Search Documents

  • CIM
    Operation of a High-Density Tailings Thickener

    By Ernie Doell, Trung Nguyen

    "In early 1995 Cluff Mining commissioned a newly constructed high density tailings thickener at its Cluff Lake uranium mill. The 85 ft diameter high density thickener is one of the first of its kind i

    Jan 1, 1996

  • AIME
    Endowment Funds (7b6c8555-360c-4913-b4a4-ae7f39dbc067)

    The income of the Institute is derived from dues, subscriptions to MINING AND METALLURGY and sale of publications. These sources are fortunately supplemented by the interest from invested funds now am

    Jan 1, 1936

  • SME
    Polysulfides As An Alternative Green Gold Leaching Technology - Preprint 09-103

    By D. Earley

    High metal prices and new world trade standards and accounting for environmental liability in financial disclosures are creating markets for metals commodities that are produced using ?green technolog

    Jan 1, 2009

  • DFI
    Seismic Considerations for Bridge Foundations

    By Lok M. Sharma

    "Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou

    Jan 1, 2017

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • NIOSH
    Pillar Stability Issues Based On A Survey Of Pillar Performance In Underground Limestone Mines

    By Dennis R. Dolinar, John L. Ellenberger, Gabriel S. Esterhuizen, Anthony T. Iannacchione

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as “Good” to “Very

  • IOM3
    Pechenga area, Russia - part 1: geological setting and comparison with Pasvik, Norway

    By V. A. Melezhik, P. K. Skufin, L. P. Nilsson

    these factors into account. Theoretical and

    Aug 1, 1994

  • NIOSH
    RI 9646 - Concluding Evaluation Of A Continuous Haulage Guidance Sensor

    By John J. Sammarco

    The mining industry has the highest average annual fatality rate among major U.S. industries. To address this, the National Institute for Occupational Safety and Health, Pittsburgh Research Laborator

    Jan 11, 1998

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984

  • AUSIMM
    Features of the New Lead Refinery at Port Pirie

    A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the

    Jan 1, 1963

  • NIOSH
    OFR-198-82 In-Mine Measurement Of Reactive Diesel Exhaust Contaminants

    By K. T. Menzies

    This report documents laboratory and in-mine analyses of diesel exhaust pollutants carried out to assess the fate of potentially reactive species in the mine environment. Specifically, the concentrati

    Jan 1, 1980

  • AUSIMM
    Decrepitation of lump iron ores

    By S Hapugoda, M Kilburn, M Adam, L Lu

    Lump ore is one of the key ferrous materials used in the blast furnace ironmaking process, typically accounting for 5–25 per cent of the blast furnace ferrous burden. Like other ferrous materials, the

    Jul 24, 2017

  • AUSIMM
    Geochemistry of Wallrock Alteration at the Golden Cross Deposit, New Zealand

    By J L. Mauk

    Golden Cross is a volcanic-hosted, low-sulfidation, epithermal Au-Ag deposit in the Hauraki Goldfield. Irrespective of the rock type (andesite versus dacite), hydrothermally altered wallrocks are enri

    Jan 1, 2000

  • SAIMM
    A theoretical model for the characterisation of rock mass mechanical properties—Application at the Äspö HRL, Sweden

    By A. Fredriksson, R. Christiansson, I. Staub

    A theoretical model based on DFN models and 2D DEM numerical modelling has been developed for evaluating the rock mass mechanical properties. The description of the methodology is non-site related and

    Jan 1, 2003

  • AUSIMM
    The Carrick Gold Project - An Exploration Case History

    By A J. Eggers

    With gold first discovered at Carrick in 1864, exploration and mining on the Carrick Goldfield in Central Otago, New Zealand, has now been ongoing for more than 130 years. Recorded historical hard roc

    Jan 1, 1997

  • AUSIMM
    Rapid Colorimetric Procedures in Geochemical Prospecting for Molybdenum

    Procedures employing thiocyanate and dithiol complexes of molybdenum have been developed for the determination of the metal in the presence of large quantities of ferric iron. The procedures are devel

    Jan 1, 1965

  • AIME
    Extractive Metallurgy Division - Flocculation of Mineral Suspensions With Coprecipitated Polyelectrolytes

    By Ivan B. Cutler, Milton E. Wadsworth

    Coprecipitation of anionic and cationic polyelectrolytes has been applied to floccula-tion of several mineral systems. Results obtained in a study of the flocculation of kaolinite and hematite suspens

    Jan 1, 1957

  • SME
    Results given of studies concerning methane extraction from coalbeds

    By M. A. Trevits, G. L. Finfinger

    Various methods have been developed through US Bureau of Mines research to remove gas in advance of, during, and subsequent to mining. These include drilling horizontal or cross-measure boreholes from

    Jan 8, 1986

  • AUSIMM
    Mount Angelo Copper Prospect, East Kimberleys, W.A.

    The Mount Angelo prospect outcrops as two copper rich gossans, the larger of which is 250 ft long and 70 ftwide. The mineralization is epigenetic and replaces part of a brecciated and disturbed lime t

    Jan 1, 1966

  • CIM
    Mine Waste Management Planning for an Arctic Environment

    By William J. Purdy

    Successful design, operation and completion of a surface waste management facility for a diamond mine located in Canada?s northern environment requires careful planning to minimize short and long term

    May 1, 2004