Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mixed Potential Oscillations In The Dissolution Of Galena In Ferric Sulfate SolutionBy Li Zhou
The kinetics of the dissolution of galena was studied by monitoring the mixed potential of a galena electrode in ferric sulfate solutions. The results show that the mixed potential of the galena elect
Jan 1, 2008
-
Solutions To Reduce Blast-Induced Ore Loss & Dilution At Ahafo Gold Mine In GhanaBy W. Rogers
Blast-induced rock mass displacement can have a significant impact on ore loss & dilution. The mischaracterisation of the grade boundaries both prior to, as well as a result of blasting can lead to si
Jan 1, 2012
-
Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift MethodBy Paul H. Madsen, Victor S. Romero
The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo
Jan 1, 2001
-
Recovery And Utilization Of Bottom Ash Magnetics For Coal Cleaning Medium - Preprint 09-002By R. Q. Honaker
Dense medium processes are used to clean over 50% of the coal that is fed into preparation plant facilities worldwide. The dense medium is formed using ultrafine magnetite which is recovered after the
Jan 1, 2009
-
Do Refuge Chambers Represent a Good Strategy to Manage Emergencies in Underground Coal Mines? Mining, Metallurgy and ExplorationBy A. E. Halim, J. F. Brune
The 2006 Sago, Darby, and Aracoma mine disasters in the United States (US) forced the US government to implement the 2006 MINER Act and additional regulations that require all US underground coal mine
-
Methods To Improve Mine Ventilation System Efficiency - Introduction - Preprint 09-070By C. Pritchard
John Marks said in his acceptance of the Hartman Award in 2008 ? ?I guess that without the occasional complaint, your mine is probably over-ventilated? (Marks, 2008). Miners are seldom in this situati
Jan 1, 2009
-
Mining ?nance Challenges;Second Annual Conference Explores the IssuesObtaining financing for mining and exploration projects has been difficult for the last several years, particularly for junior companies. Today, though, the purse strings of investors appear to be loo
-
Concreting the Queens Tunnel, New York City Water Tunnel No.3By Edward M. Dowey
The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring
Jan 1, 2001
-
GeomechanicsBy Z. T. Bieniawski
Geomechanics signifies the science and engineering of soil and rock materials and of rock masses. It is a field of professional practice and research that draws heavily on the elements of soil and roc
Jan 1, 2008
-
Impact Of Consolidation On The Shear Strength Of Coal Refuse Impoundments – Preprint 97-110By R. J. Sweigard, C. T. Justice, T. Beckham, E. D. Thompson, T. C. Hopkins
Fine coal refuse is often pumped, as slurry, into surface impoundments as a means of permanent disposal. As the available volume is filled, the height of the embankments are frequently increased. Many
Feb 24, 1997
-
CFD Modeling Of Air Flow In An Open Pit MineBy W. Collingwood
As open pit mines continue to grow deeper and productivity continues to increase, the management of respirable dust and noxious gases can become a challenge. The natural wind flow in open pit mines i
Jan 1, 2011
-
Decision Tools For Integrating Sustainability Into Planning And Feasibility Phases Of Projects For Extractive Sector Enterprises ? IntroductionBy A. Ramage
Since late 2010, CH2M HILL has been working with a confidential client who holds a long-term commitment to sustainable development (SD). The commitment is aligned with all three elements of the triple
Jan 1, 2012
-
Probabilistic modeling of the Round Mountain gold deposit: A case studyBy Rodolfo Lagos, Nicos Pfeiffer, Ben Harding, Clayton V. Deutsch
This paper outlines a cutting-edge probabilistic resource modeling workflow tailored to the Round Mountain epithermal gold deposit. The primary goal is to craft a robust and modern simulation process
Dec 1, 2023
-
TBM Excavability: Prediction and Machine–Rock InteractionBy Z. T. Bieniawski, José Miguel Galera, Benjamín Celada
TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj
Jan 1, 2007
-
Evaluation Of Sulfidic Mine Tailings Solidified/Stabilized With Cement Kiln Dust And Fly Ash To Control Acid Mine DrainageBy M. Nehdi
Deficient surface disposal systems of sulfidic mine waste often cause severe contamination of surface streams and groundwater reservoirs due to the oxidation of sulfide phases. The subsequent generati
Jan 1, 2008
-
Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit DefinitionBy R. Benito
This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace
Jan 1, 2008
-
Gold Mineralization In The Coffee Creek Area; White Gold District (Dawson Range), West-Central Yukon ? IntroductionBy A. J. Wainwright
The Coffee Creek lode gold discoveries are located in the White Gold district (Dawson Range), west-central Yukon, 130 km south of Dawson City and 30 km south of the Golden Saddle gold deposit (Figure
Jan 1, 2012
-
Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 TunnelBy S. H. Jason Choi
The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne
-
Site Investigations And Geotechnical Assessment For The Construction Of The Deep Underground Science And Engineering Laboratory At The Former Homestake MineBy Z. J. Hladysz
A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the National Science Founda
Jan 1, 2011
-
The Gabon -Congo Salt DepositsBy P. A. C. De Ruiter
The Lower Cretaceous salt deposits of the Gabon Basin and Congo Basin were said down on ton of an Burly Cretaceous Lato Jurassic, continental graben fill that represent!) the rifting phase of the Afr
Jan 1, 1978