Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Staying in the Game – the Importance of Engineering-based Decisions

    By P J. Fairfield

    This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses

    Jun 22, 2016

  • AUSIMM
    An Integrated Approach to Optimising All Concentrator Products, Including Tailings

    By A Riles

    "Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o

    Jun 15, 2016

  • AUSIMM
    Recommended Design Methods and Serviceability Limits for Permanent Rock Bolts

    By D J Maconochie

    The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with

    Mar 8, 2011

  • AUSIMM
    Sustainable Phytostabilisation of MineTailings - A Critical Analysis of System Requirements and Approaches

    By T Baumgartl, M Edraki, L Huang, D R. Mulligan

    "Phytostabilisation with tolerant plant species has been advocated as a cost-effective solution for sustainable cover of tailings from metal mines and bauxite refinery. The development of sustainable

    Jul 10, 2012

  • AUSIMM
    Comparison of Acid Production From Pyrite and Jarosite

    By M Berndt

    Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt

    Jan 1, 2003

  • AUSIMM
    Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiatives

    By S J. Loach

    F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade

    Sep 18, 2023

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    Continuous Monitoring Techniques for Environmental Control of Waste Water Discharge at Northern Territory Mine Sites

    By Mine F. J, Woods P. H

    The Top End of the Northern Territory lies in the monsoonal zone and receives rain during the November-April period. Initially, at the start of the wet season, rain storms are localised, but, follow

    Jan 1, 1994

  • AUSIMM
    Cost-Effective Dry Screening, Dewatering and Water Treatment

    By R Norris, M Dunne

    Mining and mineral processing is expected by society and obliged by law to operate in an environmentally friendly fashion, minimising the impact on and avoiding damage to the environment. Substantial

    Jan 1, 2006

  • AUSIMM
    Tailings Dewatering, Dry Screening and Water Clarification for Reduced Water Usage

    By R Norris, M Dunne

    Substantial efforts by the industry, as well as by process and equipment designers, have resulted in many innovative developments that provide cost effective reductions in water usage. This paper show

    Jan 1, 2006

  • AUSIMM
    The Filblast Cyanidation Process

    By Bodnaras G. E, Sceresini P. A

    The Filblast Cyanidation Process incorporates the advantages of intense high shear mixing, high dissolved oxygen concentration and high pressure to achieve extremely rapid gold dissolution rates. Th

    Jan 1, 1994

  • AUSIMM
    Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)

    By D Audeyev

    The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the op

    Oct 5, 2011

  • AUSIMM
    Modelling and Design of Block Caving at Bingham Canyon

    Open pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi

    Jan 1, 2000

  • AUSIMM
    A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine Closure

    By B N. Noller, J C. Ng, S L. Bruce

    Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc

    Jul 16, 2014

  • AUSIMM
    Implementation of an Expert Control and Online Image-Based Oversize Detection at the Pilbara Iron Tom Price Operation (c28c0d5f-5fb9-42f8-9b13-de3161c056c3)

    By M Wortley, J McKay, D La Rosa, O Guyo

    It has been a generally held concept that crushing operations were, by their nature, too simple to benefit from the implementation of advanced process control. The commissioning of an OCS¬ expert cont

    Jan 1, 2006

  • AUSIMM
    Trends in real‐time instrumentation and monitoring techniques for tailings dams

    By L Clarkson, D Williams, P Redcliffe, F van der Wal

    This research presents a snapshot and insight into the trends, patterns, and common considerations identified in the current standing of real-time tailings dam monitoring practice. Based primarily on

    Jul 1, 2021

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • AUSIMM
    Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation

    By P Stewart, S Cowie, A Offer, J Carpenter, E Jones

    The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A

    Nov 21, 2018

  • AUSIMM
    The Impact of Classification on the Energy Efficiency of Grinding Circuits - The Hidden Opportunity

    By W Valery, A Jankovic

    A growing demand within the minerals industry for sustainable development and the introduction of carbon taxes have resulted in a significant focus on improving the energy efficiency of comminution ci

    Oct 29, 2012

  • AUSIMM
    Elaine Dorothy Cu-Au (REE-U) Skarn Deposit

    By P Sha

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Elaine Dorothy Cu-Au (REE-U) skarn deposit in the Mt Isa Inlier, Queensland, Australia

    Mar 18, 2015