Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Experiences in the Installation and Commissioning of Semi-Autogenous Grinding Circuits

    By M. J. Allan

    "The paper describes the author's experiences in the startup of autogenous and semiautogenous grinding circuits gained over the last twenty years on both large and small grinding circuits. Typical pha

    Jan 1, 1992

  • CIM
    Simultaneous Optimization of Ultimate Pit and Production Scheduling Using a Heuristic Approach

    By A. K. Mahto, B. Samanta

    "A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the imp

    Jan 1, 2017

  • CIM
    Application of Skarn Deposit Zonation Models to Mineral Exploration

    By Lawrence D. Meinert

    Abstract-Most large skarn deposits are zoned in both space and time relative to associated intrusions. Zonation occurs on scales from kilometers to micrometers, and reflects infiltrative fluid flow, w

    Jan 1, 1997

  • CIM
    New Developments in Ion Exchange Resins for the Recovery of Gold from Complex Ores

    By J. van Deventer

    Volatile gold prices in the face of rising costs for mining and refining is causing the mines to look for new ways to reduce costs and increase recoveries. This task is complicated by the fact that th

    Jan 1, 2014

  • CIM
    Environmental and Ventilation Benefits for Underground Mining Operations Using Fuel Cell Powered Production Equipment

    By Charles Kocsis

    Over the last few years a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell powered equipment into underground mines to replaced diesel engine powered equipmen

    May 1, 2007

  • CIM
    Conception et installation d?un soutènement actif avec câbles d?ancrage à la Mine-laboratoire, Val-d?Or, Québec, Canada.

    By Denis Labrie

    Résumé Cent soixante (160) câbles d'ancrage ont été installés au toit de la rampe à la Mine-laboratoire de CANMET à Val-d'Or, Qué bec, Canada, pour prévenir toute dégradation suite à l&apo

    May 1, 2001

  • CIM
    Froth Based Indicators as a Tool for Flotation Diagnosis

    By Patrick Pelletier Jr., Pierre-Alexandre Bossé, Gianni Bartolacci, Ian Orford, Steve Parent

    "Over the last decades, many authors have shown the importance of froth in the flotation process. Mineral recovery is related to froth recovery and flotation. Selectivity is affected by froth characte

    Jan 1, 2006

  • CIM
    Flow Visualization of Newtonian and Non-Newtonian Fluids in High Pressure Die Casting

    By D. Bouchard, M. Forté, A. Charette

    A transparent replica of a casting die was built to achieve a better understanding of the filling mechanisms of aluminum in high pressure die casting. Water and tomato paste were respectively used as

    Jan 1, 2006

  • CIM
    Radon Decay Products and their Application to Uranium Exploration

    By Cardm Jeffrey W.

    The decay of 222 Rn yields a series of short-lived decay products which become attached to the surface of a plate or wire exposed in a 222Rn-bearing atmosphere. The alpha-activity of two of the decay

    Jan 1, 1979

  • CIM
    Golden Giant Mine Mill Process Description and Operating Highlights

    By R. Tessier, C. R. Larsen

    "INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca

    Jan 1, 1986

  • CIM
    Predicting HVAC Energy Consumption in Commercial Buildings Using Multiagent Systems

    By Nn Li

    Energy consumption in commercial buildings has been increasing rapidly in the past decade. The knowledge of future energy consumption can bring significant value to commercial building energy manageme

    Aug 1, 2013

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Mining Methods and Costs at the Josephine Mine

    By Alan E. Gallie

    One of the requirements for the successful waging of war is an unlimited supply of iron ore. In the spring of 1941 the demand for iron ore was expected to exceed the supply. This was particularly so i

    Jan 1, 1947

  • CIM
    Erosion/Corrosion Effects on the Design and Maintenance of a Potash Refinery

    By J. Davis, M. G. Reading

    "INTRODUCTIONInternational Minerals and Chemical Corporation (Canada) Limited operates two potash mine/refinery complexes near Esterhazy, Saskatchewan. Annual production of approximately 4.2 million t

    Jan 1, 1983

  • CIM
    The Importance of Structural Geological Mapping and Slope Monitoring in Open Pit Slope Stability

    By Nick D. Rose

    The importance of structural geology in open pit slope stability is overlooked in many mining operations due to pressures to cut costs and minimize mine personnel. As a result, mine geology staff are

    May 1, 2002

  • CIM
    Technological Advances in Telecommunications for Mines

    By Patrick M. Y. Waye

    As mines utilise more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological ad

    May 1, 2001

  • CIM
    Changes in grade, volume and contained gold during the mining life-cycle of gold placer deposits

    By J. D. Bliss, G. J. Orris, W. O. Menzie

    "Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and

    Jan 1, 1987

  • CIM
    Simple Mechanisation of Narrow Vein Deposits in South Africa

    By Julian Wills

    The Candrill was developed with Soredem as a one-operator rockdrill for Canadian narrow vein mining. It provides the benefits of increased drilling rates, lower noise and vibration, mass reduction of

    Oct 1, 2001

  • CIM
    Experimental and Numerical Investigations of Fluid Flow in a Hydrocyclone without an Air Core (d88f233a-ce1e-49c1-9b46-b4bcf43d4ac4)

    By J. R. Kadambi, J. Furlan, Kucukal E.

    "Hydrocyclones are used in various industrial applications, including mineral processing and tailings management, to separate or classify solid particles and/or liquid droplets from multiphase feed. T

    Jan 1, 2017

  • CIM
    An integrated approach to modelling, design and optimisation of the flotation plant at the Red Dog concentrator

    By Barun Gorain, Andy Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2002