Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Designing for Upper Seam Stability in Multiple Seam MiningHistorically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume
Jan 1, 1986
-
Destressing Practice In Rockburst-Prone GroundBy J. Willan
This paper addresses the problem of designing a destress blasting procedure to reduce the incidence of rockbursting in hard rock mines. A review is made of the developed theory and practice of destres
Jan 1, 1984
-
The research on the mechanical properties of hard roof in underground coal miningBy Xu Lin Sheng
During the mining course, when the roof above coal seams is constituted by thick and hard sandstone (conglomerate), sudden roof movements often take place with great force and de¬struction which is th
Jan 1, 1989
-
Mine Pillar Stability Analysis Using Fem Methods - Two Case StudiesBy David H. Tang
Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite
Jan 1, 1990
-
An Overview Of The National Roof Evaluation Accident Prevention (REAP) ProgramBy J. M. Krese
This paper gives an overview of the National REAP program emphasizing the program's current status and future plans. A brief historical review of the program will be given containing roof-fall ac
Jan 1, 1988
-
Ultra-Close Multiple-Seam Mining ? Analysis and VerificationBy Daniel W. Su
This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int
Jan 1, 2012
-
The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli CollieryBy Ry Stone
To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of
Jan 1, 2012
-
Effect of Faults on the Movement of Roof Strata in GateroadsBy Panfeng Gou
In order to solve the problems of supporting the roof of the gateroads affected by a fault, the movement characteristics of roof strata must be fully understood. In this paper, a plane stress physical
Jan 1, 2006
-
Estimation of in-situ material strengthBy Danell. R. E.
A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com
Jan 1, 1989
-
Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in IndonesiaBy Takashi Sasaoka
Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t
Jan 1, 2007
-
An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder MonitoringBy Greg Hendon
Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t
Jan 1, 1990
-
Jenmmar Compression Roof Control SystemBy John C. Stankus
To improve mine roof bolt performance, Jennmar Corporation commenced the design and development of a new roof control sys- tem. This new system designated "Insta'l Compression", not only improves
Jan 1, 1990
-
The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar MinesBy Anthony (Sam) J. S. Spearing
Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o
Jan 1, 2013
-
Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)By Brian R. A. Wood
Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t
Jan 1, 1992
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence PredictionBy Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Cavability Study Of A Competent Roof - A Case StudyBy T. N. Singh
An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.
Jan 1, 1994
-
Optimizing Pillar Design In A Multi-Seam EnvironmentBy R. Kanniganti
The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec
Jan 1, 1995
-
Harworth Colliery: Rockbolted Support In Weak Roof At DepthBy Dave Bigby
Hatworth Colliery, operated by RJB Mining (UK) Ltd, is successfully mining the Deep Soft Seam at a depth of 1000m using single face retreat longwalling. The seam is characterised by a weak roof genera
Jan 1, 1996
-
The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, AustraliaBy Kieran Black
The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has
Jan 1, 2007
-
Optimization of the Stress Control Method to Improve Productivity and Safety in Underground Coal MiningBy Shosei Serata
The Stress Control Method improves productivity and safety in underground coal mining. The method stabilizes the roofs and floors of mine openings in both shallow and deep coal beds, regardless of whe
Jan 1, 1986