Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A New Geological Model for the Globe Progress Mine, New Zealand

    By L J. Reynolds

    Gold mineralisation at the Globe Progress deposit is hosted by a geologically complex zone of shearing and brecciation, within a package of deformed metasediments. Mineralisation styles range from qua

    Jan 1, 2006

  • AUSIMM
    The Mineral Wealth of Nations (4aa887e7-f3ad-4ddc-afe8-5174ce2ed19b)

    In the geologically prospective nations which rim the Pacific Ocean, mineral deposits offer great potential to create wealth for social and economic development. The paper first examines the geologic

    Jan 1, 1995

  • AUSIMM
    Simulation of Water Quality in Underground Gold Mine Service Water Circuits

    By Wiechers HNS

    In China the hydrogeological type of solid mineral deposits can be divided into A. Mineral deposits with fissure water; B. Mineral deposits with pore water; and C. Mineral deposits with karst water.

    Jan 1, 1988

  • AUSIMM
    The Introduction of Self Contained Self Rescuers into the South African Mining Industry

    The Government Mining Engineer of South Africa has decided to legislate that Self Contained Self Rescuers (S.C.S.R.) become a mandatory piece of equipment for all those persons proceeding undergro

    Jan 1, 1988

  • AUSIMM
    Testing the Design of a Mine Winder Control System Using Simulation Techniques

    The control system of a mine winder or other variable speed drive has many component parts that must work together to provide the required functional performance of the machine, together with comprehe

    Jan 1, 2005

  • AUSIMM
    Metallurgical Properties of Synthetic Sylvanite

    A synthetic gold-silver telluride material (mainly sylvanite) has been prepared and its physical and chemical properties checked. Flotation tests using a Hallimond tube were conducted using commercial

    Jan 1, 1994

  • AUSIMM
    Computer Modelling in the Solution of Continuous Miner Heading Ventilation Problems

    By Meyer C. F

    The increasing use of continuous miners in the extraction of high coal seams has amplified the need for enhanced ventilation systems in the headings. Owing to larger face dimensions and higher produ

    Jan 1, 1995

  • AUSIMM
    Integrating North American Shaft Sinking Practices into Australian Operations ù Telfer Hoist Shaft Development

    By P Bonniwell

    As a part of the Newcrest, Telfer Expansion Project, a consortium of Australian, Canadian and South African Mining Contractors in joint venture have been contracted to develop the hoisting shaft. The

    Jan 1, 2005

  • AUSIMM
    Pipeline Transportation of Mineral Suspensions

    By Boger D. V

    Two industrial case studies in which detailed investigation of the flow behaviour of mineral slurries is used to assess the feasibility of pipeline solid transport are described. The first example d

    Jan 1, 1989

  • AUSIMM
    Short Term Mine Management Systems û An Integrated Approach to Blast Design, Grade Control, Stockpile Management and Reconciliation

    An integrated computer system (the Short Term Mine Management System) has recently been developed by B.H.P. Steel Long Products Division in Whyalla, South Australia for use in their open pit iron ore

    Jan 1, 1990

  • AUSIMM
    Blast Improvements with Electronics at Sunrise Dam Gold Mine

    By G Billing a, D Gribble, E Hall, D Varga

    The theoretical benefits of electronic detonators have been reasonably well documented. To support this, a practical comparison was made between the performance of the standard shock tube system, NONE

    Jan 1, 2007

  • AUSIMM
    Three-Chamber Pipe Feeder in Underground Gold Mine Applications

    By Geisler P, Sutherland P

    The technical limits for high-pressure transport of large particle solids by means of sludge pumps, piston pumps or the like lead to the development of the pipe-feeder system. The pipe-feeder is a t

    Jan 1, 1991

  • AUSIMM
    Current Drilling Practice at Isa Mine

    By Stevens P

    The Isa Mine of Mount Isa Mines Limited currently produces 5.4 million tonnes of copper ore and 3.3 million tonnes of silver, lead and zinc ore annually. Of this, 5.1 million tonnes of copper ore

    Jan 1, 1982

  • AUSIMM
    Oaky Creek Coal - Improving Productivity

    By Lynch P

    Oaky Creek Coal Pty Ltd. currently mines high quality coking coal from both underground and open cut operations at its Oaky Creek Mine. Coal is transported by rail to the Dalrymple Bay Coal Terminal s

    Jan 1, 1998

  • AUSIMM
    Artificial Wall Support Solving a Unique Problem at Mt Whaleback

    The South Wall Base Case Design for Mt Whaleback indicated that along portion of the South Wall a cigar shaped synclinal keel, contain- ing 14 800 m', of Dales Gorge Member ore, would be unkeyed

    Jan 1, 1989

  • AUSIMM
    Process Design for Flocculation, Clarification and Thickening of Fine-Particle Suspensions

    The effects of process variables such as solution chemistry, flocculent type and dosage, intensity and duration of mixing, and solids type and concentration, on the performance of flocculation/clari

    Jan 1, 1993

  • AUSIMM
    Rock Cuttings for Railways-Construction Methods and Geology

    Railway cuttings require the highest care in design and construction, as the pro- bability of failure concept does not allow any risks to be taken with hundreds of lives being dependent on continued

    Jan 1, 1979

  • AUSIMM
    The Halloysite Clays of Northland, New Zealand (8b1b7779-6b27-407c-8df6-0530480970df)

    By Townsend MG, Evans RB

    In Northland, New Zealand, localised large deposits of halloysite clay have been produced by in-situ alteration of rhyolite volcanics of Pliocene or Pleistocene age, which were erupted through pre- Pl

    Jan 1, 1990

  • AUSIMM
    The Cretaceous Paleogeology of the Taranaki û Cook Strait Area

    Cores of pre-Tertiary basement from ten oil exploration wells are related petrologically to the "axial", "marginal" and "shelf" facies of the New Zealand Geosyncline.A NW

    Jan 1, 1967

  • AUSIMM
    The Concentrating Practice of the Broken Hill South Limited

    The concentrating plant of the Broken Hill South Limited was described in Proceedings No. 44, Australasian Institute Mining and Metallurgy, December, 1921, by Wainwright and Read. It was erected on th

    Jan 1, 1932