Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Innovation in the Tunnel Boring Machine IndustryBy Martin Herenknecht, Michael Knabe, Ulrich Rehm
In Switzerland at present, the longest railway tunnels in the world, the Gotthard(57 km) and the Loetschberg base tunnel (34km) are under construction. For thischallenge six high-tech HERRENKNECHT Har
Jan 1, 2003
-
Declustering Weights as a Measure of Average Sample Spacing, Applications in Mineral Resource ClassificationBy D. Hulse
Mineral resource classification is described in both the SME and CIM Standards for Mineral Resource Reporting. The CIM Standard states “… sampling … is sufficient to assume geological and grade or qua
Jan 1, 2019
-
Performance Evaluation Of Modified Biopolymers As Acid Suppressants In Copper Electrowinning - SME Annual Meeting 2023By M. Ribeiro, P. So, P. Wong
Electrowinning is a process by which metals, such as copper or nickel, are recovered from aqueous electrolyte solutions resulting from the extraction of the metal ion from an acidic or basic leach sol
Feb 1, 2023
-
Measurement of Grout Injection Pressure in SituBy Elisabeth Tønnesen, Lloyd Tunbridge
"SUMMARY Injection grouting in rock around tunnels is used to reduce or stop water inflow. Little is known about the distribution of pressure within the rock mass during and after grouting. Instrument
Jan 1, 2016
-
Planning Belt Conveyer Networks Using Computer Simulation - IntroductionBy C. B. Manula
The application of computers to materials handling problems has recently been investigated by various mining groups. This approach has been found, especially useful where a large amount of alternative
Jan 1, 1967
-
Comprehensive and Integrated Subsidence Prediction Model - CISPM (V2.0)By S. S. Peng
This paper presents a computer program package for predicting surface movement and deformation caused by under-ground coal extractions. It is capable of: predicting final surface movement and defor
Jan 1, 1986
-
Influence Of Pebble Mill Operating Conditions On Measurements With An In-Mill SensorBy J. Alatalo
Autogenous grinding is a process of reducing the particle size distribution of an extracted ore by using the ore itself as the grinding media. It is a process that is difficult to control and there is
Jan 1, 2011
-
Long Distance Tunnelling: Challenges and Trends - NAT2022By Karin Bäppler
Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct
Dec 1, 2022
-
Critical Minerals Management on the Federal Seabed - SME Annual Meeting 2026By Paul O. Knorr
The Bureau of Ocean Energy Management (BOEM), a bureau within the U.S. Department of the Interior, has responsibility over both energy and non-energy mineral development on the United States Outer Con
Feb 22, 2026
-
Extraction of manganese oxide ore by a reduction acidolysis-selective leaching method - Mining, Metallurgy & Exploration (2018)By X. Cai, L. Jiang, G. Fu
A process for recovering manganese from low-grade manganese oxide ore through a reduction acidolysis-selective leaching method is investigated. Two types of biomass, sawdust and straw, were used as re
-
Using Mine Planning And Other Techniques To Improve Ventilation In Large-Opening Mines (34fc5d29-adbd-4951-ab4a-78435b4a5afe)By R. H. Grau
The National Institute for Occupational Safety and Health (NIOSH) has conducted research to improve the ventilation of large-opening mines. The research has demonstrated that the ventilation of large
Jan 1, 2008
-
Pre-Concentration by Automatic SortingBy E. G. dos Santos, M. M. Veras, C. H. Sampaio, A. S. Young, R. S. Paranhos, C. O. Petter, A. C. Bastos
"The major challenges of the current mining are the energetic optimization, the lowest water consumption and minimizing environmental impact. One technique that eliminates much of the waste avoiding m
Jan 1, 2017
-
Boring Through a Rock-Soil Interface in SingaporeBy Nicola Della Valle
The Singapore Land Transport Authority (LTA) is currently expanding capacity by extending their Metro system from South of the city to the North East end of the island. The scope of Contract 704 in
Jan 1, 2001
-
An Analysis Of The Wash Thickener - Two Stage Filtration CircuitBy R. S. Olson
The operation of a series wash thickener-two stage filtration circuit determines the soluble loss in many hydrometallurgical operations A study of this circuit yielded expressions which permit calcula
Jan 1, 1962
-
The Cycloidal Heavy Medium Cleaner ? IntroductionBy R. C. Woodhead
During past years the most difficult problem presented to the coal preparation engineer has been the cleaning of fine coal, The problem of handling fine coals is more involved than the coarser sizes,
Jan 1, 1964
-
Effect Of In-Situ Stresses On The Stability Of Mine Roof BoltsBy Rodolfo V. de la Cruz
The stresses in the materials surrounding an underground opening are dependent upon the virgin stress field, the geometry of the opening and changes in boundary conditions as mining progresses. For mo
Jan 1, 1978
-
An Improved Sintering Process To Overcome Environmental Problems In The Sinter Plants - Introduction To SinteringBy Thomas E. Ban
The continuous sintering process was invented more than 60 years ago by two metallurgists, Arthur S. Dwight and Richard L. Lloyd, who saw a need for automation in mineral processing. Their specific ob
Jan 1, 1975
-
The Long Term Outlook For Frasch Sulphur in International TradeBy Paul S. Murphy, Eric W. Oehrke
INTRODUCTION The global market for sulphur has experienced dramatic structural shifts during the past 10-15 years. After a number of years of dominance as sulphur suppliers, the world's Frasc
Jan 1, 1986
-
Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022By Gunjan R. Bhattarai, Kumar Bhattarai
Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr
Dec 1, 2022
-
Starter Tunnel and TBM Mining on Construction Package No. 3A MetroWest Water Supply Tunnel Project (MWWST)By Jeff Salai
The CP-3A contract is the final segment of the MWWST’s 28.3 km (17.6 mile)pressurized water supply tunnel for the metropolitan Boston area. The 1,288 m (4,226 feet) of U-shaped tunnel alignment pa
Jan 1, 2001