Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Grindability of Indonesian Coals

    By Yu AB, Azahari HL

    Indonesia has the largest coal reserves in the south-east Asian region. According to estimates from the World Energy Confer- ence, it has reserves of 18 billion mt lignite, 4.4 billion mt sub-bitumi

    Jan 1, 1993

  • AUSIMM
    Water Management Issues for Mining Proposals at the Environmental Impact Assessment Stage

    An Environmental Impact Statement (EIS) for a major mining development typically has to address various aspects of surface water management, including some which generally tend to be the more contenti

    Jan 1, 2003

  • AUSIMM
    Computer Program for Planning of Mine-Ventilation Systems

    Today the application of computer programs for planning of mine-ventilation and for safety- analysis of ventilation systems is widespread practice in German mining. The computer program for network c

    Jan 1, 1983

  • AUSIMM
    The Influence of Various Elements on The Mechanical Properties of Copper Containing a Small Percentage of Bismuth

    In the course of an investigation of the influence of bismuth on copper carried out some years ago, (1) the author found that phosphorus exerted a beneficial effect on bismuth-copper alloys of low bis

    Jan 1, 1942

  • AUSIMM
    The Topmost Gold Deposits in China in the Part of the Northwest Pacific Rim with Emphasis on Gold Prospecting

    Gold mineralization belt of eastern China in the adjacent part of the northwestern Pacific rim is orientated NE to NNE and as-sociated with Mesozoic faults and igneous intrusives and Mesozoic to Cenoz

    Jan 1, 1990

  • AUSIMM
    Pillar Extraction at the Doe Run Company, 1991-1998

    By W L. Lane, T R. Yanske

    The Doe Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaining

    Jan 1, 1998

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • AUSIMM
    Scott Lode: A Significant High Grade Gold Deposit

    By Cornwell P. J

    The Pajingo ore bodies consist mainly of auriferous quartz veins hosted by a suite of hydrothermally altered andesitic pyroclastics, volcanics and epiclastic sediments. Scott lode, the main econom

    Jan 1, 1989

  • AUSIMM
    Legislative Measures Concerning Subsidence Associated with Coal Mining in N.S.W.

    By Holla L

    There exist several legislative provisions in N.S.W. which work together to control surface subsidence due to extraction of coal by underground methods. The important ones are the Coal Mining Act,

    Jan 1, 1986

  • AUSIMM
    Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings Impoundment

    By G W. Wilson

    Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b

    Jan 1, 2003

  • AUSIMM
    Stope Optimisation Tools for Selection of Optimum Cut-Off Grade in Underground Mine Design

    By B Hall

    In feasibility studies the choice of optimum cut-off grade is typically based on an evaluation of tonnage grade curves and manual design of stopes at one or two cut-off grades. In the industry these s

    Jan 1, 2009

  • AUSIMM
    Highly Metamorphosed Ferromanganese Sediments in the Vicinity of the Broken Hill Orebody.

    Ferromanganese metasediments in the immediate vicinity of the Mid-Proterozoic Broken Hill Pb-Zn-Ag lodes, have undergone high grade (upper amphibolite facies) metamorphism,to form Mn-pyroxenoid (rhodo

    Jan 1, 1990

  • AUSIMM
    Regional Alteration Patterns and Gold Mineralization in the Archaean Norseman-Wiluna Belt, Western Australia

    By Groves D. I

    The Norseman-Wiluna Belt (Fig.1) is a richly mineralized (production 1900 tonnes Au), Archaean greenstone belt, up to 800km long and 200km wide, which forms the major part of the Eastern Goldfields

    Jan 1, 1988

  • AUSIMM
    Risk Based Water Management ù Practical Application for Serious Management

    By J L. Merritt

    Effective minesite water management requires that this issue be treated as a risk management exercise. The management process is generally far from simple and by necessity must involve a range of pers

    Jan 1, 2003

  • AUSIMM
    A Technology of Precious Metals Recovery from Gold-Bismuth Ores

    By V P. Beskrovnaya

    Tests for the development of a metals recovery technology from samples of a Russian gold-bismuth deposit were carried out. Gold, silver and bismuth assay reported 5.6 g/t, 3.0 g/t and 0.08 per cent, r

    Jan 1, 2007

  • AUSIMM
    Critical Comparison of Julius Kruttschnitt Mineral Research Centre (JKMRC) Blast Fragmentation Models

    By I Brunton

    Blast fragmentation can have a significant impact on the profitability of a mine. An optimum run of mine (ROM) size distribution is required to maximise the performance of downstream processes. If thi

    Jan 1, 2001

  • AUSIMM
    The Evaluation of the Mining Aspects of Coal Projects

    The basic model for the evaluation of any coal-bearing property is the cash flow projection, the major components of which are operating costs, capital charges, taxation and revenue. A range of cash

    Jan 1, 1975

  • AUSIMM
    Structure of Thiol Collector Layers on Sulphide Surfaces

    By Laajalehto K

    The basic condition necessary for flotation is hydrophobicity of the surface of the mineral to be floated. For sulphides, this condition usually requires treatment with a collector solution. The co

    Jan 1, 1993

  • AUSIMM
    Blast Movement Modelling and Measurement

    By D Thornton

    Geologists use large data sets and spend many hours and much computing time modelling the distribution of minerals throughout a rock mass. Significant investments in drilling, assaying and quality ass

    Sep 26, 2011

  • AUSIMM
    Reliability Analysis of Semi-Continuous Coal Haulage System

    By Daxian Z, Youdi Z, Shucai Y

    The Huolinhe surface mine is a very large-scale surface coal mine, located in the north-east area of China with a production rate of 1.2 Mtpa. Its coal haulage system has a large capacity, long tran

    Jan 1, 1995