Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improvements in Plant Scale Nitric-Sulfuric Acid Pressure Leaching of Refractory Sulfide concentratesBy Corby G. Anderson
Since 1985, the Sunshine Mining Company has used a patented nitric-sulfuric acid pressure leaching system for production of silver and copper from a refractory sulfide ore body. To better understand t
Jan 1, 1991
-
AUV and ROV magnetometer surveys, compensationBy Peter Kowalczyk
Magnetic surveying and map production is well established in land based mineral exploration. Magnetic data are routinely used to map geology in covered terrains, to estimate the depth to basement in o
Sep 1, 2014
-
The Bond Legacy - SME Annual Meeting 2024By R. E. McIvor, Brian Cornish, J. A. Finch, Yue Tan, Claude Gagnon
Fred C. Bond is recognized throughout the mineral processing world as the father of comminution equipment applied science and engineering. The Bond Work Index became a universal standard, and is the m
Feb 1, 2024
-
Carbon Neutral, Energy Efficient Method For Gas Production From Methane HydratesBy T. Yegulalp, M. Castaldi
As global energy demands increase, there will be a critical need to employ fuels that have minimal environmental impacts. While hydrogen is considered the ultimate fuel for that purpose, hydrocarbon
Jan 1, 2007
-
The Application Of Underground Mining Practices To Tunneling In Gassy ConditionsBy Roger L. King
Working in gassy ground conditions is an everyday occurrence for the U.S. coal mining industry. As tunneling operators begin to venture into projects that expose them to the additional hazard of poten
Jan 1, 1985
-
Heap Leaching and Dump Leaching at the Mesquite MineBy Tim Q. Haldane
The ability to efficiently process lowgrade ores has allowed the Gold Fields Mesquite Mine in Imperial County, CA to expand from a 2.1 Mt/a (2.3 million stpy) rate in 1986 to its present 7.3 Mt/ a (8
Jan 1, 1990
-
The Lithium Industry - Challenges For The Future - IntroductionBy I. A. Kunasz
This paper is not intended to review and re-state general information on lithium, but rather to analyze the paradigm that has caused such a rapid rise in lithium production and the development of new
Jan 1, 2011
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLOBy Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
“They Want to Dig a 100-Foot Hole in Front of My House for Two Years!” - Community Mitigation and Outreach for DC Water’s First Street TunnelBy Carlton M. Ray, William P. Levy, Thomas Lindberg
"The District of Columbia Water and Sewer Authority (DC Water) is implementing its $2.6 billion DC Clean Rivers Project to reduce combined sewer overflows to the District’s receiving waterbodies and m
Jan 1, 2016
-
Open Pit Geometry Modeling And Economic Analysis Of Novel At-Face-Slurry OptionsThe evolution of surface mine layout configuration is a function of the schedules and sequence of material excavation within the optimized layouts. The production schedules and sequence of materials m
Jan 1, 2011
-
Organic Substrate Selection Criteria For Sulfate Reduction Treatment Of Mining Influenced Waters ? IntroductionBy P. A. Hagerty
Biological treatment of metals-impacted water using sulfate reduction is a viable means of treatment that has been applied in pilot and full scale at numerous projects. One of the fundamental challen
Jan 1, 2011
-
The State-Of-The-Art In Coal Pillar Design (3e1e9644-bc26-47b0-b008-fa7caf24005f)By 1980, the U.S. mining community had reached a broad consensus regarding coal pillar design. The pillar load could be estimated from tributary area theory, and the pillar strength from empirical fo
Jan 1, 1999
-
TECHNICAL NOTE - Influence of Process Variables in the High Gradient Separation of Uranium OresBy S. G. Malghan, J. P. Van Dillen
Introduction Some uranium minerals are paramagnetic and hence are amenable to concentration by high gradient magnetic separation (HGMS). This paper describes effects of the HGMS parameters-pulp vel
Jan 12, 1983
-
Arizona Copper Industry Continues to Face ChallengesBy William R. Yernberg
The 2002 Arizona Conference was held Dec. 8 and 9, 2002, at the Doubletree Hotel at Reid Park in Tucson. The annual conference is organized by the Arizona Conference Board of Directors, which represe
Jan 1, 2003
-
Modelling of Fragile Coal Mine Roof and Estimation of Rock Loads—Some Empirical and Numerical Methods - Mining, Metallurgy & Exploration (2023)By Amar Prakash, V. M. S. R. Murthy, Ajoy Kumar Singh, Avinash Paul, John Loui Porathur
Weak, layered, and fragile rock mass formation, if not supported properly, is subject to roof failure thereby affecting safety and productivity in underground coal mines. Though Central Mining Researc
Sep 1, 2023
-
Creation Of An Underground Mine Development Sequencing OptimizerBy M. J. Blattman
Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret
Jan 1, 2003
-
Application Of The Aqueous Biphase Separation (Abs) Process For the Separation Of Ultrafine Industrial MineralsBy R. Mensah-Biney
The aqueous biphase separation process (ABS) has been used to separate ultrafine industrial minerals. The partition behavior ofTiO2, Al2O3, Fe2O3 and kaolin was not pH dependent. The partition beha
Jan 1, 1999
-
A Rock Mass Classification Scheme For The Planning Of Caving Mine Drift SupportsBy Z. T. Bieniawski, E. H. Skinner, R. A. Cummings, F. S. Kendorski
INTRODUCTION Caving Mine Drift Support Design The support of production drifts remains a high-cost item facing the developer or operator of an underground caving mine. Support costs are incurre
Jan 1, 1983
-
Nature Friendly Sustainability: MiningBy M. Javier
This concept paper is presented in the hope of raising the awareness of mankind on the necessity for its peaceful coexistence with nature. It is a food for thought. It takes compromise and sacrifice o
Feb 27, 2013