Coal Pillar Extraction Experiences In New South WalesBy G. H. Lind
New South Wales has a successful history of pillar extraction stretching back more than 60 years. Various methods of pillar extraction ranging from the rib pillar methods (such as the Wongawilli syst
Jan 1, 2002
-
Strong ground motion and site response of mine-induced seismic eventsBy S. K. Murphy, S. M. Spottiswoode, A. M. Milev, D. Geyser
A portable, stand-alone instrument especially designed for recording strong ground motion was used in this study to create a large database of peak particle velocities measured underground. A total nu
Jan 1, 2003
-
Catalyst management ? SynopsisBy L. Hansen
Sulphuric acid plants now and then see unexpected increases in SO2 emissions. Our experience is that it is not always easy for the acid plants to pinpoint the exact reason for the SO2 increase. Some
Jan 1, 2009
-
Behaviour analysis of a slope in the river Sela right backBy J. E. Quintanilha de Menezes, L. Ribeiro e Sousa, I. Ferreira
The Paradela dam has a spillway that makes it possible to discharge a maximum flow of 400 m3/s, the water discharges being on the river Sela, about 2km upstream the river Cávado. After the first use o
Jan 1, 2003
-
The Ultimate Screener - IntroductionBy R. Dass
Paper written on project work carried out in partial fulfilment of B. Sc Eng (Extractive Metallurgy) degree Screening is an industrial process that splits material at a specific cut size into one f
Jan 1, 2004
-
A heat transfer model for high titania slag blocks - SynopsisBy H. Kotzé
Titania slag is used as feedstock in the production of titanium dioxide pigment. It (titania slag) is the product of ilmenite smelting,a process whereby ilmenite is reduced at high temperature utilizi
Jan 1, 2010
-
Applicability Of The Hoek-Brown Failure Criterion And The Effect Of The Anisotropy On Intact Rock Samples From Athens SchistBy H. Saroglou
The anisotropic behaviour of Athens Schist has been brought out through the testing of specimens with varying orientation of schistosity with respect to the major principal stress under uniaxial, tria
Jan 1, 2004
-
LHD optimization at an undergroundchromite mineBy W. Mbhalati
"Conzal Mine was not meeting production targets in 2013, and it was established that this was caused by the inability of the load haul dump machines (LHDs) to tram the required tonnages. An investigat
Jan 1, 2015
-
The Use Of Commercial Oxygen Probes During The Production Of High Titania SlagsBy J. M. A. Geldenhuis
This work is concerned with studying possible reactions in the ilmenite furnace which may control the product quality of both slag and metal. Two different approaches were followed: comparing actual f
Jan 1, 1999
-
1.1 KenyonStandards And Laboratory Monitoring In Gold Assay Key Components Of Best Practice
Jan 1, 2005
-
Thermophilic Mineral Bioleaching Performance: A Compromise Between Maximizing Mineral Loading And Maximizing Microbial Growth And ActivityBy A. Sissing
Paper written on project work carried out in partial fulfilment of M.Sc. (Chemical Engineering) degree Thermophilic bioleaching, conducted at temperatures in excess of 65°C, provides considerable b
Jan 1, 2003
-
A Review On The Progress Towards PT-Base Superalloys For Ultra High Temperature ApplicationsBy S. Vorberg, J. Preussner, B. Fischer, U. Glatzel, R. Völkl, M. Wenderoth
Pt-Al-X alloys have shown good mechanical properties and adequate oxidation resistance. Starting from a promising Pt-Al-Cr alloy, the influence of Ni additions was investigated. After ageing finely di
Jan 1, 2006
-
Quantification Of Stope Fracture Zone Behaviour In Deep Level Gold MinesBy J. A. L. Napier
This paper presents an overview of work carried out by the CSIR Division of Mining Technology and formerly by the Chamber of Mines Research Organization (COMRO) to quantify the behaviour of the stope
Jan 1, 1997
-
Hybrid finite-/discrete-element modelling of progressive failure in massive rock slopesBy H. Willenberg, J. S. Coggan
ABSTRACT: Although individually both continuum and discontinuum numerical analyses provide useful means to analyze rock slope stability problems, complex failures typically involve mechanisms related
Jan 1, 2003
-
Determining Settlement Rates and Surface Stability Using In Situ Density of Backfill as a Proxy for DisplacementBy D. Fenn, A. du Kanda, D. Dukhan
"SynopsisGibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacemen
Jan 1, 2015
-
Dynamic Support Rationale and SystemsBy U. Singh, E. T. Brown, J. Coxon
The rapid fracturing and deformation that occurs around excavations during rock bursts demand that support and reinforcement systems have both deformability and damping capabilities. The energy deman
Jan 1, 2003
-
Evaluation Of Oxine-Type Ligand Coordination To Zirconium (IV) - SynopsisBy M. Steyn
[Zr(C9H6NO)4]?(HCON(CH3)2)?(H2O), where (C9H6NO) = 8-hydroxy quinoline (oxH), was synthesized and characterized. This tetrakis-coordinated zirconium complex crystallized in the triclinic crystal syste
Jan 1, 2013
-
A Proposed Approach for Modelling Competitiveness of New Surface Coal MinesBy J. W. Joubert, R. C. W. Webber-Youngman, M. D. Budeba
"SynopsisCost estimation for surface coal mines is a critical practice that affects both profitability and competitiveness. New mines require these costs to be estimated using available information be
Jan 1, 2015
-
Strategic long-term planning at Anglo Platinum - SynopsisBy G. L. Smith
This paper consolidates the key elements of seven contributions, on strategic long-term planning, to two of the three international conferences on Strategic versus Tactical approaches in Mining held o
Jan 1, 2009
-
Strategies and tactics to control seismic risks in mines - SynopsisThe risk associated with mining induced seismicity is one of the major threats to the safety and sustainability of deep underground mines. This paper describes techniques that allow site practitioners