Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Australian Equity Market as a Source of Capital for Pacific Basin Mineral Development

    One of the major changes in the resource industry in the nineties has been the re- internationalisation of the industry. The history of the resource business has been one of companies from the develop

    Jan 1, 1995

  • AUSIMM
    Bulk Solids Sampling

    By J E. Powalisz

    Obtaining a representative sample of bulk materials in process industries is critical to providing valid data for process control and custody transfer (valuation). The accuracy of a sample, that is to

    Jul 29, 2014

  • AUSIMM
    A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USA

    By R H. Knight

    Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or

    Aug 18, 2014

  • AUSIMM
    Application of Block Caving System in the Tongkuangyu Copper Mine

    By Song Yongxue

    During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a

    Jan 1, 2000

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Australian Gold - Exploration, Discovery and Potential - Keys to a Sustainable Industry

    Gold has been known and mined in Australia for over 150 years. It occurs and is mined in all States and the Northern Territory. In the past 30 years approximately 8300 t of gold has been mined and gol

    Jan 1, 2007

  • AUSIMM
    Comparison of the Generation of Shear Wave with Different Simulation Approaches

    By M Chen, Q D. Gao, Y G. Hu, P Yan, W B. Lu

    The safety and stability of construction structures are often affected by blast-induced waves. Investigating the generation mechanism of shear wave (S-wave) during blasting is important, because it ha

    Aug 24, 2015

  • AUSIMM
    Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro Corona

    By D La Rosa, K Caron, H Mamani, W Valery, R Diaz

    The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these

    Aug 24, 2015

  • AUSIMM
    An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western Australia

    By C F. Stokes

    The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)

    Aug 22, 2011

  • AUSIMM
    Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW Process

    The Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.

    Jan 1, 1993

  • AUSIMM
    Sustainable Plant Design

    By J Kwak

    Driving sustainability concepts and practices into the heart of the design process is the key to achieving a successful, sustainable plant design. Engineering design practices, tools, systems and meth

    Jan 1, 2004

  • AUSIMM
    Grade Control in Underground Gold Vein Operations - The Role of Geological Mapping and Sampling

    By J B. Collier, R M. Fraser, O Dahl, I M. Platten

    Grade control is a process of maximising value and reducing risk, through the delivery of quality tonnes to the mill via the accurate definition of ore and waste. It essentially comprises data collect

    Jan 1, 2009

  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuit

    By E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso

    Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour

    Sep 18, 2023

  • AUSIMM
    Managing Human Rights and Sustainable Development - Effective Corporate-Community Relationships

    This paper identifies the challenges and opportunities for mining companies and communities in investing in human rights compatible, credible, effective and representative company-community relationsh

    Jun 1, 2010

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    Proactive Measures for Fatality Prevention in the Mining Industry ù Why Fatalities Persist While Lost Time Injuries Decline

    The traditional measure of Lost Time Injury Frequency Rate (LTIFR) as a measure of improvement in safety performance is recognised as inadequate and misleading, lulling managers into believing that sa

    Jan 1, 2003

  • AUSIMM
    Using a Coal Mine Safety Regime Approach to the Management of High-Voltage Electrical Isolation

    By J Joy, D Griffiths, A Bye, G V. Kizil

    Poor standards of electrical installation and maintenance continue to contribute to electrical related fatalities and injury risk in the mining industry. Electrical isolation has the potential to init

    Nov 20, 2012

  • AUSIMM
    Development Strategy of the Trident Underground Gold Mine

    Avoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas

    Jan 1, 2008

  • AUSIMM
    Modelling of Near-Source Dust Dispersal From Surface Mine Blasting in Weak Wind and Tropical Conditions

    By S Bhandari

    This paper is a step in the direction of developing a computer model of the near source dispersal of suspended particulate matter (SPM) in planetary boundary layer (PBL). Since Surface Mine blasting i

    Jan 1, 2001