Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Raising Sangdong – A Staged Approach to the Redevelopment of an Old OperationBy C Lutherborrow
The Sangdong Tungsten/Molybdenum Deposit is located in the Republic of Korea and was discovered in 1916. At this time Korea was a colony of Japan. It was mined for two years after discovery closing in
Aug 22, 2011
-
The Strategic Dilemma for Mineral Engineering Service Providers to the Resources Industry in the Present High Demand EnvironmentBy A J. Broome
Since 2003, there has been an unprecedented growth in the demand for engineering, technical and project services in the mineral industries. This demand for services became evident in Australia earlier
Jan 1, 2007
-
No Net Loss and Offsite Mitigation: Is New Zealand Mature Enough for a Win-Win Situation?By S Christensen
In August 2001 the Minister for Conservation declined an application by GRD Macraes for an access arrangement to enable work at the Globe Progress Mine near Reefton. In her decision, Ms Lee said:æI ha
Jan 1, 2002
-
Independent Decline Haulage at Kanowna Belle Gold MinesIn May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w
Jan 1, 2002
-
Head-Gear and Electric Winding Plant at the Main Shaft, Mount Morgan, QueenslandNEARLY all problems in mining engineering involve the transport and distribution of materials from place to place, and in general the most economically managed mines and plants are those in which the
Jan 1, 1911
-
Fine-Tuning Raise Bore Stability Assessments and RiskBy W A. Peck
Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug
Mar 21, 2011
-
Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk QuantificationBy M W. N Buxton, M T. Bootsma, J Benndorf, C Alford
Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti
Nov 24, 2014
-
Examining the relationship (if any) between elevated phosphorus and ore textural type in Pilbara iron oresBy M I. Pownceby, N Karimian, J R. Manuel, M J. Peterson
The CSIRO ore classification scheme for Pilbara ores was used as a reference frame to target recognisable ore types/textures with potentially elevated phosphorus content for detailed analysis. Particl
Sep 18, 2023
-
Study on New Tungsten Beneficiation Technological Flow Sheet of Shizhuyuan Polymetallic MineStudy on New Tungsten Beneficiation Technological Flow Sheet of Shizhuyuan Polymetallic Mine
Sep 13, 2010
-
The Mesozoic Iron Oxide-copper-gold (IOCG) Mineralisation in the Central Andes – A Refined IOCG Ore-forming Model in the Palaeozoic Continental MarginBy H Chen
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mesozoic iron oxide-copper-gold (IOCG) mineralisation in southern Perú and the northern
Mar 18, 2015
-
Open Pit Mine Slope Engineering: A 2002 PerspectiveIn most surface mining operations, overall project economics is driven to a significant extent by the slope angles that can be achieved within the rock masses present. This is particularly true of pre
Jan 1, 2002
-
Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame ThemBy J Paradis, K Dudgeon, M Topping
At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon
Aug 18, 2014
-
The Handling of Materials at the Risdon Works of the Electrolytic Zinc Co. of Australasia Ltd.THIS paper deals with the handling of the various materials used in the 100-ton zinc plant at Risdon, and, in view of the magnitude of the works, the configuration of the ground covered by these works
Jan 1, 1923
-
The Use of Gravity as an Exploration Tool for the Robertson Range and Davidson Creek Iron Ore Deposits, East PilbaraBy R McCarthy, P Darvall
FerrAus Limited's Robertson Range and Davidson Creek iron ore projects are located on the far eastern margin of the Hamersley Province, approximately 100 km to the east of Newman, Western Austral
Jan 1, 2009
-
Regional Stream Sediment Geochemistry Database (REGCHEM) for Selected Regions of New ZealandBy A B. Christie
Stream sediment geochemical analyses from 140 mining company exploration surveys of the Coromandel, Northwest Nelson, Marlborough and Westland regions of New Zealand have been compiled from open file
Jan 1, 1995
-
Development Practice and Ground Support Installation at Northparkes E26 MineThe Northparkes E26 Mine is AustraliaÆs first block cave mine. This paper presents an outline of the design and construction philosophies that drove the project development and details the excavation,
Jan 1, 1999
-
The Use of Reverse Cleaning in Testwork on Currawong Copper-Zinc OreLaboratory testwork was carried out on an overall orebody composite, of 2.9 per cent Cu and 4.2 per cent Zn, prepared from drill core taken from the Currawong fine-grained, copper-zinc massive sulphid
Jan 1, 1999
-
-
The ABC of Mine to Mill and Metal Price CyclesBy J Pease, P Cameron, D Drinkwater
"In the 1990s metal prices were trending in a long-term decline and the usual cost-cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim.
Oct 10, 2016
-
Kalgoorlie Tailings Retreatment Project-'Kaltails'The Kaltails Project is situated close to the city of Kalgoorlie-Boulder in Western Australia. Located on the south-eastern fringe of the Golden Mile, Kaltails has been in operation since June 1989. T
Jan 1, 1992