Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction ActivitiesBy D Davis
The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi
Mar 8, 2011
-
Dreams of Futures Past – Curating Post-mining LandscapesBy P A. Kirsch, A Hine
Mining is a major global industry that requires the moving of considerable volumes of earth and rock (overburden) to win the valuable ore prior to mineral extraction and processing. As a result of thi
Jul 16, 2014
-
Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South AfricaBy J M. Nel
Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R
Oct 5, 2011
-
High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, PhilippinesBy C Harrison, A Bowskill
The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to
Sep 17, 2014
-
The Use and Optimisation of Ferrous Feed at the Whyalla Blast FurnaceBy G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis
Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability
Jul 13, 2015
-
The Economic Advantages of Detailed Geotechnical Assessments for Extraction SequencingBy A Bennett, S Arndt
Minerals and Metals Group Pty Ltd (Golden Grove Mine) commissioned a comprehensive study of the life of mine using advanced 3D stress modelling. Essential input into the modelling was the proposed min
Mar 24, 2014
-
Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle MineBy G B. Smith
Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot
Mar 21, 2011
-
Influence of iron ore chemistry and mineralogy on sticking and breakage of pellets inside shaft furnaceBy M I. Pownceby, A Guiraud, S Purohit
Sticking and breakage of iron ore pellets during high temperature reduction can result in several operational challenges during shaft furnace ironmaking. With the shift to H2-based DRI processes and d
Sep 18, 2023
-
Effects of Specific Charge and Electronic Delay Detonators on Fragmentation in an Aggregate Quarry – Building Fragmentation Model Design CurvesBy M Olsson, U Nyberg, K Widenberg, P Svedensten, F Ouchterlony
During 2007 and 2008, the project Optimal Fragmentation in Blasting II was conducted at the Långåsen quarry of NCC Roads AB near Arlanda. The main goals were:an evaluation of the effect of u
Aug 24, 2015
-
Outline of Electrical Plant Layout Mount Isa Mines LtdBy Edmonds G. A
The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a
Jan 1, 1953
-
Microbial Aspects of Environmentally Benign Iron OreMany types of micro-organisms inhabit iron ore deposits contributing to biogenic formation and conversion of iron oxides and associated minerals. Bacteria such as Paenibacillus polymyxa are capable of
Jan 1, 2009
-
Development and Testing of a Small-Scale Uranium Leach for Geometallurgical ApplicationsBy N L. Turner, K Ehrig, V Liebezeit, D J. Robinson, L L. Kuhar, N Francis
Conventional industry tests used to determine leach recoveries are often fully monitored and may be time-consuming and expensive. Such tests may be limiting in geometallurgical applications where larg
Sep 29, 2013
-
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer ProgrammingBy Y Li, S Ramazan, E Topal
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t
Nov 24, 2014
-
Development of a Sustainability Roadmap for the Kwinana Industrial Area, Western AustraliaBy M John
The Kwinana Industrial Area (KIA) is by far the largest and most diverse industrial processing region (with supporting industries) in Western Australia. As with elsewhere in Australia (and globally),
Jan 1, 2009
-
Mine Real-Time Personal Respirable Dust and Diesel Particulate Matter MonitoringBy H W. Wu, T Harvey
An overview is given of two new developments in mine atmospheric monitoring. A new personal dust monitor (PDM) that gives real-time respirable dust readings is discussed. The unit is mounted within th
Jan 1, 2008
-
Impact of Co-disposing Mixed Plant Rejects on Spoil Pile SettlementsBy D J. Williams, A K. Kho, A Shokouhi, N Tucker
The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c
Jul 27, 2015
-
How Many Gold Mines will Inefficiency Kill?By G Lumley
Gold miners have been underperforming the price of gold for a number of years. So why has the æmarketÆ undervalued our gold miners relative to what they have been mining? The low valuation ascribed to
Sep 26, 2013
-
Characterising energy efficiency of particle sortingBy G R. Ballantyne, V Souto, K Bartram
Particle sorting allows partially liberated minerals to be separated prior to energy intensive fine grinding. Sensors select particles for separation and air, water or mechanical ejectors are used to
Aug 29, 2018
-
Uncertainty - An Important Source of (Additional) Value for Mine ProjectsBy S Watson, L Martinez
Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde
May 24, 2012
-
Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry MineBy J Say, M Hawtin, L Carlon, P Cann
Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an
Mar 15, 2021