Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Grain Selection during Epitaxial Growth of Welded Nickel-Based AlloyBy T. Billotte, G. Tirand, J. Zollinger, V. Robin, B. Rouat, D. Daloz
The grain structure prediction of metallic alloys during a welding process is often an issue. In addition to the welding parameters and the alloy nominal composition and properties, the base metal gra
Jan 1, 2015
-
Coal Mining at Drinnan, AlbertaBy R. T. McAndrew
Introduction Drinnan is situated in the Prairie Creek coal area in the Foothills belt of Alberta. It lies on the main line of the Canadian National railway from Edmonton to Jasper. The exact locatio
Jan 1, 1931
-
Strip Pit Mining in Coalspur Area, AlbertaBy W. C. Whittaker
Introduction When one thinks of a coal stripping deposit, the picture that usually comes to mind is that of a more or less flat seam from two to twenty feet in thickness overlain by ten to fifty feet
Jan 1, 1935
-
High Productivity Zinc Electrowinning PlantBy M. L. Connolly
Zinc production by Cominco Ltd. began in Trail in 1916 at a rate of 55 metric tonnes per day (t/d) and was increased ,in several increments until now electrowinning capacity approaches 750 t/d. The la
Jan 1, 1977
-
Hollinger Shaft PracticeBy V. J. Southey
HOLLINGER mining operations have required development by 24 vertical shafts having a total length of 28,160 feet. Seventeen of these are sunk from surface and seven are interior shafts. Four surface s
Jan 1, 1939
-
CCARM's* research on mining simulators and their role in maintenance and trainingBy J. B. Edwards
"The case is presented for the use of simulators for the computer-based training (CBT) of mining plant operators and for introducing them to automatically controlled systems. As well as their use in t
Jan 1, 1990
-
Geology and Mineral Occurrences of Lemieux-Lesseps, Gaspe, P. Q.By Jean-Louis Robert
Field work inaugurated in 1962 in the townships of Lemieux and Lesseps, in the Gaspe Peninsula of Quebec, has permitted the author to delineate the lithologic units of the area, to elucidate a few str
Jan 1, 1966
-
Advantages of Bottom Entry Oxygen Introduction for Pressure OxidationBy J. Lammers, D. Adams
Most pressure oxidation operations introduce oxygen through a large multi-use nozzle in the vapour space of the autoclave. Sparge pipes extend inside the vessel to the point of discharge below the com
Jan 1, 2004
-
Performance of Rock Slopes during the 2010/11 Canterbury Earthquakes (New Zealand)By G. Archibald, M. McSaveney, J. Wartman, M. Yetton, C. Massey, C. Holden, A. Kaiser
"The 2010/11 Canterbury earthquakes triggered many mass movements in the Port Hills including rockfalls, rock and debris avalanches, slides and slumps and associated cliff-top cracking. The most abund
Jan 1, 2015
-
Cyanide Recovery by Solvent Extraction in a Continuous Pilot PlantBy M. Hames, K. Larmour-Ship, B. Grinbaum, E. Buchalter, R. Hackl, B. Wassink
Sodium cyanide continues to be the lixiviant of choice for gold dissolution. Many gold ore-bodies contain a significant amount of cyanide-soluble copper which increases the cost of processing due to h
Jan 1, 2005
-
Processing History at Vale Europe’s (Inco’s) Nickel Refinery in Clydach, WalesBy K. Lascelles
ABSTRACT Nickel compounds vary significantly in their toxicological properties, so it is critical that continuing studies to accurately quantify worker exposures consider the processing that accompani
Jan 1, 2013
-
Metallurgical Optimisation after the Replacement of two BOF Vessels at Dillinger Hütte/GermanyBy V. Fiedler, H. Lachmund, R. Bruckhaus
"After producing some 50 million tonnes of crude steel the two BOF vessels at Dillinger Hüitte steel plant had to be replaced in 2000/01 due to large deformations. The new vessel design was optimised
Jan 1, 2004
-
High-Speed Development of a 2,000-foot 12-degree DeclineBy M. D. Lawton, P. Steen
"Drilling results from the established levels at AngloRouyn Mines Limited had indicated inadequate tonnages to meet the planning schedule. It was decided to develop the main zone of the orebody below
Jan 1, 1971
-
Polarographic and Amperometric Methods Applied to Metallurgical Analysis*By A Hitchen
A general outline is given for the determination of copper, nickel, cobalt, zinc, lead, cadmium, bismuth, manganese, uranium, molybdenum, vanadium, sulphate and fluoride by polarographic or amperometr
Jan 1, 1965
-
Fast Analysis of Washability Parameters for Process ControlBy Helge B. Wurst, Michael P. Cipold, Jan F. Bachmann, Claus C. Bachmann
"In washability, the objective is to establish the set of maximum possible separation performance criteria for a given mineral feed. The method of choice for this has been the conventional sink-float
Jan 1, 2016
-
Operating Experience with Friction-Type Mine Hoists at Geco Mines LimitedBy R R. Wainwright
Friction-type hoists have been in operation at Geco Mines Limited since Septtember, 1957. At the end of the year 1963, the skip hoist had handled nearly ~ million tons of ore and waste. In March, 1962
Jan 1, 1965
-
Environmental Control in the Asbestos Industry of Quebec"The asbestos mining industry in the Eastern Townships of Quebec has early recognized the undesirable side-effects associated with mineral production, such as air pollution, noise and unsightly waste
Jan 1, 1971
-
Mineralogical Characteristics and Beneficiation of An Oolitic Iron Ore From the Peace River District, AlbertaBy W. Petruk
Mineralogical studies and concentration tests were conducted on samples from an oolitic iron deposit from the Peace River district in Alberta to determine what concentrate grades and metal recoveries
Jan 1, 1977
-
Application of Flocculants In Hydrocyclone SeparationBy H. A. Hamza, J. Visman
"This is a report on the combined application of ""long-chain"" flocculants and classifier cyclones in the field of slimes treatment, with emphasis on the simultaneous thickening and clarifying of ind
Jan 1, 1973
-
Fire in No. II South, No. 26 Colliery, Glace BayBy W. Leblanc, J. Phalen
This paper tells the story of a serious mine fire on a mechanized longwall face in a submarine coal mine at Glace Bay, Nova Scotia. The story gives, in chronological order, a technical account of the
Jan 1, 1976