Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stabilization and regeneration of Ce02 and Ce02/Zr02 based Pt catalyst for the water gas shift reaction

    By R. M. S. Häggblad

    The article deals with stabilisation and regeneration of Ce02 and Ce02/Zr02 based Pt water gas shift catalysts, subject to high initial deactivation. The reaction gas species effect on the catalyst de

    Jan 1, 2005

  • CIM
    Stable isotope geochemistry related 10 gold mineralization and expwration in the western shield

    By Ian Hattie, Mark R. Wilson, T. Kurtis Kyser, Brian W. Janser

    Petrographic, chemical and isotopic compo itions of auriferous and non-auriferous quartz vei ns from the Sta r Lake and Flin Flin-Amisk Lake areas of northern Saskatchewan indicate diver e origins fo

    Jan 1, 1986

  • CIM
    Impurity Removal in the Jarosite Precipitation Circuit of the Electrolytic Zinc Plant of Met-Mex, Peñoles S.A C.V

    By C. Rocha R.

    Petioles is a mining group with integrated operations in the smelting and refining of non-ferrous metals, and is also a chemicals producer. Peñoles is the world's foremost producer of refined sil

    Jan 1, 2006

  • CIM
    A Study of a Simplified Theory of Gravity Concentration in Coal Jigs

    By R. P. Charbonnier

    "To understand the operation of jigs and other separating processes based on differences in gravity, it is desirable to analyse the motion of various particles in given media under specific conditions

    Jan 1, 1959

  • CIM
    Operating Risk in Economic Analysis for the Assessment of Design & Planning Alternatives in Underground Mine Feasibilities

    By S. A. Kenzap

    Risk & Uncertainty ? Uncertainty about a situation can often indicate risk, which is the possibility of loss, damage, or any other undesirable event. Most people desire low risk, which would translat

    Oct 1, 2010

  • CIM
    Overdrilling of Open-Pit Blast Holes

    By A. Galibois, H. Monette, J. L. Collins

    This paper deals with the problem of caving, which occurs in varying degrees in blast holes before loading. It is shown that the distribution of the amount of caving in materials may be described by a

    Jan 1, 1971

  • CIM
    Two-stage Counter-current Leaching Of Uranium Ore From Global Atomic’s Dasa Project

    By J. A. Brown, F. P. Kerr, M. A. Archer

    Extensive testwork on Global Atomic’s Dasa Project in Niger has been conducted at SGS Minerals laboratory in Lakefield, Ontario. Much of this testwork has focused on a two-stage counter-current leach

    Jan 1, 2020

  • CIM
    Some Mechanical and Physical Properties of the Gabbroic Rocks in the North Hatta Area, Fujuirah, United Arab Emirates

    By M. El Tokhi, H. Arman, B. M. Amin

    "This paper aims to overview some mechanical and physical features of the gabbroic rocks. The study has two phases: filed study/in-situ measurements and laboratory work. During the field studies, rock

    Jan 1, 2015

  • CIM
    Shaft Sinking Through Heavy Overburden at Falconbridge

    By R. M. Oliver

    THE Falconbridge property is almost completely covered with over-burden to a depth varying from 60 to over 200 feet. This overburden consists of grave], sand, and boulder, with bands of very fine silt

    Jan 1, 1938

  • CIM
    Mechanism Analysis and Control Technology for Strong Strata Behaviors in Shallow Depth Seams While Mining out of the Concentrated Coal Pillar in Upper Room and Pillar Goaf

    By Yin Wang, Lin Li, Zhongwei Bi, Like Wei, Wen Li, Shaogang Li, Bin Zhang, Hongjie Li

    Presently,Many long-wall fully-mechanized faces in shallow depth coal seams are below room and pillar goaf in Shendong mining area. When the working face is advanced out of concentrated coal pillar in

    Jan 1, 2015

  • CIM
    Environmental design considerations for belt conveyors

    By M. Bender, H. D. Goodfellow

    "Belt conveyors, because of their low capital and operating costs and inherent flexibility in handling a wide variety of products, have numerous applications in the mining industry. With the increased

    Jan 1, 1982

  • CIM
    Local Content: Policy, Practice, and Emerging Issues

    By A. M. Esteves

    This paper offers an overview of local content policies and practice in the mining sector. Specifically, the paper aims to answer the question of how national and regional governments, industry and ci

    Aug 1, 2013

  • CIM
    Application of Structural-Thermal Modelling to Negate the Need for Movement Joints within a Frozen Mine Shaft

    By A. Pearson, Auld. F. A., S. O. Colbeck

    "To minimise mine shaft maintenance over the long-term, some potash mine shaft sinking projects have required the provision of a continuous fully welded waterproof steel liner over a substantial depth

    Jan 1, 2019

  • CIM
    Cratering by a Row of Short Charges

    By Robert R. MacLachlan

    New underground mining technology is evolving through the use of large-diameter bore holes containing individually restricted charge weights. This article presents summary observations on cube-root s

    Jan 1, 1978

  • CIM
    Mining problems at La Mine Bousquet

    By Bennett McLaughlin, Gille Brousseau, John F. Cook

    "La Mine Bousquet commenced operations in October 1979. Mining has been by underground methods from two main zones which dip steeply to the south , Sub-level stoping methods with following fill are us

    Jan 1, 1985

  • CIM
    A critical examination of the methods and factors affecting the selection of an optimum production rate

    By Lawrence Devon Smith

    The selection of the production rate is one of the most crucial decisions to be made in the development of a mineral property. However, it is not uncommon for the production rate to be decided arbitra

    Jan 1, 1997

  • CIM
    Process Improvements at Falconbridge Dominicana

    By D. Ortiz, J. R. Frias, E. D. Mast, J. J. Fañas

    Falconbridge Dominicana (Falcondo) has operated an integrated tpy nickel laterite mine and ferro-nickel processing plant since 1972 in the Dominican Republic. The operation includes mining, a processi

    Jan 1, 2005

  • CIM
    Estimation of the Average Value of Gold Ore

    By W. A. Jones

    THE estimation of the average value of gold ore involves many considerations, among them the correct sampling of the deposit, the dilution by waste, and the loss of high-grade fines. It is a common ex

    Jan 1, 1943

  • CIM
    The use of rubber in the mining industry

    By W. Fergusson

    This paper takes a look at the use of rubber to provide corrosion resistance and wear resistance in the mining industry. The longer life and reduced down time involved with the use of rubber are stres

    Jan 1, 1979

  • CIM
    Continuous Evolution of Porcupine Joint Venture (PJV) Dome Mine's Effluent Treatment Plant

    By T. Y. Chong, J. A. Folinsbee

    Since milling began in 1909, the PJV Dome mill has been expanded several times, to the current throughput of 11,500 tonnes per day. PJV recovers free gold using crushing and grinding followed by gravi

    Jan 1, 2005