Carbon kiln selection, operation and maintenanceBy J K. Claflin, S R. La Brooy, A M. Claflin
Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad
Aug 29, 2018
-
Sunrise Dam Short- to Long-Term Ventilation PlanningBy M Podreka, P Merry, L van den Berg
Anglo Gold AshantiÆs Sunrise Dam operation is located in Western Australia approximately 55 km south of the town of Laverton. Currently, the mine is producing from both its open pit and underground op
Jul 1, 2013
-
A Kinematic Model for the Prediction of Fragment Trajectories and Muckpile Shape during Bench BlastingBy Lilly PA, Kavetsky AP
An empirical, kinematic model is developed which calculates the trajectory of individual blocks of rock in a blast, their point of impact in the muckpile and the final shape of the muckpile. The m
Jan 1, 1986
-
Increased drilling accuracy leads to significant improvement in ore recovery and dilutionBy R Stimpson, B Johnson, B Hesse
During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto
Mar 15, 2021
-
Water Treatment at the Waihi Gold MineBy B Twidle, D Bertoldi, J Meikle, R Dunne
The Waihi Gold Mine is situated in a high rainfall area (annual average of over 2 m) on the North Island of New Zealand. Water treatment and discharge at the mine has been ongoing for the last 25 year
Sep 26, 2013
-
Rosedale Outfall Project – Overcoming Extreme ConditionsBy T Ireland
The Rosedale Outfall Project utilised an earth pressure balance (EPB) tunnel boring machine (TBM) for only the second time in Auckland. Although the tunnel was excavated fully through East Coast Bays
Mar 8, 2011
-
The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel MineBy K Rees
In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow
Mar 26, 2012
-
Lessons learnt from six mine disaster case studies to improve audit and assurance and ESGBy A Atkins
Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves
May 5, 2022
-
Application of Gas Suspension Calciner in Relation to Bayer Hydrate PropertiesBy Nickelsen J, Theisen KG, Hansen PH
The use of stationary calciners in the processing of aluminium hydroxide has emphas- ized the importance of Bayer hydrate properties with respect to particle breakdown during calcination and subsequ
Jan 1, 1981
-
Conducting comprehensive evaluations of preconcentration optionsBy P Holtham, K Duffy, B, W Valery, E Tabosa, rade
Pre-concentration has potential to significantly improve Mineral Resource efficiency by removing gangue early in the process, before energy intensive and expensive comminution and fine processing. How
Nov 10, 2020
-
Development of mine intelligent ventilation technology in western ChinaBy S G. Li
Mine intelligent ventilation is an important guarantee to realise intelligent mining. It is the integration of the Internet of Things, big data, artificial intelligence, internet, cloud computing with
Oct 12, 2022
-
Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite ConcentratorBy C Jenkins, M Mativenga, C Stanton, J Gerber
In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra
Jul 13, 2015
-
Developing Process Control Standards for Optimal Plant Performance at PanAust LimitedBy D Baas, D Bennett
This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr
Sep 1, 2014
-
Turning Ideas into Gold BarsThe invitation to speak today was in the form of a single sentence instruction: How does your company run and how do you communicate from top to bottom? It looks like I'll have to let you into
Jan 1, 1995
-
Real Option Value OptimisationBy J Gould, T Elkington
Mine operation strategies are commonly optimised with a net present value (NPV) maximisation objective. There are well known properties of a typical mining project optimised for NPV, including high pr
May 24, 2012
-
A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New ZealandBy P Lindsay
A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it
Jan 1, 2006
-
An economic approach to optimising mill reline frequency – a case study of SAG mill relines at Rasp mineBy C M. Standen
The SAG mill at Rasp Mine has undergone a number of liner design modifications since commissioning in 2012, making liner wear and failure difficult to predict from historical data. During 2017, severa
Aug 29, 2018
-
Building Sustainability Into a ProjectOrganisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti
Jan 1, 2004
-
Origin of Witwatersrand Gold - A Viable Source Region and Source Process for GoldBy G N. Phillips
No new goldfields have been found in the Witwatersrand Basin for over 60 years, and one consequence of this is a long-term decline in gold production. Exploration throughout this period has been based
Sep 26, 2013
-
A Statistical Approach for Deriving Project Design RainfallBy R Millar
A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically
Nov 26, 2013