Inco roast-reduction smelting of nickel concentrateBy C. Díaz, A. D. Dalvi, C. E. O'Neill
"Roast-reduction smelting (RRS) of nickel concentrate, combined with flash smelting of copper concentrate, was one of the process options that Inco considered as a means of meeting its 1994 sulphur di
Jan 1, 1994
-
Effect of Pore Pressure on the Three-Dimensional Limiting Envelope of a Porous RockBy J. -P. Tshibangu, M. Ramos da Silva, F. Descamps, C. Schroeder, J. -C. Verbrugge
"The mechanical behaviour of rock materials is largely influenced by the stress state and pore pressure; this needs to be considered in many applications, such as petroleum engineering, tunnelling or
Jan 1, 2015
-
Development of New Erbia-Doped Yttria Stabilized Zirconia Solid Solutions via Spark Plasma SinteringBy L. Bichler, C. J. Verdon
In this work, the effect of doping yttria stabilized zirconia (YSZ) with 5, 10 and 15 mol% erbium oxide (Er2O3, erbia) was investigated using spark plasma sintering (SPS) technique. Sintering was carr
Jan 1, 2014
-
Review of the Flotation Circuit at the Laronde ConcentratorBy J. Robitaille, P. Cousin
"Agnico-Eagle Mines Ltd, Laronde Division, is a gold operation processing ore containing copper and zinc. Copper is recovered as a concentrate prior to gold cyanidation.Copper concentrate grade was im
Jan 1, 1995
-
Economic Benefits of Operating a Copper Electrorefining Tankhouse at High Current Density Using the Mettop-BRX-TechnologyBy I. Filzwieser, S. Konetschnik, A. Filzwieser, A. Anzinger
Production in copper electrorefining tankhouses mainly depend on two factors: The deposition area, which is a result of the amount of installed cells and cathodes, as well as the current density - the
Jan 1, 2014
-
Mining in Canada - HR Challenges and OpportunitiesOverview of Presentation ?About MiHR ?Human Resources Challenges in the Minerals and Metals Industry ?Getting the Facts -Sector Study Project ?Key Findings ?Recommendations ?Conclusions ?Mi
May 1, 2006
-
Estimating Fluoride Emissions from Partially Enclosed Spent AnodesBy E. Demedde
Carbon anodes in aluminium reduction cells are continuously consumed during electrolysis. In prebake cells the anodes are replaced at regular intervals. The spent anodes, called butts, are often allow
Jan 1, 2006
-
Gamma-ray Logging and Radioelement Distribution in the Fort à la Corne Kimberlite Pipe 169By B. A. Kjarsgaard, C. J. Mwenifumbo
"Abstract - Natural gamma-ray measurements were made in the GSC Smeaton drillhole as part of the borehole geophysical classification of kimberlite pipe 169. In addition, forty samples of Cretaceous se
Jan 1, 1999
-
Coal and Communities in Vietnam the Lang Cam Coal MineBy Marke Wong
? Vietnam?s economy is growing so fast that gross domestic product (GDP) growth remained above 8% in 2005 and exports are rising steadily at 25% per year. ? Demand for electricity is expected to inc
May 1, 2006
-
40 Years of Flash Smelting Operations in Huelva: Learning from our HistoryBy J. C. Moreno, G. Rios, M. Palacios
The Huelva smelter was commissioned in 1970 coinciding with the shutdown of the old smelter in the Rio Tinto mine site. That new smelter consisted of two Momoda blast furnaces with a capacity of 500 d
Jan 1, 2014
-
Study of the dynamic stability of mine waste dumpsBy B. Stuckert, P. Sheehan, J. Balfour, B. (Manas) Das, D. Fawcett
"With the growth of large scale surface mining operations, waste disposal and stability of waste dumps pose a challenging problem to engineers. Vibrations due to blasting operations proximal to these
Jan 1, 1989
-
Gibraltar Mine SAG Mill Expansion Grinding Ciruit Design (5e5517e1-bab6-43d2-8866-c7d882036c0e)By R. J. Rotzinger, K. W. Major
The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du
Jan 1, 2012
-
Plasma spray forming of coatings and partsBy S. Dallaire
With the attainment of high temperatures it becomes possible to process any kind of material (particularly ceramics) in their liquid state. In the plasma spraying process, the material to be sprayed i
Jan 1, 1987
-
TPH/Cubic Metre - An Alternative View on High Density Thickener Design & GeometryBy David Minson
On many occasions, operators have seen that high density and paste thickener performance does not meet the initial design expectations, and the installed equipment produces lower than expected thicken
Jan 1, 2019
-
Rock anchor support systems at Smoky River Coal Limited, Grande Cache, Alberta (b00134fd-f294-4823-b57d-05c31c7f1dcd)By R. F. Dawson, A. S. Bagnall, K. Barron
"At Smoky River Coal Limited (SRCL), economic occurrences of structurally thickened coal deposits form attractive surface mining targets. These steeply dipping, structurally complex deposits require t
Jan 1, 1995
-
Precious metals scavenging at Equity Silver Mines LimitedBy P. B. Marchant
"Considerable gold and silver values are lost to flotation tailing from both the South ern Tail orebody and the Main Zone orebody,The underlying mineralogical assemblage of the two ore types is quite
Jan 1, 1986
-
Energy conservation at Inco Metals Company: Frood-Stobie mill-heating and ventilating systemBy C. R. Kerr
"This paper describes the revisions to the heating and ventilating system at the Frood-Stobie mill, which resulted in substantial savings in energy costs.IntroductionInco Metals Company, a unit of Inc
Jan 1, 1981
-
Recent New Brunswick agreements for oil shale and potash: unique arrangements or the beginning of a trendBy Dallas W. Davis
"Since May 1980, New Brunswick has called separate tenders for the right to explore and develop several potash prospects, as well as areas underlain by Alberta oil shale. These tender calls had in com
Jan 1, 1983
-
Injectable Resin ? A Highly Adaptable Ground Support Anchoring SystemBy Chris J. Pritchard
Pumpable, two-component resins for anchoring rock bolts provides significant advantages over traditional cartridge resin and cement grout systems where fast and easily adaptable support is required fo
May 1, 2011
-
The performance of fixed guidance systems in mine shaftsBy L. C. Galloway, P. M. Tiley
"Some progress has already been made in defining the parameters which will determine the performance of a guidance system in a mine shaft. Very little information is available, however, to help design