Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Determination Of The Optimum Lifetime Of A Mining Project Using Discounted Cash Flow And Option Pricing Techniques (PREPRINT NUMBER 92-28)By B. W. Cavender
The operating lifetime, or production rate, selected for a mining project is among the most important factors influencing the design and ultimate economic success of the project. An incorrectly-determ
Jan 1, 1992
-
Risk Mitigation for Open Pit Mining in Areas With Underlying Old Underground WorkingsBy J. Duran
Mining at Phoenix is currently done by surface operation in the Fortitude and Bonanza Pits, at a combined rate of approximately 110,000 tons per day. A portion of the ore bodies targeted by these pit
Feb 23, 2014
-
Managing Pit Wall Stability Within Soils And Rocks For Steeply Dipping Vein Deposits At GetchellBy M. C. Baumann
The Getchell Mine is located in Humboldt County, Nevada, approximately 70 km northeast of Winnemucca. Slope management has been a critical factor in the feasibility of mining operations since they beg
Jan 1, 1993
-
Evaluation Of Limestone Mining And Marketing Opportunities For Urban Quarries (af81e90e-6f0e-4f4c-98a4-28e746dd2771)By Marline J. Veesaert
Urban quarries offer one of the greatest opportunities for profit in non-metallic mining with limited financial risk IF properly evaluated, planned and developed to meet market needs. Location, with
Jan 1, 1977
-
Evaluation of detection and response times of fire sensors using an atmospheric monitoring system - SME Transactions 2016By J. H. Rowland, R. A. Thomas, III, C. D. Litton
Atmospheric monitoring systems (AMS) are required when using air from conveyor belt entries to ventilate working sections in U.S. underground coal mines. AMS technology has the potential to increase f
Jan 1, 2016
-
Utilization Of Wet FGD Material For AMD Abatement In Underground Coal MinesBy J. C. Ashby
Electric utility response to certain amendments of the Clean Air Act has resulted in a production of several types of alkaline coal combustion byproducts. Alkaline combustion byproducts are gaining in
Jan 1, 1998
-
Rare Earth Element Concentrations in Product Streams of Coal Preparation Plants in the Eastern United StatesBy A. Bhagavatula, M. Rezaee, M. J. Kiser, R. Q. Honaker
"A field study of the coal preparation plant fleet in the eastern United States was undertaken to determine if quantify of rare earth elements (REEs) present in the product streams are large enough to
Jan 1, 2016
-
Pneumatic Coal Recovery Systems (62007161-e993-4f84-96bb-537ec84611fb)By R. M. Cox
Pneumatic coal loading and conveying systems provide alternative methods for the safe and efficient mining of the thin high-grade coal seams found in the Southern Appalachians. Pneumatic systems elimi
Jan 1, 1999
-
The Relationship Of Direct Reduction To The Iron-Ore And Coal IndustryBy L. G. Hendrickson
Direct-reduction processes for converting iron ores to metallic iron in the solid state have been available for some time; and whenever scrap becomes expensive, there is a new wave of interest in thes
Jan 1, 1978
-
Capture Of CO2 From Coal Gasification Gases On A Calcium Oxide Based SorbentBy A. G. Belova
With the federal climate change legislation in progress, there is a need for demonstration-stage technologies aimed at providing clean energy from coal. Our research aims to experimentally illustrate
Jan 1, 2010
-
Chromite Plant Capacity Increase Using Experimental and Modeling TechniquesBy A. Acar, E. T. Tuzcu, Y. O. Vural
"In order to sustain the operations in chromite processing plants, due to concentrate selling cost, plants are in need of optimization in terms of capacity and recovery increase. In this study, DAMA E
Jan 1, 2017
-
Application Of Cratering Characteristics To Conventional Blast DesignBy Bruce B. Redpath
Single-charge cratering tests can provide a direct measure of the powder factor necessary for achieving a desired effect in conventional blasting. If a desired blast effect, such as fragmentation or m
Jan 1, 1977
-
Control Of Conveyor Peak Loads By Variable Feeder Discharge RatesBy J. C. Yingling, G. T. Lineberry
A control system for reducing peak loads on mine conveyor networks is proposed. The system involves continuous monitoring of flows into the conveyor network and section feeders with variable discharge
Jan 1, 1993
-
Long-term mine planning of the Malanjkhand copper deposit - SME Transactions 2011By D. Chakravarty, G. Samanta, B. Samanta
The present study highlights the planning and design aspects of a well-known openpit copper deposit in India. The mine has been operational since 1982 and presently reaches a depth of 168 m below the
Jan 1, 2011
-
Pressure Sulfuric Acid Leaching of Manganese-Rich Slagwith Pyrite as Additive Mining, Metallurgy and ExplorationBy Shanming He, Jinliang Wang, Xiaoming Wang, Chunfa Liao
Large amounts of manganese-rich slag were generated from smelting low-grade manganese ore containing high iron and high phosphorus in electric furnace or blast furnace, which contain 25–40 mass% Mn. T
-
Prevention Of Silver Jarosite Formation Through The Addition Of Iodine SpeciesBy G. Van Weert
Refractory ores and concentrates containing silver tend to form Ag-jarosite during autoclave oxidation. Silver extraction from the oxidation products is therefore low, unless a hot lime treatment step
Jan 1, 1993
-
Operational Constraints: Surface Mining In The Central Coal ProvinceBy Frank Cook
As in other areas of the country, surface coal mine productivity in the Central Coal Province--primarily Illinois, Indiana, and west Kentucky--has declined steadily since 1969 (figure 1). Productivity
Jan 1, 1977
-
The U.S. Interior Department's Abandoned Mine Lands ProgramBy Patrick Shea
Old mine workings are found throughout the Western United Sates on lands administered by the U.S. Bureau of Land Management, U.S. Forest Service and private lands. Some of these mine workings date bac
Jan 1, 2000
-
Improvement of Precast Concrete Segmental Lining by Post-Tensioned StrandsBy Behzad Khorshidi
"The ultimate objectives of the post-tensioned strands are to connect the precast segments into a ring and provide pre-stress in the tunnel circumference. The method involves inserting the strand thro
Jan 1, 2016
-
Geochemical Model To Predict Aquifer Restoration Following Low Ph In-situ Uranium Recovry - SME Annual Meeting 2022By K. Johnson, B. Schiffer
Demonstrating aquifer restoration is an essential component of regulatory approval needed to mine uranium, copper, and other minerals by in-situ recovery (ISR). A PHREEQC geochemical model provided a
Mar 2, 2022