Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Gold, Conveyor Belts, and Efficiency A Guide to Cleaning Belts and Improving Transfer Points on Gold Mining and Processing ConveyorsInefficient conveyors suffer carryback, leading to the build-up of materials on idlers, and other expensive components. They spill and leak material at loading zones and transfer points, causing acc
Jan 1, 1991
-
Sustainable Development and the Minerals Sector ù Leaving a Lasting LegacyBy L Chaffey, M Buckland
The minerals industry has enormous potential to positively contribute to sustainable development and many leading companies have concluded that their long-term success is directly linked to their abil
Jan 1, 2006
-
Introducing deep learning and interpreting the patterns – a mineral deposit perspectiveBy I Sucholutsky, D M. First, D Mogilny, F Yusufali
Machine learning is creating value in all facets of the mining industry, from exploration to production. The authors provide an accessible, high-level introduction to artificial intelligence (AI), mac
May 24, 2023
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground OperationsBy C E. Gawith
The Waihi underground mining operation currently mines epithermal veins ranging from two metres up to ten metres in width using a ‘Modified Avoca’ stoping method. This method consists of longhole benc
Mar 15, 2021
-
Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in AustraliaBy W Ludlow, C Harrington
This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed
Jul 23, 2018
-
MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed GradesBy R Wynn, T J. Akroyd, C Costa
In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed
Sep 1, 2014
-
Broker's Rules of Thumb for Mineral Valuation: A Focus on Gold EquitiesBy Dodd SF
Valuation of mining companies and their underlying assets prepared by brokers' analysts are, by necessity, approximations. The reliability of the valuations is entirely proportional to the qua
Jan 1, 1994
-
Cooling Pathways for Deep Australian Longwall Coal Mines of the FutureBy B Belle, M Biffi
Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu
Jul 1, 2013
-
Whole-of-System Analysis Using CFD to Reduce Emissions of Fugitives Gases Inside a Copper Smelter BuildingBy E Nik, A Manzoori, H Namavari, P Witt
The smelter building at Sarcheshmeh Copper Complex, Iran, houses two reverberatory furnaces and five Pierce-Smith converters. Under normal operating conditions SO2 emissions fill the building, posing
Jan 1, 2004
-
Development of the Maui Gas FieldThe offshore Maui gas/condensate field was discovered by Shell BP and Todd on Services Limited in 1969. Subsequent appraisal drilling and negotiatio
Jan 1, 1994
-
Transition from owner mining to contract mining – a structured tender process using a holistic approachBy Y G. Anoman
This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e
Jun 22, 2022
-
Calculating Similarity Among Geological Simulated Images and Reference Images Using Principal Component AnalysisBy E Cunha, D Roldao, TáTamantini, J F. C L Costa, T Webber, C Monteiro
The main problem of geostatistical simulations is to reproduce the real characteristics of the mineral deposit when there are few conditioning data. In this case, the geological interpretation, based
Sep 26, 2011
-
Viscosity and Composition Relationships in Kalgoorlie Nickel Smelter SlagsBy Segnit ER, Boow J
The start up operations of Western Mining Corporation's Kalgoorlie nickel smelter encountered troubles due to the high magnesia content of the concentrates. The flash smelter slags, with highe
Jan 1, 1980
-
A More Holistic View of Mill Liner ManagementBy N Weerasekara, M Bird, M Yahyaei, M M. Hilden, M S. Powell, J Franke, P Toor
The combination of new tools with a more rigorous approach to understanding the interaction of mill liners with overall mill performance and economics, forms the basis of an integrated approach to lin
Oct 29, 2012
-
Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining LandformBy G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu
An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which
Jul 10, 2012
-
The Effects of Increased Salinity on Microbially Mediated Ecosystem Processes in Ephemeral StreamsBy J L. Kerr, J Beyer-Robson, S Vink
Driven by an increasing need for water conservation, coal mine operators in the upper Isaac River catchment have placed significant emphasis upon the reuse of water. This initiative led to an overall
Nov 26, 2013
-
Geology, Mineralisation and Potential of the Clogau St DavidÆs Mine, Dolgellau Gold-Belt, Gwynedd, WalesBy I M. Platten, S C. Dominy
The Clogau St DavidÆs gold mine has a recorded production of around 81 000 oz Au and it is the largest mine in the Dolgellau gold-belt and BritainÆs most prolific historical producer. The original min
Mar 26, 2012
-
Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam depositBy D Clarke, I Minniakhmetov
The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho
May 24, 2023
-
Application of an Integrated Liberation Leach Model for Process OptimisationBy T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen
"The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model
Oct 10, 2016