The Mount Bonnie Gold Silver ProjectBy Eupene GS, Cheong GE
Operations at the Mount Bonnie gold/silver project are described. The project is based on the gossan of a stratiform and stratabound polymetallic sulphide deposit. The gossan contains approx- imat
Jan 1, 1984
-
Optimising Coal Dust Suppression Factors in a Laboratory Using a Three-Level Factorial ApproachBy Tien J. C
Many factors (type of coal mined, water pump pressure, wetting agent concentration, etc) will affect the performance of a dust suppression system using a water spray in an underground coal mine. Whi
Jan 1, 1994
-
Virtual Hailage Trucks: Improving the Safety of Surface MinesBy Denby B, Hollands R. Schofield D
Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th
Jan 1, 1998
-
Tropical Information System - Its Communications and ApplicationsBy Stanton G
The Department of Mapping and Surveying (DMS), the Australian Key Centre in Land Information Studies (AKCLIS), the Department of Industry Development (DID) and the State Government Computer Centre
Jan 1, 1987
-
Horizontal Drilling Technology for Coal Seam Methane RecoveryBy Bockhorst R. W, Christopher D. A
Over the past fifteen years, horizontal drilling in coal seams for advance degasification has become an established practice in the United States of America. Consolidation Coal Company pioneered t
Jan 1, 1988
-
The Application of Linear Programming to the Blending of Coals for ExportThe application of new and currently practised mining techniques in new areas and at greater depths necessitates considerable and immediate research effort. This effort is aimed at identifying the
Jan 1, 1981
-
Development And Production Of The 15 To 13 Level Modified Micaf, Mount Isa Mines LimitedThe Racecourse Orebodies at Mount Isa consist of a series of parallel steeply dipping lead/zinc/silver orebodies with a strike length of up to 1000 metres. Production from these orebodies between 1
Jan 1, 1977
-
The Design Of A Sand Pump For Optimum ResultsThe design of a sand pump is similar in principle to that of a water pump but differs in several areas. Results of experiments on sand pump performance have been summarized and values of design par
Jan 1, 1973
-
Metallurgical Properties of Synthetic CalaveriteBy Lawson F
Synthetic calaverite (Au Tez) has been prepared and its physical properties checked.Simple flotation tests indicate that the recovery of calaverite should be possible using n-butyl or sec-butyl xantha
Jan 1, 1991
-
Suitability Of Different Types Of Pellets For Use In Blast Furnaces Or Direct Reduction Shaft-FurnacesBy de Lassar de Pressigny Y
IRSID has in its laboratories two experi mental counter-current reduction furnaces allo- wing the simulation of the physico-chemical conditions of reduction in any gas-solid coun- ter-current process
Jan 1, 1974
-
The Design and Construction of a Reinforced Concrete Headframe for the Haulage Shaft at the New Broken Hill Consolidated Limited Min, Broken HillThe construction of mine headframes of reinforced concrete is not a new departure as many structures have been built of this, material particularly in Canada and South Africa. This type of constructio
Jan 1, 1956
-
Methane in German Hard Coal MiningBy den Drijver J
Worldwide, hard coal mining is being carried out at ever increasing depth, and has, therefore, to cope with correspondingly increasing methane emissions. About seven per cent of global methane emis
Jan 1, 1995
-
Longhole Open Stoping in the ZC ""Crack"" ZoneBy Matthews SM, Gooding JE
N Longhole Open Stope at The Zinc Corporation Mine was developed in an area with large and continuous tension cracks. These cracks resulted fran widespread block subsidence into previously mined areas
Jan 1, 1985
-
Monitoring and Predictive Modelling of Subsidence in the West Moreton CoalfieldAn ongoing research program into surface subsidence over Room and Pillar coal mining is described. A subsidence monitoring network has been established for one Room and Pillar mine in the West Mor
Jan 1, 1986
-
Ore Quality Control for Process OptimisationBy Sehic O. A
Geology can be the root of evil or a source of bliss; there is a choice; to ignore geology is at a mine's peril.Risk can be minimised and profitability maximised by the application of a detailed
Jan 1, 1993
-
Fundamentals and System Research in Ultrasonic Comminution TechnologyBy King RP, Kientzler P
In recent years, ultrasonic comminution technology has been developed at the Utah Comminution Center. An ultrasonic grinding device was assembled and investigated. An ultrasonic transducer system ha
Jan 1, 1993
-
Ground Control Procedures in Western Australian Underground Mines - a Critical ReviewA review of ground control procedures in Western Australian underground mines is presented. Geotechnical input into initial mine design and methods of ground control is rare. As a result, the frequenc
Jan 1, 1992
-
Bronzewing and Jundee Gold Mines--Five Years After DiscoveryIn the five years since Great Central Mines Limited (GCM) commenced exploration in the Jundee and Bronzewing areas of Western Australia's Yandal greenstone belt, the Company has been transformed
Jan 1, 1997
-
Production Blasting at Isa MineBy Bradford NL
The Isa Mine of Mount Isa Mines Limited produces 5.1 million tonnes of copper ore and 2.2 million tonnes of silver-lead-zinc ore from sublevel open stopes annually. Extraction of the narrow, steepl
Jan 1, 1982
-
Geological and Grade Risk at the Golden Gift and Magdala Gold Deposits Stawell, Victoria, AustraliaBy M Stewart, J Vann, A Bu, D Frederickson
The Golden Gift is a recently discovered deep deposit below the main operating areas of the Stawell Gold Mine. At an early stage of the project, diamond drilling was used to define the mineralisation