International Society of Explosives Engineers formed a working group to collect and compile a list of regulations limiting ground vibrations

    Jan 1, 2000

  • ISEE
    A Reanalysis of Fragmentation Data from the Red Dog Mine

    By Finn Ouchterlony

    "Recently detailed fragmentation data from blasts fired with electronic delay detonators (EDDs) in the Red Dog mine in Alaska were presented. They include a comparison with pyrotechnic detonators ford

    Jan 1, 2012

  • ISEE
    Strategies for Creating or Rebuilding an ISEE Student Chapter

    By C. Kosloski, E. McCullough, A. Fox, S. Reed

    This paper serves as a reference guide for creating or strengthening student chapters of the International Society of Explosives Engineers. This includes chapters that are just starting, currently und

    Jan 1, 2016

  • ISEE
    Explosives in the Oil and Gas Industries: From Looking for the Deposit to Sealing the Well

    By Robert B. Hopler

    Explosives have been important to the oil and gas industries since the very earliest days. The first wells of Pennsylvania and New York in the 1860’s were able to be brought back to productivity by th

    Jan 1, 1998

  • ISEE
    Protection from Liability Before, During, and After Blast Detonation

    By Ralph E. Burnham, J. Kelly Ratliff

    "The words “dynamite,” “TNT,” “explosives,” and “blasting” typically cause the general public, andjurors, apprehension and fear. Although blasting operations conducted by well-trained, skilled, andexp

    Jan 1, 2016

  • ISEE
    Debris Collection Efforts Following a Large-scale AN Detonation

    By P. E. Hoffman, Joshua Ph. D.

    The Institute of Makers of Explosives (IME) led a post-detonation debris collection project in conjunction with a large AN railcar detonation conducted by the Department of Homeland SecurityTransporta

    Jan 1, 2019

  • ISEE
    A Computer Program to Predict the Probability of Overlap or Crowding of Adjacent-Period Millisecond-Delayed Initiators

    By Mark S. Stagg, Stephen A. Rholl

    The firing times of millisecond-delayed initiators are random variables that exhibit varying degrees of scatter. This scatter can cause crowding and overlap of adjacent delay periods, which results in

    Jan 1, 1988

  • ISEE
    250 Pound Down-Hole Drilling in Hard Rock

    By R L. Calhoun

    A paper on High Pressure Air must start with the industry accepted definition of High Pressure Air and, for the reader who is unfamiliar with High Pressure Air systems, include basic information on wh

    Jan 1, 1976

  • ISEE
    Open Pit Wall Control Analysis using Photogrammetry

    By Charles Zdazinsky

    Back-break induced from blasting is a concern in open pit metal mining because it compromises the conditions of the pit’s final walls. Final walls that have excessive blast induced damage commonly req

    Jan 1, 2014

  • ISEE
    Optimize Fragmentation with Shovel-Mounted Image Analysis Systems

    By Peter Cameron, Tom BoBo

    Comminution, being the energy intensive part of a mining operation receives much scrutiny by cost controllers, CEO’s, investors and others as the mining industry goes “back to basics” to reverse the d

    Jan 1, 2019

  • ISEE
    Benchmarking Drill and Blast Compliance to Design, A Case Study

    By Alan Tordoir, Mark Roberts

    The drill and blast process is a critical function within the production cycle which significantly impacts the ability of an operation to effectively meet its safety and production targets. Acknowledg

    Jan 1, 2019

  • ISEE
    Design Criteria for In-Situ Mining of Hard Rock Ore Deposits

    By M E. Hanson, K Chong, R H. Jacobson, S C. Way

    To create conditions for economic rates of mineral recovery in a deep, hard rock mass, enhancement of naturally occurring permeability is necessary, and may be achieved through explosives detonated in

    Jan 1, 1983