Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Critical state soil mechanics in filtered TSF design

    By J Rola

    This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro

    Jul 1, 2021

  • AUSIMM
    Fast and Efficient Procedures for Stability Analysis Using Generalised Limit Equilibrium Method

    By Arit I, Adisoma G

    General Limit Equilibrium Method (GLE) and Janbu's Generalised Procedure of Slices (GPS) are two limit equilibrium methods in slope stability analysis which satisfy all equilibrium conditions.

    Jan 1, 1998

  • AUSIMM
    Heap Leach Development of the Mt. Leyshon Gold, Silver Deposit

    The Mt Leyshon Volcanic Complex lies 24 kilometres south-west of Charters Towers and is part of a major continental volcano-plutonic province of Permo-Carboniferous age in north-east Queensland.The vo

    Jan 1, 1986

  • AUSIMM
    Automation in Underground Drilling, Loading and Transportation

    By Ulvelin K, Antila K

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    The Application of Heavy-Media Separation and Static Dry Cleaning of Coal at the Broken Hill Pty. Co. Ltd. Steelworks, Newcastle

    By Martin C. H, Met B

    INDEX OF CONTENTS:1. Introduction, Explanatory; and Reasons for Coal Cleaning.2. Principles on which Coal Cleaning is based.3. Location of Broken Hill Proprietary Co. Ltd. Plant.4. Description of Proc

    Jan 1, 1946

  • AUSIMM
    Importance of Early Rehabilitation Planning - Case Studies from North West Queensland

    By M J. Gillespie, P D. Erskine

    Mine site rehabilitation generally includes the re-shaping of overburden to create a final landform, manipulation of substrates and subsequent revegetation. Due to the wide range of environmental vari

    Jul 10, 2012

  • AUSIMM
    Utilisation of Blast Furnace Slag and Steelmaking Slag in the Federal Republic of Germany

    Iron and steelmaking slags have been utilised for a century. All dumps are now exhausted. Because of constraints in establishing new stock yards, all slags have to be utilised immediately. At prese

    Jan 1, 1979

  • AUSIMM
    The Mining Geology and Grade Control Practices of the Batman Deposit, Mt Todd Project

    Mt Todd lies towards the south end of the Pine Creek Geosyncline, sandwiched between the Cullen Batholith and the Edith Falls Basin, in an area of regionally metamorphosed sandstones, siltstones and

    Jan 1, 1994

  • AUSIMM
    Refined Zinc Metal Production at the Minesite

    Production of refined zinc (99.95 per cent) at the minesite without increasing greenhouse gas emissions is considered. As an example, exploitation of the full reserve of the McArthur River orebody is

    Jan 1, 1998

  • AUSIMM
    Panel Caving Scheduling Under Precedence Constraints Considering Mining System

    By E Rubio, N Morales

    Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with

    Sep 26, 2011

  • AUSIMM
    Pre-Drainage of Methane in West German Coal Mining

    At the beginning of the seventies pre- drainage of methane was introduced in West German coal mining in order to reduce the gas emission from the worked seam. After three pilot tests on the "Rheinl

    Jan 1, 1982

  • AUSIMM
    Resource and Reserve Calculations - The Experience at BHP-Utah Coal Limited

    The process of evaluating orebodies at the feasibility study stage is extremely important. In recent times many groups have indicated that they would like ore reserve estimation to be numeric and o

    Jan 1, 1990

  • AUSIMM
    A Simulation of the Kalgoorlie Nickel Smelter Flowsheet Using METSIM

    By Gray N. B, Grimsey E. J

    A steady state heat and mass balance simulation of the Western Mining Kalgoorlie Nickel Smelter (KNS) flowsheet was developed within the framework of the commercial software METSIM. The KNS simulati

    Jan 1, 1991

  • AUSIMM
    The Leaching of Synthetic Chalcocite and Covellite in Oxygenated Acidic Sulphate-Chloride Solutions

    By Lawson F

    Narrowly sized samples of synthetic chalcocite (Cu2S) and covellite (CuS) were leached in oxygenated acidic sulphate-chloride solutions. Chalcocite leaches via a two-stage process, the first stage

    Jan 1, 1989

  • AUSIMM
    Bankshooting Techniques at Moura Open Cut Coal Mine, Queensland

    By Hoppe AJ

    Drilling and shooting techniques at Moura open-cut have evolved over a period of 16 years and are the result of hard earned experience combined with established practices and consul- tation with pro

    Jan 1, 1978

  • AUSIMM
    Roof Depressurization for Total Extraction Mining Trials Collie Basin, Western Australia

    By Hebblewhite B, Humphreys D

    An experimental mining project has been carried out in the Collie Basin to demonstrate the safe operation of total extraction mining techniques in the underground mines of the basin. To achieve this

    Jan 1, 1988

  • AUSIMM
    Developing Raise Boring Technique in China

    By Weimin F

    In the last decade, great strides have been made in the raise boring technique in China. Extensively, the drilling and blasting method has been replaced by the mechanized raising method since 1980

    Jan 1, 1987

  • AUSIMM
    Modified Open Cut Equipment in Underground Mining at King Island Scheelite

    By McLaughlin R. G, Brammer R. A J

    King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die

    Jan 1, 1977

  • AUSIMM
    Modelling and Analysis of Dimensionless Variables in Air-Sparged Hydrocyclone (ASH) Flotation for Fine Coal Cleaning

    By Miller JD, Ye Y

    The Air-Sparged Hydrocyclone (ASH) has been developed for the fast and efficient flotation of fine mineral particles in a centrifugal field during the past decade at the University of Utah. Over the

    Jan 1, 1993

  • AUSIMM
    Longwall Coal Cutting Machines the Future

    By Carthew J

    For more than 30 years shearer loaders have been the most important winning machines for,longwall mining. While the machines of the first generation had a driving power of only 100 or so kW, the p

    Jan 1, 1988