Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    Longwall Support Monitoring

    By Robert G. Harris

    During the last five years there have been significant improvements in face support monitoring techniques particularly in respect of face pressure. The measurement of support loading pressures was

    Jan 1, 1993

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME-ICGCM
    Analysis Of The Initial Collapse Of The Overburden Over Longwall Panels Using Subsidence Data

    By Gennaro G. Marino

    Documented case histories of surface ground movements from mine subsidence were utilized to help determine when the initial collapse of the overburden occurred above longwall panels. By studying this

    Jan 1, 1988

  • SME-ICGCM
    High Horizontal Stress Effects On Longwall Gate Entry Stability

    By Yajie Wang

    High horizontal stress and its adverse effects on longwall gate entries have been witnessed in many US coal mines for the past years. It can cause cutter roofs and leads to roof falls either in the he

    Jan 1, 1996

  • SME-ICGCM
    Experimental Study Of Line Electrode Method To Detect Underground Cavities

    By F. Ziaie

    Line electrical resistivity method using physically infinite distance between current line electrodes is proposed to determine the location of mine workings. In this method at least three line electro

    Jan 1, 1989

  • SME-ICGCM
    Classification Of Large Seismic Events At The Lucky Friday Mine

    By J. K. Whyatt

    The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of

    Jan 1, 1996

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • SME-ICGCM
    Seismic Events In German Hard Coal Mining (927aed19-540f-49d6-8a7e-8eb1cd5cfc71)

    By Axel Preusse

    Underground coal mining can cause seismic events. There is currently no way to predict such phenomena reliably, in particular stronger events. That is why, according to the current state of the art, e

    Jan 1, 2009

  • SME-ICGCM
    Innovative Secondary Support Technologies For Western Mines

    By Thomas M. Barczak

    With the development of the shield support, the primary requirement for successful ground control in longwall mining is to provide stable gate road and bleeder entries. Wood cribbing has been the domi

    Jan 1, 1996

  • SME-ICGCM
    Geomechanical Support Of Adaptive Mining Technology

    By I. V. Baklashov

    Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad

    Jan 1, 1996

  • SME-ICGCM
    Evaluation of a Multiple Seam Interaction Coal Pillar Bump

    By Michael Gauna

    An evaluation and analysis of a coal pillar bump in a West Virginia mine indicated that the pillar bump occurred because of the unique combination of controlling factors. The pillar?s development sta

    Jan 1, 2008

  • SME-ICGCM
    Application Of Computer Programs For Rock Pressure Control

    By V. M. Shick

    For practical purposes of the use of information resources in the field of geomechanics and mine surveying with accepted mining technology in mines, the authors have developed the packaged software pr

    Jan 1, 1996

  • SME-ICGCM
    Technique To Measure Resultant Load Vector On Shield Supports (b937ef33-c51b-4de4-a956-dc8be749fea8)

    By Thomas M. Barczak

    The resultant load vector is the representation of the forces applied to a longwall roof support element by caving strata into a single, quantifiable measure of support resistance. The relatively comp

    Jan 1, 1984

  • SME-ICGCM
    The Response Of A High Order Stream To Shallow Cover Longwall Mining In The Northern Appalachian Coalfield

    By John A. Owsiany

    The effect of longwall mining on streams and shallow aquifers has been the subject of numerous research studies for more than twenty years. As a result of these studies, it has become common to consid

    Jan 1, 2001

  • SME-ICGCM
    The Uniaxial Compressive Strength Of Coal: Should It Be Used To Design Pillars?

    By Christopher Mark

    The Bureau of Mines has recently completed a comprehensive study of coal strength. More than 4000 individual test results from over 60 seams were extracted from the literature and combined in the most

    Jan 1, 1996

  • SME-ICGCM
    Ground Control for Muliple Seam Mining in German Coal Mines

    By Holger Witthaus

    There is more than a century of experience in multiple seam mining in Germany. In several mines up to 20 seams had been excavated within the last decades. Due to the nature of the deposit and the hist

    Jan 1, 2007

  • SME-ICGCM
    Understanding the hydraulic pressure cell

    By Keith A. Heasley

    Numerous different instruments and techniques have been developed for the purpose of measuring rock stress and stress changes around excavations. The interpretation of the output from many of these in

    Jan 1, 1989

  • SME-ICGCM
    Towards a Real Time Response to Changing Strata Conditions on a Longwall

    By P. Trueman

    A project is underway to convert a validated methodology to a system that will permit the near real time interpretation of loading data from longwall powered supports, allowing rapid adaptation of min

    Jan 1, 2006