    Multiple ore types can result in multiple processing plants, A.J.H. Newell and K.Doherty

    By A. J. H. Newell, K. Doherty

    A copper-gold project has required a number of trade-off studies underpinned by test work to settle on pragmatic flowsheets and throughputs to support a pre-feasibility study that provides a compellin

    Jan 1, 2020

  • SAIMM
    Correlations of geotechnical monitoring data in open pit slope back-analysis – A mine case study

    By A. F. Silva, J. M. G. Sotomayor, V. F. N. Torres

    Geotechnical monitoring plays an important role in the detection of operational safety issues in the slopes of open pits. Currently, monitoring companies offer several solutions involving robust techn

    Oct 1, 2021

  • SAIMM
    Deportment of Gold and Silver in the Pinos Altos Composite and Leach Residues: Implications for Recovery Improvement

    A mineralogical study was conducted on the feed (3.51 g/t Au and ~90 g/t Ag) and four leach residue samples (assaying 0.09 to 0.19 g/t Au and 30.0 to 61.5 g/t Ag) from the Pinos Altos silver-gold depo

    Jan 1, 2009

  • SAIMM
    A Critical Investigation Into Alternatives To Compressed Air In Boxfront Chute Cylinders - Synopsis

    By C. J. Tonkin

    Compressed air is widely used on South African gold mines. However, due to recent and proposed future electricity tariff increases it is quickly becoming too expensive to produce and use. Boxfront chu

    Jan 1, 2013

  • SAIMM
    Advanced integrated comminution and classification with eHPCC™, L.D. Roper, V. Borissenko, and M.J. Daniel

    By V. Borissenkob, L. D. Ropera, M. J. Danielc

    Eccentric High Pressure Centrifugal Comminution (eHPCC) is a novel comminution device that provides a single step to achieve a desired target grind size. The mechanisms within the unit mirror particle

    Jan 1, 2020

  • SAIMM
    Integrated Short- And Medium-Term Underground Mine Production Scheduling - Synopsis (01060c16-86e0-4e0e-8e87-e1ba1c275054)

    The development of short- and medium-term mine production schedules in isolation from each other has meant that only a local optimum can be achieved when each scheduling phase is carried out. The glob

    Jan 1, 2012

  • SAIMM
    Characterisation of pyrite and arsenopyrite surface species in aqueous systems for selective flotation, P. Forson, S. Xu, R. Asamoah, M. Zanin, and W. Skinner

    By R. Asamoah, P. Forson, S. Xu, W. Skinner, M. Zanin

    In most auriferous hydrothermal deposits, gold is preferentially associated with pyrite and arsenopyrite minerals, with higher economic gold values noted for the latter and arsenian pyrite minerals. I

    Jan 1, 2020

  • SAIMM
    Development of a Method for Evaluating Raw Materials for Use in Iron Ore Sinter in Terms of Lime Assimilation

    By W. Ferreira

    Steel is produced in a basic oxygen furnace from hot metal obtained from a blast furnace. A sintered iron ore with good hightemperature properties (strength and permeability) should be used as feed to

    Jan 1, 2014

  • SAIMM
    A Comparative Study Between Shuttle Cars and Battery Haulers

    By W. H. Holtzhausen

    The purpose of this project was to compare two underground, batch coal haulers ? battery haulers and shuttle cars ? in order to determine the more viable machine to implement. The specific standards f

    Jan 1, 2014

  • SAIMM
    Using laser scanner face mapping to improve geotechnical data confidence at Sishen mine

    By T. M. Russell

    "Face mapping is a simple but invaluable means of geological and geotechnical data acquisition whereby intact rock properties, rock mass properties, discontinuity properties, and structural orientatio

    Jan 1, 2018

  • SAIMM
    Magnesia Refractory Dryout?Managing The Risk Of Hydration - Synopsis

    By J. D. Steenkamp

    In 2002 the commissioning of an ilmenite smelter on the North Coast of South Africa was extended by three months due to the failure and subsequent replacement of the magnesia-based refractory lining.

    Jan 1, 2011

  • SAIMM
    Notices (02619eb5-54ba-4cc0-b5cb-283fbc964224)

    THE THIRD INTERNATIONAL GEOCHEMICAL EXPLORATION SYMPOSIUM (Summary Account) This Symposium, co-sponsored by the Canadian Institute of Mining and Metallurgy and the Society of Economic Geologists, wa

  • SAIMM
    Quality of PGE Fire Assays Using Spark Analysis on Lead Buttons

    By P. K. Hofmeyr

    Traditional fire assay dates back over 3000 years and has changed very little over that time. The only improvement is to replace the gravimetric finish with dissolution of the Precious Metal bead foll

    Jan 1, 2014

  • SAIMM
    Durability and Subzero Temperature Effects on Argillaceous Clastic Rocks

    By G. Dhakal, J. -I. Kodama, K. Neaupane, T. Yoneda

    ABSTRACT Durability tests and evaluation of sub-zero temperature effects to some argillaceous clastic rocks were carried out. Welded tuff, limestone, sandstone and schist samples collected from di

    Jan 1, 2003

  • SAIMM
    75th Anniversary Banquet

    A banquet, attended by 467 members and visitors, was held at the Wanderers Club, Johannesburg, at 8 p.m. on Friday, 21st March, 1969, to celebrate the 75th Anniversary of the founding of the Institute

  • SAIMM
    Lean construction: Implementing the Last Planner System on mining projects

    By M. C. Bekker, T. Govindasamy

    The potential benefits of implementing the Last Planner System (LPS) on mining infrastructure projects were explored through two case studies in the South African mining industry. The first part of th

    Feb 12, 2024

  • SAIMM
    A Mining Perspective on the Potential of Renewable Electricity Sources For Operations in South Africa: Part 2 – A Multi-Criteria Decision Assessment

    By R. G. Votteler, A. C. Brent

    "The first in this series of two papers, on the potential of renewable electricity sources for mining operations in South Africa, investigated the internal structure of mining corporations to evaluate

    Jan 1, 2017

  • SAIMM
    Shaft Sinking With Electronic Detonators At The Gautrain Rapid Rail Project (f9ad1d9a-6c5b-4b40-9dcc-1cb508d5d60d)

    By C. G. Goncalves

    The Gautrain rapid rail link project is currently Africa?s largest infrastructure project connecting South Africa?s major airport (OR Tambo), Johannesburg and Pretoria. Phase one is planned for comple

    Jan 1, 2009

  • SAIMM
    Shaft Sinking With Electronic Detonators At The Gautrain Rapid Rail Project

    By C. G. Goncalves

    The Gautrain rapid rail link project is currently Africa?s largest infrastructure project connecting South Africa?s major airport (OR Tambo), Johannesburg and Pretoria. Phase one is planned for comple

    Jan 1, 2009

  • SAIMM
    Measurements On Freshly-Deposited Surfaces Of Two Platinum Tailings Dams - Synopsis

    By G. Blight

    As part of an investigation of possible water-saving measures at Anglo American Platinum's Mogalakwena Mine in Limpopo, South Africa, a study was made of conditions on the wet beaches of two adja

    Jan 1, 2012