Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Chapter III-Continued - Part 4. - Little Long Lac-Sturgeon River Area - General Structural Relationships of Ore Deposits in the Little Long Lac-Sturgeon River Area

    By H. Clare Horwood

    "In the Little Long Lac-Sturgeon River area of Thunder Bay district, Ontario, most of the known ore deposits occur in fractures, shear zones, and zones of brecciation, in folded sedimentary rocks . In

    Jan 1, 1954

  • CIM
    Effect of Additional Shear Strain on Recrystallization Texture Formation in a Hot Rolled Al-Fe Alloy

    By K. Ihara, T. Yamaguchi, K. Matsumoto

    "Al-Fe alloy sheets having layers with different strain components were produced by unlubricated hot rolling and the recrystallization texture formation during annealing was investigated in each layer

    Jan 1, 2018

  • CIM
    Suggested Support System for a Mining Tunnel in the E1 Longwall Panel of the Parvade1 Underground Coal Mine: The Finite Element Method

    By B. Oraee-Mirzamani

    One the most important tasks after excavation of tunnels is the implementation and installation of a support system. Tunnel collapse poses a safety hazard and can cause worker injuries. In addition, i

    Aug 1, 2013

  • CIM
    A Framework to Generate Accurate and Complete as-Built BIMS Based on Progressive Laser Scans

    By Te Gao

    It is a general expectancy that in most of the construction and renovation project, the contractor is going to hand over the as-built documents to the owner or the facility management team at the comp

    Aug 1, 2013

  • CIM
    Flottation Non-Sélective des Minéraux Sulfures Appliquée dans la Gestion Environnementale des Rejets Miniers

    By Mostafa Benzaazoua, Bruno Bussière, Jean Lelièvre

    De nombreuses opérations mimères exploitent et traitent des minerais sulfurés pour concentrer des métaux precieux (Au, Ag ... ) OU des métaux de base (Cu, Pb, Zn ... ), laissant en fin de parcours des

    Jan 1, 1998

  • CIM
    Impurities in the lead concentrate of Brunswick Mining and Smelting and their behaviour in the lead blast furnace

    By W. Petruk, D. R. Morris

    "The lead concentrate produced from the volcanogenic base metal ore of Brunswick Mining and Smelting in New Brunswick contains major to trace amounts of iron, zinc, cadmium, arsenic, antimony, copper,

    Jan 1, 1985

  • CIM
    Tentative identification of chemical elements likely to escape in the atmosphere at the Lingan coal-fired power plant, Lingan, Nova Scotia

    By Erwin L. Zodrow

    "For 25 chemical elements in electrostatically precipitated fly ash (Lingan coal-fired power station), concentration changes are studied as a function of increasing proportions of fines (ash particle

    Jan 1, 1982

  • CIM
    Controlled blasting in hard intense jointed rock in tunnels

    By Törbjorn Naarttijärvi, Bengt Ludvig, Agne Rustan

    "Falling rock is one of the major causes of serious injuries and deaths in Swedish mines. The research at the Division of Mining and Underground Construction was therefore directed toward controlled b

    Jan 1, 1985

  • CIM
    An Overview of the ULU Gold Deposit, High Lake Volcanic Belt, Nunavut, Canada

    By R. Carpenter, H. Muntanion, P. Kleespies, E. Flood, M. Tansey

    Abstract - BHP Minerals discovered the Archean lode gold ULU deposit on the western margin of the High Lake Volcanic Belt in 1989. The greenschist to amphibolite facies mafic volcanic and sedimentary

    Jan 1, 2004

  • CIM
    A new initiating system and its testing instruments

    By Liu Liching, Yan Hongjiu

    "In China, the electromagnetic induction initiating system f or blasting engineering has been greatly developed in recent years. With this system, the total number of detonators that may be blasted in

    Jan 1, 1988

  • CIM
    Copper Smelter Projects: Installation and Operation of Large Kumera Steam Dryers

    By S. L. Chen

    The Kumera Technology Center developed a unique type of steam dryer for drying copper concentrate in the mid 1990s. The dryer has been chosen in several copper smelter projects since 1999. To expand p

    Jan 1, 2007

  • CIM
    Design and Optimisation of a New Hydrometallurgical Processing Route for Copper Recycling Using Process Simulation

    By A. de Ville d’Avray, G. Guezennec, P. Wavrer, E. Braak

    The aim of the European CEReS project was to develop an innovative copper recycling route based on the coprocessing of coal production waste by bioleaching and printed circuit boards (PCBs) from Waste

    Jan 1, 2019

  • CIM
    Placage au cuivre de la fibre d'amiante chrysotile

    By J. Lapointe, S. Leger, D. Proulx

    "Une méthode non-électrolytique est utilisée pour plaquer au cuivre la fibre d'amiante chrysotite. En variant les paramètres de placage du bain, on détermine les conditions optimales du taux de d

    Jan 1, 1985

  • CIM
    Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon

    By J. M. Cooper

    The HBMS reverb furnace in Flin Flon was originally designed in the late 1920s. Throughout the decades campaign life has been increased due to operational practices, technological changes and brick qu

    Jan 1, 2007

  • CIM
    A future for flow-through?

    By Robert B. Parsons

    "There is a widespread concern that certain of Finance Minister Michael Wilson's Tax Reform proposals will likely lead to a significant decline in flow through funding after 1988. This does not b

    Jan 1, 1987

  • CIM
    Cretaceous non-swelling bentonite from the Manitoba Escarpment

    By BARRY BANNATYNE

    Non-swelling bentonite has been quarried in Manitoba by Pembina Mountain Clays Limited since 1941. It occurs in several thin layers near the base of the Pembina Member of the Upper Cretaceous Vermilio

    Jan 1, 1984

  • CIM
    Conversion from "post" pillar cut-and-fill mining to blasthole-a case study at Falconbridge

    By J. Lebl, S. Bharti, D. J. Cornett

    "This paper presents the design and application of blasthole mining to an area at Strathcona Mine previously employing post pillar cut-and-fill. Extensive mining in the area had led to gradually deter

    Jan 1, 1983

  • CIM
    Solutions to pillar design in plastically behaving rocks

    By D. Mraz

    "In certain instances, rocks around underground excavations behave as a plastic mass. This paper offers several solutions to predicting the mode of plastic flow around cavities and designing mining pi

    Jan 1, 1984

  • CIM
    Air-decking techniques for controlled blasting in open pits

    By F. Urekar, R. B. Pankhurst

    "Air spaces and air gaps in an explosives column are known to allow greater distribution and cushioning of explosive energy from the rock mass. This energy distribution is enhanced if the explosives &

    Jan 1, 1988

  • CIM
    On-Stream Analysis by X-Ray Spectrograph

    By P. Shibley, P. R. Clarke

    Since this was an interim report of the initial operation of a long term project it is not available for publication. It is expected when the project is completed a full report of the work will be pub

    Jan 1, 1968