Search Documents

  • AIME
    Cyaniding Silver-Gold Ores of the Palmarejo Mine, Chihuahua, Mexico

    By T. H. Oxnam

    INTRODUCTION. THE predominating value of the ores now being treated by the Palmarejo and Mexican Gold Fields, Ltd., is silver, although some gold is also carried. The present method of treatment con

    Jul 1, 1905

  • AIME
    Institute of Metals Division - Free Energy of Formation of Cementite and the Solubility of Cementite in Austenite

    By R. W. Gurry, L. S. Darken

    The solubility of cementite in austenite is computed by thermodynamic methods from the observed solubility of graphite. It is found that the solubility of cementite is greater than that of graphite in

    Jan 1, 1952

  • AUSIMM
    Mining Methods in the Waihi Mine, N.Z.

    By Johnston W. H

    MINING operations in the Waihi mine began, under the present proprietorship in the year 1889. Previous to this, and as far back as the year 1880, the presence of reefs in the Martha Hill had been know

    Jan 1, 1912

  • SME
    Alaska Way visit highlights Megaprojects conference in Seattle

    When defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,

    Dec 1, 2013

  • AIME
    Open-Pit Mining Operations

    By L. E. Fish, G. S. Wyman

    CHUQUICAMATA open-pit mine is capable of producing a total of 105,000 tons daily. When the sulphide plant is operating to capacity the distribution of this quantity will be approximately 30,000 tons s

    Jan 1, 1952

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • CIM
    The Boseto Copper Project

    By Brad Sampson

    Project Ownership ?Discovery Metals Limited ?ASX (DML), BSX (DML), AIM (DME) ?Market Cap AUD 195M ?Key assets ?Boseto Cu ?Dikoloti Ni The Boseto Copper Project ?Location ?Setting ?History

    May 1, 2010

  • SME
    Advances In The Practical Implementation Of Indicator Geostatistics

    By Clayton V. Deutsch

    Indicator Kriging (IK) is being commonly applied to mineral resource assessment problems. More recently, indicator simulation has also been used for sensitivity analysis and difficult change of suppor

    Jan 1, 1992

  • AUSIMM
    Air Compressing Machinery

    Apparently there is little inclination on the part of mining engineers to supplant the transmission of power by compressed air with it's formidable rival, electrical transmission. No doubt there

    Jan 1, 1902

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • NIOSH
    OFR-48-78 Roof Bolting Hazard Analysis Study

    By J. H. Adkins

    The purpose of this research is to identify hazards associated with roof bolting and to make recommendations for procedural and equipment design changes to reduce those hazards. To that end, the proje

    Jan 1, 1977

  • AUSIMM
    Mine Waste Risk Minimisation by Integrated Waste Management and Process Optimisation

    By D Brett

    "Mine waste storages including tailings dams and waste rock dumps represent arguably the biggest risk on a mine site from both physical and geochemical viewpoints, related firstly to structural stabil

    Jul 15, 2013

  • SAIMM
    The use of indirect distributions of selective mining units for assessment of recoverable mineral resources designed for mine planning at Gold Fields’ Tarkwa Mine, Ghana

    By J. Searra, M. Aboagye

    "For new mining projects or for medium- to long-term areas of existing mines, drilling data is invariably on a relatively large grid. Direct estimates for selective mining units (SMUs), and also for m

    Jan 1, 2015

  • SME
    A Novel Approach To Processing Coal Combustion Ash And Organic Bio-Solids - Introduction And Background - Preprint 09-110

    By R. Mensah-Biney

    The NC State University Minerals Research Laboratory (MRL) and Waste Reduction Partners (WRP) of the Land of Sky Regional Council joined efforts in 2000 to initiate a technically sound and practical p

    Jan 1, 2009

  • AUSIMM
    Paper No. 132. Milling And Treatment of Auriferous Ores in New Zealand.

    In dealing with the pulverization and treatment of auriferous ores, it may be stated that there is not one system of treatment applicable to all classes. In the southern portion of New Zealand the ore

    Jan 1, 1903

  • DFI
    Design Of Drilled Pier In Expansive Soils

    By G. T. Hong

    A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p

    Jan 1, 2007

  • CIM
    The Future of Coal -Carbon Feedstock Gasification-

    By Paul R. Clark

    Outline of Presentation ? Brief review of gasification and IGCC ? Polygenerationand its potential ? Why gasification today ? Major technology providers and their activities ? US initiatives ?

    May 1, 2006

  • CIM
    A Step back in time to Hand-Held Mining for Profitability

    By Mike Turner

    The Otter-Juan mine was closed by WMC Resources? Kambalda Nickel Operations (WMC-KNO) in 1999 due to the combined effects of low Nickel prices and high mining costs. GBF Mining Pty Ltd purchased Otter

    May 1, 2004

  • AIME
    Reservoir Engineering-General - Oilfield Interference in Aquifers of Non-Uniform Properties

    By M. Mortada

    Nonsteady-state flow of slightly compressible liquids in porous media of non-uniform properties has been the subject of a number of recent studies. Most of these studies considered one-dimensional flo

  • CIM
    Improving Concentrate Grade through Smart Design and Piloting

    By T. Strong

    "Selectively recovering pentlandite from high levels of pyrrhotite presents a technical and operational challenge. The liberation characteristics and also the chemical environment is critical to perfo

    Jan 1, 2017