Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Cross-Belt Samplers to Sampling of Base-Metal Concentrates

    By Yaniuk DW

    The sampling of non-ferrous concentrates from trucks and trains has long been carried out either manually or by automatic spears. Very little use has been made of conventional sampling systems for sam

    Jan 1, 1976

  • AUSIMM
    Nova-Bollinger reconciliation and risk

    By C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th

    Mar 22, 2022

  • AUSIMM
    Analysis of downstream field behavior of long‐runout tailings flows using remote sensing

    By N M. Rana, A Take, N Ghahramani, S McDougall, S G. Evans

    A critical issue associated with mining operations has been the stability of tailings impoundments. Some breach events have produced catastrophic tailings flows that have caused significant economic d

    Jul 1, 2021

  • AUSIMM
    Geostatistical Modelling of the Hilton and Mount Isa Lead-Zinc Orebodies, Mount Isa, Australia

    By Raymond G. F

    Geostatistics - a tool used by geologists and mine planning engineers to estimate grades and rapidly evaluate alternative mining strategies has reached an advanced stage of development for the silver-

    Jan 1, 1993

  • AUSIMM
    Computerised Geological Information for Mine Planning at Mt ISA Mine

    Copper grades of diamond drill hole and development samples are determined in the core shed logging area at Mount Isa Mine using a Bulk Mineral Analyser. All geological and grade data on the copper or

    Jan 1, 1985

  • AUSIMM
    The Augmented Mine Worker – Applications of Augmented Reality in Mining

    By J Bassan

    The mining industry is faced with imperatives to improve worker safety and productivity, adapt to skills shortages, high worker turnover rates, and provide more effective maintenance to new and ever m

    Nov 22, 2011

  • AUSIMM
    The Use OF Synthetic Polymer As A Drying Aid In Pelletizing (5a431b5e-3741-4ee5-b8f2-2d3b5f851251)

    A new watersoluble binder for mineral ore pellets has been developed by the sulfonation of bituminous materials. A highly effective binder for iron ore pellet making is obtainable from bituminous mate

    Jan 1, 1974

  • AUSIMM
    Grinding Control Development at ZC Mines

    By Freeman N

    A microcomputer based control system has been developed and implemented at ZC Mines (now Pasminco Mining). The control system maximises throughput at a product size set point while maintaining a &quot

    Jan 1, 1990

  • AUSIMM
    Overview of the experimental phase equilibria studies of the Ni-Sn-S, Cu-Sb-S, Cu-Sn-S, Fe-Sb-As and Fe-Sn-As systems

    By M Akhtar, E Jak, M Shevchenko

    This article presents an overview of the experimental phase equilibria studies of S-containing systems (Ni-Sn-S, Cu-Sb-S, and Cu-Sn-S) and As-containing systems (Fe-Sb-As and Fe-Sn-As). These systems

    Jun 17, 2024

  • AUSIMM
    Laboratory Studies in Comminution: Part V Simulation of an Industrial Rod MIll Product

    It is possible to closely simulate the product sizing distribution from an industrial rod mill by the correct choice of parameters in laboratory batch milling. For laboratory batch rod milling, change

    Jan 1, 1998

  • AUSIMM
    The New System of Structural Analysis in Drillcore (5e6b1b05-501c-47dd-af5d-a853c9b25af1)

    A comprehensive analysisof rock structures in non-oriented (axially oriented) drillcore is now available (Laing, in press). The system embodies new concepts which better equip the geologist and engine

    Jan 1, 1990

  • AUSIMM
    The Use of Wireline Logging to Control Blasting

    Opencast blasting is notoriously subject to variable blasting conditions, some of which are related to changes in ground conditions and some to human and equipment factors. As drilling and blasting

    Jan 1, 1988

  • AUSIMM
    Numerical Modelling of GPS Signal Propagation and Multipath for Australian Mines

    By Kubik K

    The objective of this paper was to determine if recent advances in numerical electromagnetic wave propagation modelling techniques could be used to study the propagation of GPS signals over arbitrar

    Jan 1, 1997

  • AUSIMM
    Current Billing Technology In Mineral Exploration

    By Emerson J

    Drilling has always been one of the most important parts of the exploration process with most companies spending around 25% of their budget on drilling. Although superficially there appears to be

    Jan 1, 1987

  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    Social licence to operate – circular economy

    By L Schürmann, R Kendall

    Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e

    Jun 22, 2022

  • AUSIMM
    Catchment-Scale Water Modelling and its Role in Risk Management during Mining Exploration

    By H He, S Tillotson, S Gibbons, J Shaw

    "Water evaluation and management during mining exploration and operational activities is crucial to minimise direct and indirect operational costs and also in delivering mining companies the less tang

    Nov 26, 2013

  • AUSIMM
    Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24

    By S Dorrington, J Olsen, N Kinkaid

    Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often

    Nov 4, 2015

  • AUSIMM
    A Non-Parametric Bayesian Framework for Automatic Block Estimation

    By A Melkumyan, F Ramos

    This paper addresses the problem of prediction of grade variables over volumes (block estimation) for an autonomous mine. Resource estimation is usually concerned with the prediction of the quality of

    Sep 26, 2011

  • AUSIMM
    Underground Aquifer Dewatering and Water handling Within the Stratiform Zn-Pb-Ag Orebody at the Hilton Mine, Mount Isa, NW Queensland

    Three separate and unconfined aquifers occur in the Hilton area, named relative to position in relation to ore horizons: Footwall Aquifer in the east; Ore-Zone Aquifer within the ore-bearing Urquhart

    Jan 1, 1993