Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rehabilitation of New Croton Aqueduct ShaftsBy W. James Marold
The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are
Jan 1, 2008
-
Beneficiation Of Low-Grade Limonite Ore By HIMS-Cationic Reverse Flotation And Magnetic Roasting-LIMS TechniquesBy L. Xinghua
Limonite is a general term for a group of amorphous iron oxide and iron hydroxide materials. It is considered as one of the very refractory iron ore types due to its wide variation in chemical composi
Feb 27, 2013
-
Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station ProjectBy Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister
Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align
Jan 1, 2005
-
A new Perspective: Regional Development with Mining as a By-Product The Example "NFN-NaturFreizeitverbund Niederrhein GmbH"By H. -J. Langhoff
"The paper describes not a result, but a starting point to implement sustainable development to a region characterized by a typical down river landscape, agriculture, and extractive industry. The Natu
Jan 1, 2005
-
Investigating the Correlation between Coal Geochemistry and Coal BumpsBy David Hanson, Sean Warren, Chaparral Berry
"Coal bumps, also referred to as dynamic failure events or coal bursts (Lawson, Weakley, and Miller, 2016), continue to be a hazard in underground coal mines. While current design methods have signifi
Jan 1, 2019
-
Leaching Of Sarcheshmeh Copper Oxide Ore In Sulfuric Acid SolutionBy H. Razavizadeh
The recovery of copper from oxide ores containing from 2% to 4.1% acid-soluble copper from the Sarcheshmeh mine in Kerman province of Iran was investigated by agitation leaching in sulfuric acid media
Jan 1, 2008
-
Bringing the Entrepreneurial Mindset into Mining Engineering Education (Mining, Metallurgy & Exploration)By Rudrajit Mitra, Erik Hulthén, TOBIAS HARTMANN, ELISABETH CLAUSEN, Aarti Sörensen
There has been an ongoing debate on how to transform engineering education to better prepare students for today`s professional world that is characterized by increasingly complex problems and challeng
May 25, 2022
-
Crisis Management: What To Do If Disaster StrikesBy Joseph J. Zaluski, J. Steven Gardner, Marco M. Rajkovich
The telephone rings at 3:20 a.m. An exasperated voice on the other end says, “There has been a mine explosion at Mine No. 5 and we have not heard from three units of men.” Twenty-three minutes later
Jan 1, 2004
-
Hugh B. Miller; An interview with the 2019 SME President"Tell us how you got involved in mining?I was first exposed to mining at a young age, as a consequence of my dad and his passion for the industry and rock collecting. Even though he graduated with a d
Mar 1, 2019
-
Safety Framework for Programmable Electronics in Mining (a95116c1-d58d-432f-ad32-8ea419ca1fb8)By John J. Sammarco
Mining has one of the highest annual average fatality rates among major US industries. Health and safety dangers have been inherent to mining since the early days of picks and shovels. Even though mi
Jan 1, 1999
-
Tunneling Through Cobbles in Sacramento, CaliforniaBy Joel Nonnweiler, Rafael Castro, Ross Webb
The three thousand foot long 66-inch diameter Folsom East Interceptor Section2B was completed accident free, on time and under budget with no measurable surface settlement. The tunnel passed through n
Jan 1, 2001
-
Urban Tunnelling Experiences on the UK’s Channel Tunnel Rail LinkBy Keith Bowers, Frank Mimnagh, Eddie Woods
The CTRL London Tunnels The Channel Tunnel Rail Link (CTRL) London Tunnels comprise 36km of internal diameter bores that were driven by Earth Pressure Balance (EPB) Tunnel Boring Machines (TBMs).
Jan 1, 2005
-
Though Not a Record Year, the Coal Industry Performs Well in 1983By L. Westerstrom
Supply and Demand After a dismal first half, the industry saw a marked improvement in its markets during the final six months of 1983. Domestic consumption was 17.6% higher in the second half of th
Jan 5, 1984
-
Selective Froth Recovery (SFR) System To Increase Flotation RecoveryThe SFR system utilizes a skimmer or extractor placed at or near the slurry-froth interface where there is a higher concentration of valuable mineral particles. With assistance of hydrocyclones, it is
Jan 1, 2012
-
Review of Issues Related to Cerchar Abrasivity Testing and Their Implications on Geotechnical Investigations and Cutter Cost EstimatesBy Jamal Rostami, Levent Ozdemir, Amund Bruland, Filip Dahl
Cerchar Abrasivity Index (CAI) is one of the commonly used tests to evaluate rock abrasiveness for cutter life/cost estimations of TBM projects. There are at least 3 style machines, 2 different pin ha
Jan 1, 2005
-
Dealing With Subsidence and SMCRABy James M. Riddle
A discussion of frequently asked questions may help individuals trying to interpret subsidence regulations or prepare permit applications. The subsidence permitting process involves just one part of
Jan 12, 1980
-
Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan OperationsBy A. Koski
A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U
Jan 1, 2007
-
Coal Division ? Longwall ? Underground Mining I - Strata Control Simulation During Longwall Mining ? IntroductionBy Christopher Haycocks
Because of growing pressure from government and consumers to produce more coal, the mining industry must improve existing techniques and devise more efficient mining methods. Mining of the thicker, sh
Jan 1, 1979
-
Construction And Geological Engineering Of An Underground Ore BinBy J. F. T. Agapito, G. P. Bratton
A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos
Jan 1, 1985
-
Truth, Judgement, Responsibility, Integrity, Conflict And Resolution In Exploration And Heavy ConstructionBy Peter J. Tarkoy
A great deal of attention has been directed toward the complexities and inadequacies of exploration and pre-bid geotechnical information for heavy construction projects, differing site conditions, and
Jan 1, 1983