The Role Of Alloying Elements In Bainitic Rail Steels - SynopsisBy A. Kapito
The formation of bainite in steel is dependent on the size of the casting, the heat treatment, and the alloying elements. It is difficult to obtain a fully bainitic microstructure in steels during hea
Jan 1, 2013
-
Development and testing of a vehicle collision avoidance system based on GPS and wireless networks for open-pit minesBy A. Nieto
A vehicle proximity warning–collision avoidance system is being developed using GPS and wireless local area networks to improve safety of off-highway trucks in open pit mines. After two-and a-half yea
Jan 1, 2003
-
Evaluation Of Three Rock Breaker Layouts For Mechanized Block Cave MiningBy J. B. Oosthuizen
Mechanical rock breakers are used in block caving operations to reduce the size of ore fragments which are too large to pass through grizzlys at the load-haul-dumper tipping points. Several layouts of
Jan 1, 1997
-
An engineering classification for rocks and rock massesBy T. Ramamurthy
ABSTRACT : Rock mass classifications RMR, Q and GSI do not suggest decreasing modulus ratio with the decrease in the quality of rock. These have been linked to joint factor, Jf , for better predictio
Jan 1, 2003
-
Mathematical Modelling For Optimization Of Mineral Processing OperationsBy M. Moys
The use of temperature measurements for unusual applications in the analysis and control of column flotation and milling is discussed. This is followed by a review of some of the authors current resea
Jan 1, 2005
-
Numerical simulation of multiphase flow in a Vanyukov furnaceBy Y. M. Chen, H. L. Zhang, W. U. Bing, C. Q. Zhou
Multiphase flow in the widely used Vanyukov furnace was numerically studied. An unsteady three-dimensional and three-phase flow model was firstly built using the computational fluid dynamics (CFD) sof
Jan 1, 2015
-
Information As An Alternative To Mineral Rights TaxationA new system for granting access to mineral rights is proposed in the recently released White Paper, ?A Minerals and Mining Policy for South Africa?. Official policy states that ?Government?s long-ter
Jan 1, 1999
-
Support Pressure Estimation For Circular And Non-Circular Openings Based On A Parametric Numerical Modelling StudyBy H. Yavuz
Closed form solutions assume opening shape to be circular to simplify the calculation of the ground response curve for the design of underground openings. However, in mining and civil engineering work
Jan 1, 2006
-
Life And Design Of Bord-And-Pillar Workings Affected By Pillar ScalingBy M. D. G. Salamon
It has been noted in recent years that the pillars in some bord-and-pillar workings scale or spall. In due course this process may result in the collapse of the affected panels. This paper presents a
Jan 1, 1998
-
The Application Of Cyclic Voltammetry Coupled With Surface Plasmon Resonance Measurements To Thiol-Collector Interactions With Gold Surfaces (4ab15224-caa7-44d5-8efa-b1cd96e7beac)Surface Plasmon Resonance (SPR) spectroscopy, combined with cyclovoltammetry, has been successfully used to study the interactions between ethyl xanthate, heptyl xanthate, dithio-phosphate and propyl
Jan 1, 2005
-
The Corrosion Behaviour Of A Low Carbon Steel In Natural And Synthetic SeawatersThe corrosion behaviour of a low carbon steel was investigated in natural seawater and various synthetic seawaters. It was found that the steel corroded nearly four times faster in a 3.5% NaCl solutio
Jan 1, 2006
-
A Geotechnical Rationale For The Design Of South African Open Cast Coal Mine HighwallsOpen cast mining has been practiced in South Africa since the late1970s under near ideal geotechnical conditions. In the past decade, with the exhaustion of the traditional South African coal fields,
Jan 1, 2001
-
CFD Modelling Of The Steel Belt Sintering ProcessBy L. Hekkala, J. Ollila, J. Keihäs, P. Mäkelä
The Outokumpu Steel Belt Sintering (SBS) Technology is used for manufacturing chromite pellets that are charged into a smelting furnace for ferrochromium production. One of the main elements in succes
Jan 1, 2007
-
Comparison Of Resin-In-Solution And Carbon-In-Solution For The Recovery Of Gold From Clarified SolutionsBy J. van Deventer
Testwork was done with two different adsorbents, Dowex-Minix gold-selective resin and activated carbon, to detemine their relative performances with regard to gold recovery from clarified low-grade so
Jan 1, 2000
-
New systems for geological modelling-black box or best practice?By C. Birch
"A ‘geologically constrained’ orebody model has long been hailed as vital for a Mineral Resource statement that is compliant with the South African Code for Reporting of Exploration Results, Mineral R
Jan 1, 2014
-
Airflow Fields Simulation On Passive Pulsing Air ClassifiersBy Y. He
Early research showed that the separation of particles based upon their density was not possible in steadily rising air streams. The terminal velocities of moving spheres are determined by their aerod
Jan 1, 2005
-
Seismic Monitoring Of A Simulated Rockburst On A Wall Of An Underground TunnelBy A. M. Milev
A simulated rockburst was conducted underground at Kopanang Mine, previously called Vaal Reefs No. 9 Shaft. The rockburst was simulated by means of a large blast detonated in solid rock close to a cro
Jan 1, 2001
-
Determining concentration and velocity profiles of non-Newtonian settling slurries using electrical resistance tomography - SynopsisBy A. P. N. Sutherland
Pipelines for transporting high concentration slurries are often designed using methods applicable to homogeneous non-Newtonian laminar flow. Many industrial slurries though comprise coarse particles
Jan 1, 2008
-
A critical evaluation of processes to produce primary titanium - SynopsisBy D. S. van Vuuren
Over the last 60 years many different processes were conceived to reduce the cost of titanium produced by the Kroll process. However, success eluded all previous efforts, which were consequently termi
Jan 1, 2009
-
Factors Influencing Base Metal Recovery From Waste Reverberatory Furnace Slags In A50 KVA Laboratory DC Plasma Arc FurnaceBy W. Banda
Paper written on project work carried out in partial fulfilment of Phd. (Process Engineering) degree* The recovery of cobalt and copper from waste slag was studied in a plasma DC-arc furnace in red
Jan 1, 2004