Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Toe angle measurement for SAG mill control at Lihir gold mineBy M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz
SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel
Aug 29, 2018
-
Processing Operations at Sino Guizhou Jinfeng Mining Limited's Jin Feng PlantBy Y Yang, J Skrypniuk
The Jinfeng mine is Sino Gold's flagship project and is the second largest gold mine in China. Sino Gold Limited (SGL) holds 82 per cent equity in the Sino-Foreign joint venture Sino Guizhou Jinf
Jan 1, 2009
-
Paving the Future - A Case Study Replacing Truck-and-Shovels by Shovel-and-Conveyor Continuous Mining at Carajas Open Pit MinesBy C T. Senra, A Souza
Increasing fuel prices, unavailabilty and high prices of tyres have imposed tremendous challenges for large open pit operations. Carajßs open pit mines, one of the largest iron ore projects in the wor
Jan 1, 2009
-
Measurement of Blast-induced Pressure in Bench Blasting and Deciphering Explosive Performance through Rock Mass Response Analysis – A MethodologyBy A K. Raina, V M. S R Murthy
Rock mass response in blasting is an important element to determine the performance of a blast along with its other outcomes. The near-field monitoring for rock mass response analysis is vital for det
Aug 24, 2015
-
Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste FormBy D J. A Van Zyl, J C. Cunning
Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the
Jan 1, 1998
-
Is your risk management system providing you an accurate view of risks?By S Garnes, W Austerberry, S Fraser
Despite significant investment in safety in the mining industry (mostly focused on processes and systems), many companies are unable to sustain and further improve their performance resulting in conti
May 5, 2022
-
Mining of the OK Orebody - Central Norseman Gold CorporationThe OK orebody comprises a steep dipping narrow quartz reef averaging 0.4 m in width hosted in basalt and gabbro with porphyry bars cross-cutting through it. The following paper tracks the mining of t
Jan 1, 1998
-
The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel CaveBy A Coelho, D Bruce, H Grosser, C Parken, M Xia
Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank
Mar 15, 2021
-
High-Density Sludge Process for Treating Metal Bearing Acid and Metalliferous Drainage WastewatersBy A Dal-Corobbo
Traditional acid and metalliferous drainage (AMD) wastewater treatment focuses on the iron co-precipitation/adsorption process as this is a very effective method of reducing heavy metals, including co
Nov 26, 2013
-
Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri MineBy M Brady, O Salisbury, C Claassen, B Beamish, H Baxter
Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action resp
Aug 31, 2015
-
The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs ViewpointBy J-P Franzidis, M Esvelt, E V. Manla
The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart
Jan 1, 2003
-
Iran Mining Industry Based on the 20-Year Perspective 2025By F Rashidinejad
Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many
Nov 22, 2011
-
Cost Effective Concentrator DesignBy G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
Past Achievements and Future Challenges in the Underground Coal SectorBy B Robertson
Over the 40 years that the author has been engaged in the Australian underground coal mining industry, there has been a continuous improvement in safety performance as the sector has grown in size and
Jul 1, 2013
-
Risk Associated with Rock Type Prediction using Simulation TechniquesBy L W. Palmer
"Evaluating the geological risk associated with ore deposits is becoming common practice in the mining industry. While geostatistical simulation is a useful tool for evaluating this risk, the effect o
Aug 18, 2014
-
Mining through Sandfill Using Spiling BarsBy D Carroll
Mining of the zinc, lead and silver deposit at the Broken Hill Southern Operations site has been occurring for over 100 years. As a result of this, a significant amount of high-grade ore is now taken
Nov 5, 2014
-
Team Alignment Towards Alternative Project Delivery MethodsProject delivery in our current market is not as efficient as it could be. Industry at large (both client and consultant), is diligently following the engineer, procure, construct, manage (EPCM) or en
Jan 1, 2009
-
Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case StudyBy R Carreau
The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately
Jan 1, 2003
-
The Energy Outlook in the Pacific Basin Region (0d1a04ad-4b32-49e8-99a0-89cb5b1072bb)The outlook for suppliers of energy to the expanding economies of the Pacific Basin region is essentially positive, but particularly for exporters of high quality steam coal. This paper argues that ec
Jan 1, 1990
-
Investing in new process improvement technology: reducing the risk of implementation – a way forwardBy S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig
Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change
Aug 29, 2018