Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Systems Approach to the Planning of Coal Resource Investigation and Mining Development

    By White B

    A novel approach is suggested for the solution of planning and development problems in the coal, mining industry. The formation of coal measures depends to a significant extent on sequential geolog

    Jan 1, 1987

  • AUSIMM
    Development of the West Cliff Extended Project

    In the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti

    Jan 1, 1983

  • AUSIMM
    Multivariate Conditional Simulation of Iron Ore Deposits - Advantages Over Models Made Using Ordinary Kriging

    Mine planning studies of iron ore deposits are often based on resource models generated by ordinary kriging. Ordinary kriging aims for local accuracy to minimise the variance of expected estimation er

    Jan 1, 2009

  • AUSIMM
    Geology in Exploration

    In Australia 'there are hidden deposits of gold, copper, tin, lead and zinc which can be found by drilling at reasonable expense in view of the imp9rtance of the objectives. Exploration of the pr

    Jan 1, 1946

  • AUSIMM
    Electromagnetic Testing of Mine Winding Ropes û The Field Pattern of an Internal Broken Wire

    With the recent wider introduction of friction hoists of the Koepe type. for winding from depths of more than 3000 feet it has been found that failure by fatigue is the most common form of rope det

    Jan 1, 1971

  • AUSIMM
    Mount Isa Copper Mines ù Stope Design in the Southern Hanging Wall Lens

    XstrataÆs Mount Isa Copper Operations (MICO) is a world-class mining operation producing in excess of six million tonnes of copper ore per annum from its underground mining operations. The Mount Isa C

    Jan 1, 2006

  • AUSIMM
    Computational Fluid Dynamics Modelling of Slimes Flotation at Mt Keith Operations

    By M P. Schwarz

    This paper describes modelling studies of the flotation cells used by BHP Billiton Nickel West Ltd in the slimes circuit at Mt Keith. The aim is to achieve a better understanding of the hydrodynamic l

    Jan 1, 2008

  • AUSIMM
    Deep Aquifer Shutdown Tests at Yallourn Mine

    By M Coulthard, J Rivalland, K Dugan

    Prior to 2001 Yallourn Mine has pumped approximately 1000 Megalitres of water per annum from aquifers beneath the mine floor in order to control aquifer pressures that were thought to have an influenc

    Jan 1, 2003

  • AUSIMM
    Notes on the Felspar Deposits of Broken Hill

    Felspar occurs in association with quartz in the Broken Hill lode pegmatites and is brilliant green, greenish white, and white in colour. The pegmatites occur mainly in the walls in sporadic patches,

    Jan 1, 1946

  • AUSIMM
    Development Concept in the Mining Industry - An Accelerator to Achieve Regional Sustainable Development

    By F A. Rosyid

    Mineral resources are national assets which must be capitalised for national development. Those assets should be transferred into real economic capital and then into social capital to achieve national

    Jan 1, 2008

  • AUSIMM
    Octanes and Knock in Petrol Engines

    The subject of octanes and knock in petrol engines is of general interest, not only to the engineers and chemists in the petroleum and automotive industries, but also to the motorist who wishes to see

    Jan 1, 1951

  • AUSIMM
    Presidential Address, 1967 Overseas Investment in the Australian Mining Industry

    There was a time, in the memory of some here tonight, when the annual meeting of The Institute was a nostalgic occasion. Often, in the 1920s, there was comment on the decline of Australian mining and

    Jan 1, 1967

  • AUSIMM
    The Water Footprint of Mining Operations in Space and Time - A New Paradigm for Sustainability Assessments?

    As the mining sector increasingly embraces the sustainability agenda, and implements thorough environmental reporting in support of its case for a continued æsocial licence to operateÆ, there is a nee

    Jan 1, 2006

  • AUSIMM
    Commissioning and Optimisation of the Phu Kham Copper-Gold Concentrator

    By G Harbort, T Georgiev, M Phillips

    Phu Bia Mining Ltd, a subsidiary of Pan Australian Resources Ltd owns and operates the Phu Kham copper concentrator located in the Xaysomboun District, Lao PeopleÆs Democratic Republic. Construction a

    Jan 1, 2009

  • AUSIMM
    Microbial Versus Chemical Leaching of Chalcopyrite Concentrate ù A Quantitative Mineralogical Investigation

    By B, R E. Browner, H R. Watling

    A number of hydrometallurgical treatment methods are being developed to extract copper from chalcopyrite flotation concentrate including microbial leaching and ferric sulfate leaching. However, chalco

    Jan 1, 2004

  • AUSIMM
    Integration and Optimisation of Blasting and Comminution Processes

    By D La Rosa, A Jankovi, A Dance, W Valery

    This paper presents the methodology for optimising blasting and comminution processes in terms of fragmentation developed by Metso Minerals Process Technology Asia-Pacific and South America (MMPT). Th

    Jan 1, 2007

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • AUSIMM
    Pit Slope Management ù Planning for Your Next Failure in Open Cut Mining

    It is often assumed that geotechnical investigations or studies for open pit mines are confined to providing a slope design. However in an operating mine, the design is only one component of a mine ge

    Jan 1, 2003

  • AUSIMM
    Design of Hydraulic Backfill Distribution Systems - Lessons From Case Studies

    By D Gericke, R Cooke

    This paper presents an assessment of the status in design and operation of deep level backfill distribution systems by referring to case studies and practical experience. The improvements in design an

    Jan 1, 1998

  • AUSIMM
    Metallurgical Testwork to Define the Design Criteria for the Electrowinning System for KCGM Fimiston Stage III Gold Room Including Initial Commissioning and Operational Experience

    By Mason P, Waller C

    The Phase I electrowinning system at KCGM's Fimiston Operation utilised the well proven technology of electrowinning precious metal values onto steel wool followed by calcining and direct smelt

    Jan 1, 1996