Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improved Source Location And Evaluation Of Seismic Events Over A Deep Coal Mine
By D. S. Choi
This paper describes an improved source location technique for microseismic events related to coal mining. A system of non- linear distance equations is solved with the use of the Newton-Raphson metho
Jan 1, 1990
-
Assessment and Mitigation of Subsidence Effects on a Tall Self-Supporting and Free-Standing Communication Tower
By Yi Luo
A longwall mining operation went under a tall, self-supporting and free-standing wireless communication transmission tower. In anticipation of that the ground subsidence process might affect the trans
Jan 1, 2008
-
Failure mechanisms in ultra-close seam mining
By Yingxin Zhou
Virtually every coal seam in Appalachia will at some time be subject to multi-seam interaction (Wu et al, 1987). Many such problems result from seams which lie in close proximity or have split and lie
Jan 1, 1989
-
Recent Trends of Coal and Gas Outburst Accidents in China
By Ming Ju Liu
China has been suffering from the most serious coal and gas outburst accidents. The situation has become worse than ever with the mining of deeper coal seams at higher production rates in a more compl
Jan 1, 2008
-
Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)
By Nan Hua
As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make
Jan 1, 2009
-
Using Ground Penetrating Radar For Roof Hazard Detection In Underground Mines
By G. M. Molinda
Ground Penetrating Radar (GPR) is being investigated for the potential to determine roof hazards in underground mines. GPR surveys were conducted at four field sites with accompanying ground truth in
Jan 1, 1996
-
Subsidence Control Over Abandoned Mines
By Victor V. Nazimko
Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for
Jan 1, 1996
-
A Study of Roof Caving in the Eastern U.S. Coalfields
Appropriate roof control is the most important requirement in underground coal mining and, in the case of longwall panels or second mining in room and pillar extractions, this can be simply expressed
Jan 1, 1986
-
An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining
By W. M. Pytel
The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-
Jan 1, 1989
-
Subsidence and Uplift Prediction in German and Polish Hard Coal Mining
By Axel Preusse
For the last 150 years, subsidence damage to the surface has been an unavoidable phenomenon associated with underground coal mining. In particular, the mechanization of mining methods in multiple seam
Jan 1, 2012
-
Detection of Abandoned Mines and Air Passages/Burning Centers of Mine Fires by Combined Electromagnetic Method
By Shu Yan
The high resolution resistivity method (HRRM) is developed specifically for detecting underground cavities and tunnels. HRRM has a special feature in that it can recognize and cancel static shift, whi
Jan 1, 2005
-
Fortrac® Geogrids For Mine Roof Control
By Ray Brandon
The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid
Jan 1, 1996
-
Effects of In-seam and Near-seam Conditions and Asymmetric Pillar Loading on Coal Pillar Strength
By Daniel W. H. Su
The importance of incorporating fundamental principles of rock material response and failure mechanics into a pillar strength design model has been demonstrated. To accurately assess pillar strength,
Jan 1, 1997
-
STRATA III ? A Full-Spectrum Roof Control Concept
By John H. Perry
Strata III is a full-spectrum roof control system which provides the mine operator the ability to upgrade his roof control in place. The procedure is easily adaptable with current roof bolting techniq
Jan 1, 1987
-
Prevention Of Time-Dependent Subsidence By Elimination Of Ground Movement Over An Abandoned Mine
By V. V. Nazimko
Abandoned coal mines cause subsidence and structural damages. Shallow abandoned mines induce the most severe and harmful damages. In addition, they produce time-dependent subsidence which is difficult
Jan 1, 1999
-
Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)
By David Newman
Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to
Jan 1, 2009
-
Geostatistical Methods For Hazard Assessment And Site Characterization In Mining
By Jennifer Riefenberg
Ground control hazards, coal quality, ore reserve estimation, and pollution modeling seem unrelated topics from most mining perspectives. However, geostatistical methods can be used to characterize ea
Jan 1, 1996
-
The Significance of Specimen Stiffness and Post Yield Characteristics on Passive Roof Support Design
By Thomas M. Barczak
The intent of this paper is to make mine operators and engineers aware of parameters which affect the loading behavior of passive roof support systems. The strength of a passive roof support element a
Jan 1, 1987
-
Cable Support Systems For Longwall Gate Road Stability
By Stephen C. Tadolini
The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar
Jan 1, 1995
-
Ropes mine crown pillar rock mechanics
By W. G. Pariseau
A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to
Jan 1, 1989