Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Floor Failure Induced By Lateral Stress Ahead Of Longwall Supports

    By J. A. Nemcik

    Although floor failure at longwall faces has been traditionally associated with a soft floor, in many csses floor buckling has been observed just ahead of the longwall supports, despite the floor bein

    Jan 1, 1995

  • SME-ICGCM
    Economic Evaluation Of Subsidence Damage Mitigation Techniques

    By David C. Johnson

    Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m

    Jan 1, 1993

  • SME-ICGCM
    Effect Of Longwall Mining Subsidence On The Stability Of Surface Slopes

    By John J. Bowders

    The stability of surface slopes undergoing subsidence due to longwall mining was investigated to examine the effect the subsidence had on the stability of the slopes. Stability analyses were performed

    Jan 1, 1988

  • SME-ICGCM
    Development Of A Slope Stability Program For Improved Quarry Design

    By John Bullock

    Limestone and dolomite quarries were mapped to determine specific failure mechanisms for the various geologic and structural conditions. Algorithms for analyzing these mechanisms were incorporated int

    Jan 1, 1993

  • SME-ICGCM
    Empirical Approach to Calculate Rock Loads in Coal Mine Roadways

    By Erdal Unal

    In order to define the support parameters, by use of empirical approaches, it is particularly important to analyze the rock-load height that should be controlled by supports. The controlling mechanism

    Jan 1, 1986

  • SME-ICGCM
    Eclipse System Bolting In The Illinois Basin

    By Alan Campoli

    Approximately 100 million fully grouted rebar roof bolts are installed each year in the United States, 80% are B-Series (5/8 inch fully grouted rebar in a one-inch borehole). The lesser used more expe

    Jan 1, 2004

  • SME-ICGCM
    3D FEM Simulation For Fully Grouted Bolts

    By Khaled Morsy

    Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh

    Jan 1, 2004

  • SME-ICGCM
    Load Transfer Mechanics In Fully-Grouted Roof Bolts

    By Maynard O. Serbousek

    The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b

    Jan 1, 1984

  • SME-ICGCM
    Salt Pillar Design Equation

    By Leo L. Van Sambeek

    Specification of properly sized pillars to support the overburden is one of the most challenging aspects of salt mine design. Interest in salt pillar design is heightened by the recent flooding of th

    Jan 1, 1997

  • SME-ICGCM
    Stone Mine Design in Highly Fractured Rock (af82e9d2-530a-42f2-9d22-f8c466af0da2)

    By Vincent Scovazzo

    Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u

    Jan 1, 2002

  • SME-ICGCM
    Rock Bursts In Human Collieries

    By Guang Ping Cui

    In this paper the imminent relationship between rock burst and its phenomenon with normal rock pressure and its appearance, as well as the factors of one changing into another have been analyzed. Base

    Jan 1, 1984

  • SME-ICGCM
    An Underground Trial Of Cable Slings For Remedial Support Of Longwall Gateroads

    By William D. Gallant

    This paper describes a joint cooperative project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to conduct a trial of split set cable slings for re

    Jan 1, 1990

  • SME-ICGCM
    Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine

    By Kevin MacPherson

    After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache

    Jan 1, 1999

  • SME-ICGCM
    Development And Evaluation Of A Floor-Bearing Capacity Test Apparatus

    By Daniel W. H. Su

    A floor-bearing capacity test apparatus was designed and constructed to determine the true bearing capacity of soft floor materials beneath coal pillars or longwall face supports. The apparatus has be

    Jan 1, 1993

  • SME-ICGCM
    Support Resistance And Roof Behaviour Of A Longwall Face With 4-Leg Shields

    By S. S. Peng

    The hydraulic powered supports have been employed in U. S. longwall mining for the past two decades. Yet the sciences of roof control at the powered supported faces remain largely unknown. In order to

    Jan 1, 1982

  • SME-ICGCM
    Identification Of Critical Slope Failure Surfaces With Critical Tension Cracks

    The formation of tension cracks in slopes is well known. Analytical studies require the determination of a critical slip surface for any slope and, in doing so, it is necessary to consider an appropri

    Jan 1, 1989

  • SME-ICGCM
    Application of Stress, Geologic, and Support Design System (Sgssm) to Ground Control for Mine Slope Entries

    By John Stankus

    Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a mine slope entry, the problem becomes more complicated because a slope trans

    Jan 1, 2011

  • SME-ICGCM
    An Examination Of Energy Calculations Applied To Coal Bump Prediction

    By Keith A. Heasley

    Pillar recovery in deep coal mines with competent roof and floor can concentrate stresses and generate hazardous bumps. Actual calculation of the geologic strain energy released in association with th

    Jan 1, 1990

  • SME-ICGCM
    Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

    By Steve P. Signer

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p

    Jan 1, 2001

  • SME-ICGCM
    Time-Dependent Analysis Of Underground Opening Stability

    By Changshou Sun

    Excessive deformation occurred in the underground openings of Jinchuan Nickel Mine, the largest nonferrous underground mine in China. Developed in weak rock formations at great depth, the underground

    Jan 1, 1999