Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Designing for Upper Seam Stability in Multiple Seam Mining

    Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume

    Jan 1, 1986

  • SME-ICGCM
    Destressing Practice In Rockburst-Prone Ground

    By J. Willan

    This paper addresses the problem of designing a destress blasting procedure to reduce the incidence of rockbursting in hard rock mines. A review is made of the developed theory and practice of destres

    Jan 1, 1984

  • SME-ICGCM
    The research on the mechanical properties of hard roof in underground coal mining

    By Xu Lin Sheng

    During the mining course, when the roof above coal seams is constituted by thick and hard sandstone (conglomerate), sudden roof movements often take place with great force and de¬struction which is th

    Jan 1, 1989

  • SME-ICGCM
    An Overview Of The National Roof Evaluation Accident Prevention (REAP) Program

    By J. M. Krese

    This paper gives an overview of the National REAP program emphasizing the program's current status and future plans. A brief historical review of the program will be given containing roof-fall ac

    Jan 1, 1988

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Ultra-Close Multiple-Seam Mining ? Analysis and Verification

    By Daniel W. Su

    This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int

    Jan 1, 2012

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery

    By Ry Stone

    To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of

    Jan 1, 2012

  • SME-ICGCM
    Effect of Faults on the Movement of Roof Strata in Gateroads

    By Panfeng Gou

    In order to solve the problems of supporting the roof of the gateroads affected by a fault, the movement characteristics of roof strata must be fully understood. In this paper, a plane stress physical

    Jan 1, 2006

  • SME-ICGCM
    Estimation of in-situ material strength

    By Danell. R. E.

    A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com

    Jan 1, 1989

  • SME-ICGCM
    An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder Monitoring

    By Greg Hendon

    Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t

    Jan 1, 1990

  • SME-ICGCM
    Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia

    By Takashi Sasaoka

    Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t

    Jan 1, 2007

  • SME-ICGCM
    Jenmmar Compression Roof Control System

    By John C. Stankus

    To improve mine roof bolt performance, Jennmar Corporation commenced the design and development of a new roof control sys- tem. This new system designated "Insta'l Compression", not only improves

    Jan 1, 1990

  • SME-ICGCM
    Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)

    By Brian R. A. Wood

    Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t

    Jan 1, 1992

  • SME-ICGCM
    Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction

    By Witold M. Pytel

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi

    Jan 1, 1992

  • SME-ICGCM
    Harworth Colliery: Rockbolted Support In Weak Roof At Depth

    By Dave Bigby

    Hatworth Colliery, operated by RJB Mining (UK) Ltd, is successfully mining the Deep Soft Seam at a depth of 1000m using single face retreat longwalling. The seam is characterised by a weak roof genera

    Jan 1, 1996

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, Australia

    By Kieran Black

    The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has

    Jan 1, 2007

  • SME-ICGCM
    Optimization of the Stress Control Method to Improve Productivity and Safety in Underground Coal Mining

    By Shosei Serata

    The Stress Control Method improves productivity and safety in underground coal mining. The method stabilizes the roofs and floors of mine openings in both shallow and deep coal beds, regardless of whe

    Jan 1, 1986