    Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold Project

    By D P. Sainsbury, J Western, B L. Sainsbury, V Mutton, P E. Petrie

    Remnant rib pillars at Castlemaine Goldfields Ltd’s Ballarat Gold Project have been sterilised by the placement of loose rock fill in production stopes. The application of selectively injecting low-vi

    Nov 5, 2014

  • AUSIMM
    Hydroseparation Concentrates and Automated Precious Metal Searches Used to Characterise Process Products from Selected Mines

    By R Lastra, Y Choi, C Hamilton, P Kondos

    Hydroseparation (http://www.cnt-mc.com) was used to concentrate sized fractions (from <38 ¦m to 150 ¦m) of various ore products ahead of carbon-in-pulp (CIP)-treatment. The resulting size-by-size c

    Jan 1, 2008

  • AUSIMM
    Using a Sustainability Assessment Framework to Achieve Enhanced Legacy Outcomes

    By S R. Green, G D. Corder

    The legacy issues from mining can, and have often, extended well beyond the closure of operations. However, conventional cost-benefit analysis provides little incentive to implement initiatives at the

    Jul 10, 2012

  • AUSIMM
    The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modelling

    By E Asakpo, S Chaffer, A Heath

    Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin

    Aug 29, 2018

  • AUSIMM
    Computer Simulation of Stoping Methods at the Z.C. Mines Broken Hill Operations

    By Koeng R, Richardson M, Hoare R

    A discrete event computer simulation model was developed for two of the stoping methods currently used at the Z.C. Mines Broken Hill oper- ations. The objective in undertaking this project was to pro

    Jan 1, 1988

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • AUSIMM
    Real-Time Image Analysis of Iron Ore Cores and Drill Chips to Complement Spectral Measures

    By T Belligoi

    Diamond cores and drill chips provide the only direct physical evidence for ore containing rocks. Early characterisation of cores and drill chips is important as it provides critical information for d

    Jul 11, 2011

  • AUSIMM
    The Evolution of Diamond Drilling Practices at Olympic Dam

    By J Taylor, A Dubowik

    To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a

    Aug 18, 2014

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • AUSIMM
    Palaeomagnetic, Tectonic, Magmatic and Mineralisation Events in the Proterozoic of Northern Australia

    By Wyborn L. A I, Idnurm M, Hinman M. C

    Comparison of the Proterozoic Apparent Polar Wander Path (APWP) for Australia with the corresponding geology of northern Australia suggests that a number of discrete interplate tectonic events, mani

    Jan 1, 1994

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Don Hausen, Pioneering Newmont Mineralogist and Mentor - His Influence Continues on at Newmont Today

    Don Hausen was a pioneer in the field of quantitative mineralogy. Methodology that he developed at Newmont almost 40 years ago is still employed today, only the technology has advanced. Petrographic m

    Jan 1, 2008

  • AUSIMM
    CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù Results

    By A McCallum, J Abols, G Patrick, G Johansen

    The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc

    Jan 1, 2004

  • AUSIMM
    Measurement? Assessment? The Real Challenge is Communication

    One of the earliest and continuing challenges in driving sustainable development in large scale resource industry projects is around the issue of assessment û how do you measure the sustainability of

    Jan 1, 2009

  • AUSIMM
    Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques

    By J Levett, O Rondon, I Glacken

    Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl

    May 24, 2023

  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • AUSIMM
    A Multiple Blasthole Fragmentation Model – Its Concept, Formulation, Capability and Field Comparison Examples

    By R Yang

    This paper presents a fragmentation model for large production blasts in an open pit or underground environment. The paper shows that the particle velocity is directly related to pressure, strain, and

    Aug 24, 2015

  • AUSIMM
    Lithium ore processing – an overview of the current and new processes

    By N Setoudeh, A Nosrati, N J. Welham

    The current surge of interest in lithium (Li) is due to the anticipated demand for electric vehicles and small scale power storage. Brine deposits contain most of the global Li resource, however hard

    Sep 11, 2017

  • AUSIMM
    Evolution of rock fill consolidation at Pajingo Gold Mine

    By J Carswell, K McTyer

    The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product

    Nov 30, 2018

  • AUSIMM
    The Impact of Fluidised-bed Flotation for Treating Coarse Sulfides

    By H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell

    "Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in

    Oct 10, 2016