Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Practical Considerations in the Operation of Gold Gravity Circuits

    By A. Putz, F. Vincent, A. R. Laplante

    "This paper briefly reviews some of the gravity research done at McGill University and current Canadian operating practices, with emphasis on results of interest for operators. The following topics ar

    Jan 1, 1994

  • CIM
    Geology and Exploration History of the Amalgamated Kirkland Deposit, Kirkland Lake, Ontario (0ce750d4-e676-40c0-a003-974cb6f8cb76)

    By Mark W. Masson, David B. Stevenson, David W. Broughton, Douglas R. Cruji, Steven E. Parry

    "The Amalgamated Kirkland gold deposit is located at Kirkland Lake, Ontario, within the Archean Abitibi Greenstone belt of the Canadian Shield. It lies on a fault or “break”, termed the Cyprus Break,

    Jan 1, 1995

  • CIM
    Manning Best Practice in Australia

    By Stephen Williams

    This paper examines manning best practice in the Australian mining industry. In particular, the paper considers a range of mining operations and their manning levels as measured by operational benchma

    May 1, 2009

  • CIM
    Level and Solids Profile Detection in Thickeners

    By A. Probst, J. A. Finch

    "Solids concentration (% solids) profiles and the clear liquid/slurry interface level (mudline) were determined from conductivity measurements in thickeners at Falconbridge' s Strathcona mill (Ni conc

    Jan 1, 1993

  • CIM
    PEC uranium deposit Hornby Bay Basin, Northwest Territories

    By C. M. Trigg

    "PEC uranium deposit, 100 km southwest of Coppermine, was discovered by diamond drilling in 1976 following ground and airborne geophysical surveys, geological mapping, geochemical surveys and boulder

    Jan 1, 1986

  • CIM
    On the use of Limestone Drains in the Passive Treatment of Acid Mine Drainage (AMD).

    By Louis R. Bernier

    Most systematic studies carried out on passive treatment systems incorporating the use of limestone drains, under aerobic or anaerobic conditions, essentially deal with the treatment of effluents from

    Nov 1, 2002

  • CIM
    Recovery of Rare Metals from Spent Hydrodesulphurization Catalyst

    By J. Shibata, K. Manabe, A. Fuji, N. Matsunaga, D. Murakami, Yamaguchi University, T. Suzuki

    "Spent hydrodesulphurization (HDS) catalyst contains rare metals such as cobalt, nickel (Ni), molybdenum (Mo), and vanadium (V). The overall objective of this project is to develop a hydrometallurgica

    Jan 1, 2016

  • CIM
    The Benefits of AG Milling for Diamond Liberation when Processing Soft Kimberlites (e79715fa-d210-4775-a49c-94a480574caf)

    By J. E. Danoczi, J. A. Herbst

    "Shore Gold Inc. (Shore) is presently designing a diamond processing plant for the Star and the Orion South kimberlite deposits in the Fort à la Corne (FalC) area in central Saskatchewan. The first st

    Jan 1, 2012

  • CIM
    The Serra Verde Rare Earth Deposit, Goias State, Brazil: Advancing to Production

    By Denilson Coutinho, Euler Soares, Paulo de Tarso, Jordana Ferreira, John R. Goode, Andreas Sprecher, Alexandre Rocha

    The Serra Verde Project is located in the northern part of Goiás state, Brazil, and comprises 49 mineral claims covering an area of 69,814 ha. The Serra Verde deposit is a rare earth element (REE) enr

    Jan 1, 2014

  • CIM
    Continuous minicell test of collectorless flotation at Mattabi Mines Ltd.

    By M. Leroux, S. R. Rao, J. Kim, J. A. Finch

    "Continuous in-plant testing of collectorless Cu/Pb bulk flotation on Lyon Lake ore at Matlabi Mines Ltd. Was conducted using a portable circuit based on 5 L mini flotation cells. It is concluded that

    Jan 1, 1994

  • CIM
    Design of the jointed roof in stratified rock based on the voussoir beam mechanism

    By P. Mottahed, J. Ran

    Mining practice and research have shown that the jointed roof in stratified rock behaves like a voussoir beam structure with strength greater than that determined by the continuous beam theory. Previo

    Jan 1, 1995

  • CIM
    Carbon Concentration Measurement and Control in a Counter Current Carbon Adsorption Circuit

    The control of carbon concentration in a counter current carbon absorption circuit is critical to optimise gold recovery. MINTEK has developed a carbon movement controller to address this potentially

    Jan 1, 2014

  • CIM
    Austin Gold Venture Bioleaching: Project Summary

    By J. Kuipers, R. W. Lawrence, P. B. Marchant, W. Brooks, J. T. Chapman

    "Bioleach testing and piloting was conducted on refractory gold sulphide concentrate from Austin Gold Venture in Nevada during 1988. The objective of the test programme was to determine the technical

    Jan 1, 1989

  • CIM
    Review of Boliden Harjavalta Copper Smelter

    By P. Latostenmaa, T. Veneranta, J. Järvi, E. J. Peuraniemi

    Boliden Harjavalta has operated a copper flash smelter since 1949 thus the smelter celebrates 70th anniversary of flash smelting in 2019. This paper shortly describes the historical perspective of the

    Jan 1, 2019

  • CIM
    Operating Risk Valuation for Optimization of Underground Metal Mining Systems: Assessment and Aplications

    By S. A. Kenzap

    This paper provides an overview and discussion of key aspects of operating risk valuation in underground metal mining systems, with impact on project economics, using stochastic computer modelling in

    Aug 1, 2013

  • CIM
    The Addition of Fines to Improve Rod Mill Performance at FroodStobie Mill

    By J. R. Shore, F. G. M. Gillett, E. J. Zickar

    "The addition of fines to rod mill feed has been employed at Inco Metals' Frood-Stobie Mill since 1973. The fines, which act as a ""lubricant"", causes an increase in the pulp fluidity and assists the

    Jan 1, 1981

  • CIM
    Evaluation of Scale up Effect on High Pressure Grinding Roll (HPGR) Implementation at Pt Freeport Indonesia (cdb77a25-01d8-4e23-be0d-f16f699bd6bc)

    By J. Mosher, G. Banini, J. Hollow, A. Villanueva

    Prior to installation of High Pressure Grinding Rolls (HPGR) at PT Freeport Indonesia (PT-FI) a series of laboratory tests were carried out to determine the design parameters and also determine key pe

    Jan 1, 2012

  • CIM
    Thermodynamic Assessment of Ternary NiCrAl Alloys from Calculations to Experiments

    By R. C. Reed, L. T. Wu, H. C. Harada, K. Kawagish, R. T. Wu

    Oxidation of pure metals is a chemical reaction in which the metal loses one or more electrons, such that the atom of the metal changes from the neutral state to a positively charge ion and reacts wit

    Jan 1, 2010

  • CIM
    Cu-Ni-PGE Mineralization within the Copper Cliff Offset Dike, Copper Cliff North Mine, Sudbury, Ontario: Evidence for Multiple Stages of Emplacement

    By J. H. Rickard, D. H. Watkinson

    "Abstract - Detailed petrographic and quantitative (electron microprobe, SEM-EDS) mineralchemical analyses of sulfide ore from the 100 orebody at the Copper Cliff North mine, Copper Cliff, Ontario, re

    Jan 1, 2001

  • CIM
    The use of Multispectral Remote Sensing to Map Reclaimed Areas at Highland Valley Copper

    By Mark Richards

    Highland Valley Copper is a large, open-pit copper mine in the southern interior of British Columbia. Reclamation has been in progress on the site since 1987. Some 6,300 hectares will have been distur

    May 1, 2003