Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sampling and Analysis Without Fear or Favour

    Sampling and analysis of mineral deposits need to be executed without fear or favour of financial or personal impacts. Examples are given to illustrate the effects of departures, witting and unwitting

    Jan 1, 2004

  • AUSIMM
    Results From Induced Polarisation Surveys Over the Beruang Copper-Gold Deposit in Central Kalimantan,Indonesia

    The Beruang Copper-Gold Deposit is located very near the centre of Kalimantan in Indonesia. It is a dacitic tuff hosted deposit currently being explored by Kalimantan Gold Inc of Canada. Exploration a

    Jan 1, 2004

  • AUSIMM
    Non-Electric Mass Blasting as Practiced at Mount Charlotte

    The proximity of the Town of Kalgoorlie to the Mount Charlotte mine necessitates that charge weight per delay be limited in order to keep surface vibration levels within acceptable limits and to re

    Jan 1, 1982

  • AUSIMM
    Pressure Cyanidation of Pyrite Concentrates

    By Rowe P, Rogers D, Warren M

    Pressure cyanidation of the minus 10 micron slimes fraction of the Fimiston flotation concentrates for the recovery of gold values has been evaluated as an alternative processing route to the roasti

    Jan 1, 1996

  • AUSIMM
    Olympic DamÆs Underground Rail Haulage System ù Six Years On

    By C Fearon

    This paper discusses the implementation of an underground rail haulage system during a major expansion of the Olympic Dam mine in 1998. The factors affecting the selection of rail haulage are discusse

    Jan 1, 2005

  • AUSIMM
    Mobile Miner MM130 - A Mining Innovation

    The Mobile Miner MM130 (Figure 1) is designed to tunnel or mine in hard rock. It has a 4.1 m diameter cutterhead mounted on a horizontal axis which in turn is perpendicular to the line of the machine.

    Jan 1, 1993

  • AUSIMM
    Diesel Engine Developments for the Mining Industry

    Although the diesel engine is normally considered a tried and proven power source, many new and exciting diesel design concepts are being evaluated in engine development laboratories around the wor

    Jan 1, 1982

  • AUSIMM
    Spot Imagery for the Detection of Anomalous and Stressed Vegetation Over Mineral Deposits in Semi Arid Terrain

    SPOT imagery acquired in May 1986 of the areas that include the Dugald River lead-zinc lode, northwest Queensland, Australia and the Ngwenalekau copper deposit, Botswana has been evaluated and comp

    Jan 1, 1988

  • AUSIMM
    Some Problems in Deep Open Cut Mining and their Solution by Goldsworthy Mining Limited

    The iron ore mining operations carried out by Goldsworthy Mining Limited at Golds- worthy, Shay Gap and Sunrise Hill, in the Pilbara region of the North-West of Western Australia, are unusual insofa

    Jan 1, 1979

  • AUSIMM
    Overview of the White Rock Tungsten Deposit, New South Wales

    By G D. Carman

    White Rock is a reduced tungsten-tin skarn deposit near Rye Park, New South Wales. This abstract summarises the depositÆs mining and exploration history, and current exploration by Paradigm Metals Ltd

    Jan 1, 2008

  • AUSIMM
    A Revision of Ore Evaluation Techniques at Sishen Iron Ore Mine, South Africa

    By Schoning W. L

    Ore deposit models form the basis for numerous other economic decisions in the mining process. The success of these economic decisions therefore depend directly on the accuracy of the ore evaluation

    Jan 1, 1995

  • AUSIMM
    Recovery of Old Mine Workings in Weak Ground

    By McCarthy P. L

    With production at Olympic Dam scheduled to commence in June 1988, it has been necessary to install a complete underground ore handling system capable of removing two million tonnes of material a

    Jan 1, 1988

  • AUSIMM
    Gold Mineralization of New Caledonia

    New Caledonia is a major metallogenic unit of the south-western Pacific Rim. Its mineral production is of world significance and it has an unusually well diversified mining history. New Caledonia&

    Jan 1, 1987

  • AUSIMM
    Pit Lake Sustainability - What Is It, and How Do I Get It?

    By M Lund

    Due to operational and regulatory practicalities, pit lakes will continue to be legacies of many open cut mining lease relinquishments. Unplanned or inappropriate management of these significant geogr

    Jan 1, 2006

  • AUSIMM
    The Charging of Slurry Explosive with the Nitro Nobel Cartridge Loader at the Mount Lyell Mining and Railway Co. Ltd., Queenstown, Tasmania

    By Wilson J. R

    The main mining method employed at Mt Lyell is sub-level open stoping with a typical extraction level interval of 100 m and sub-level intervals of 30 m. Currently, pillar blasts provide the major p

    Jan 1, 1977

  • AUSIMM
    The Simulation of a CIP Plant Incorporating Shifting Equilibria Dependent on Cyanide and Copper

    By R C, K L. Rees, J S. J van Deventer

    In contrast with previously published models for the carbon-in-pulp (CIP) process, the model proposed in this paper incorporates film transfer, intraparticle diffusion, simultaneous leaching, preg-rob

    Jan 1, 1998

  • AUSIMM
    Demand for Metals

    The role of metals in the economy is discussed with regard to the flow of metals through to final demand and is illustrated by data for seven metals. Factors influencing the changing pattern of met

    Jan 1, 1979

  • AUSIMM
    Process developments at Bouganville Copper Limited

    The original design of the Bougainville Copper Limited (BCL) concentrator took cognisance of the constraints imposed by the topography, the need to minimise capital cost, and the need to allow for pla

    Jan 1, 1986

  • AUSIMM
    Two- and Three-Dimensional Numerical Analysis of the Interaction Between Open Pit Slope Stability and Remnant Underground Voids

    By M E. Pierce

    Recent advances in comminution and heap leach technology have resulted in the development of many large-scale, low-grade open pit mines that coincide with areas of historical underground workings. Two

    Jan 1, 2003

  • AUSIMM
    The Development of Hunter Valley Coal Preparation Plant

    By White PJ, Worrad C

    The Hunter Valley Coal Preparation Plant and associated materials handling facilities commenced operation in mid 1982. The new plant and coal handling system were designed to integrate with existing m

    Jan 1, 1985