Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Historic Gold Dredging on the West Coast

    Slide presentation at conference

    Jan 1, 1996

  • AUSIMM
    Bulk Mining Explosives ù Technical Tool or Commercial Commodity?

    By G Le Juge, K Waldock

    The current suite of bulk mining explosives has been available to the industry for over 20 years. The flexibility and performance of ammonium nitrate based emulsion blend explosives were accepted by t

    Jan 1, 2004

  • AUSIMM
    Machine Mining

    By Littlewood E

    We offer these notes as a practical contribution. All the arguments we advance have been tested by practical experience.In its preparation we realised that our subject was one of such importance and c

    Jan 1, 1944

  • AUSIMM
    Geology and Nickel Sulphide Mineralization, Honeymoon Well, Western Australia

    By Woodhouse M, Andrews D, Drew G

    The nickel deposits within the Honeymoon Well project area (26¦ 40'S, 120¦ 25'E), located 45 km south of Wiluna, occur in the northern part of the Agnew-Wiluna belt (Figure 1; Hill et at,

    Jan 1, 1996

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • AUSIMM
    Estimating the Rock Mass Strength of Hawkesbury Sandstone

    By R Bertuzzi

    "This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa

    Nov 5, 2014

  • AUSIMM
    An Aspect of Community Development in a City Based on Mining and Metallurgy-The Case of Wollongong

    Wollongong* is Australia's largest single centre of mining and metallurgy. Wollongong's total employment in manufacturing of basic metal products (over 26,500 in 1972/1973) was almost 50

    Jan 1, 1976

  • AUSIMM
    The Ore-Deposits of Captain's Flat, New South Wales

    The revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of

    Jan 1, 1941

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Inclusion of Safescape Laddertube to enhance emergency egress in ventilation shafts

    By B Murphy

    Safescape Laddertube provides an improved system for emergency egress in ventilation shafts. The addition of Laddertube in a rise has very little impact on ventilation flow, studies have indicated th

    Oct 12, 2022

  • AUSIMM
    Plant rejects disposal strategies applied at Caval Ridge open cut coal mine

    By J Li, H Hooi, D Payne

    Caval Ridge Mine (CVM) is one of the newly established open-cut coal mines of BHP in Queensland, where no tailings dam is planned to be built in order to minimise environmental impacts from mining act

    Jul 23, 2018

  • AUSIMM
    The Lateritic Regolith in Arid Terrains: Description, Formation, Evolution: Consequences for Geochemical Exploration

    The weathering profile, in arid terrains, is commonly capped by different kinds of hardened crust, whose formation is related to recent or former climates. One may distinguish silcretes, calcretes

    Jan 1, 1988

  • AUSIMM
    Creating optimised drill programs that add real value, and integrate with mine planning

    By N Anderson

    With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for

    Mar 22, 2022

  • AUSIMM
    Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG Mill

    By R A. Pax, B Cornish

    "Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly

    Oct 10, 2016

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    Diamonds Overview

    By Smith C. B

    Major diamond pipes discovered in Western Australia in the late-1970s exhibited a number of unique features that not only resulted in Australia becoming the largest diamond producer in the world in

    Jan 1, 1988

  • AUSIMM
    An Evaluation of Fracture Toughness of Coal Measures Rocks

    By Pathan AG

    This research work is concerned with an investigation of the fracture toughness of sandstone, siltstone, and coal. Tensile failure trades have been examined with three different specimen geonetrie

    Jan 1, 1986

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Testing new estimation techniques – rank and replace: a stockwork case study

    By D Finn, D Kentwell

    Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-

    Sep 20, 2017