Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Grinding Mill Scale-up Problems

    By N. Arbiter, C. C. Harris

    The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o

    Jan 1, 1982

  • SME
    Application of arithmetic progression to haul road geometric design - SME Transactions 2012

    By A. D. Ajak

    A complete mining cycle involves digging, loading, hauling and dumping of the materials. Moving the ore from the pit to the crusher or to the waste dump requires access routes, which are termed haul r

    Jan 1, 2012

  • SME
    Optimization of flotation plant performance using micro-price analysis

    By A. Noble

    "Froth flotation circuits are widely used throughout the mineral processing industry for the concentration of fine particles. It had been estimated that nearly 2 Gt (2.2 billion st) of ores are treate

    Feb 1, 2017

  • SME
    Flotation Separation of Phosphate and Dolomite Using a New Amphoteric Collector

    By Chengliang Jliang, B. K. Parek, Xuxin Shao

    Of the impurities present in phosphate ore, dolomite is the most difficult to remove due to the similar chemical compositions of the impurities and also adsorption of dissolved species of dolomite ont

    Jan 1, 1999

  • SME
    An industry perspective on the current U.S. metal mining engineering education

    By Leping Liu, Sachin Urade, Li-Ting Chen, Pengbo Chu

    This study aims to provide industrial perspectives on the current U.S. metal mining engineering education and areas for improvement. An online survey was designed to seek opinions from the U.S. mining

    Oct 1, 2023

  • SME
    Analysis of the impacts of mining sequence and overburden depth on stability at a dipping limestone mine

    By B. Slaker, M. M. Sears, G. Rashed

    Ground falls represent a significant hazard at underground mines in the stone, sand and gravel (SSG) sector in the United States. Researchers from the U.S. National Institute for Occupational Safety a

  • SME
    Wetting Phenomena In Oil Sand Systems And Their Impact On The Water-Based Bitumen Extraction Process

    By J. Drelich

    The highly-efficient and economically-feasible technology for bitumen recovery from US oil sands using a water extraction approach was developed at the end of the last century. This water-based bitume

    Jan 1, 2007

  • SME
    Presentation Of Particle Beneficiation Test Results On An Equal Basis When Yield And Recovery Are Involved

    By J. Drzymala

    Particle beneficiation tests are often conducted to determine how the recovery of a key component of a particle mixture varies with overall product yield, i.e., the separation curve. The results can b

    Jan 1, 2007

  • SME
    An Investigation Into The Hydrological Behaviour Of Exposed And Covered Waste Rock Dumps

    By Bruno Bussière, Guosheng Zhan, Michel Aubertin, Vincent Martin, Robert P. Chapuis

    The study evaluates the hydrological behaviour of exposed and covered waste rock dumps. The objectives were to determine the major factors influencing unsaturated flow in waste rock dumps and covers,

    Jan 1, 2005

  • SME
    Transition and optimization of the Henderson mine ventilation system

    By C. Rutter, N. SHEA, K. KOLOBE

    Henderson Mine’s primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014

  • SME
    Projecting Copper Extractions And Shut-Down Criteria For Column Testing

    By E. Iasillo, R. R. Carneiro

    Independent of the method chosen to forecast production, an accurate method to project metal extraction is needed in order to accommodate leach cycles that exceed leach data on hand and thus be able t

    Jan 1, 2001

  • SME
    Planning and Designing For Mining Conservation

    By David B. Brooks, Roger L. Williams

    Control of the environment is as old as mining. Engineers have always had to consider how best to deal with the surface, and the character of the surface environment always affects mining method in so

    Jan 1, 1973

  • SME
    A Thermodynamic and Environmental Assessment of Lanthanide Chloride Production from Bastnaesite

    By A. Nivala, S. Ulgiati, M. Canino

    Mining and processing of bastnaesite ore, (Ln)CO3F, for lanthanides extraction is investigated in this paper. This series of elements proved to be applicable for a wide range of high-tech uses. In spi

    Jan 1, 2005

  • SME
    Estimating Technology’s Impact on Underground Coal Productivity

    By Stanley C. Suboleski

    1977 was the modern day low point for productivity in the coal industry. At that time, no one could have predicted that the industry was about to enter a productivity rise that would continue unabated

    Jan 1, 1990

  • SME
    Surface and Hybrid Mining: Aqueous Extraction Methods

    By W. J. Schitt

    Section 15 covers a loose collection of topics that involve water in some way. The chapters in this section include Dredge and Placer Mining (Chapter 15.1), Solution Mining: Surface Techniques (Chapte

    Jan 1, 2008

  • SME
    Mineralogical Characterization Of Products From A Smelting Reduction Ironmaking Pilot Plant

    By J. W. Cash

    The mineralogy and textures of cyclone dust, sludge, and occasional build-ups in the American Iron and Steel Institute (AISI) direct iron making pilot plant at Universal, Pennsylvania have been studie

    Jan 1, 1995

  • SME
    Climate Change Risk And Impact Assessment For Global Diversified Mining Group - Introduction - Preprint 09-015

    By T. Geyer

    The Carbon Disclosure Project (the pre-eminent global initiative for institutional investor collaboration on climate change) groups the business risks (and opportunities) related to climate change int

    Jan 1, 2009

  • SME
    Discussion – Determination of the Optimum Lifetime of a Mining Project Using Discounted Cash Flow and Option Pricing Techniques – ME Vol.44, No.10 1992, pp.1262-1268 – Cavender, B.

    By G. Le Bel

    The paper proposes three methods to determine optimum lifetime of a mining project1. The conclusion is that the three methods arrive at the same optimum production rate (by coincidence). It is also st

    Jan 1, 1993

  • SME
    Federal Water Pollution Control Programs Status, Impact, And Future

    By James R. Walpole

    Less than 100 years ago the first major federal regulatory agency, the Interstate Commerce Commission was established (in 1887), and since that time literally hundreds of other federal agencies have b

    Jan 1, 1978

  • SME
    What It’s Worth: A Review of Mineral Royalty Information (216bdce0-29f1-41fb-bcb8-aca9ebabc87c)

    By H. Lyn Bourne

    This marks the 15th consecutive year for this column. During 1995, readers were asked to supply royalty data for construction raw materials especially for states where none is available. The respons

    Jan 1, 1996