Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical Methods
By Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures
By Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures
By Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
Effectiveness of Head-Enlarged CDM Columns in Evaluating Settlement of Improved Grounds
By Y. M. Ha, T. D. Nguyen, D. T. Nguyen, H. K. Choi
Conventionally, cement deep mixing (CDM) columns are designed to have constant diameters over the improved depth as this facilitates the construction procedures. However, this design pattern may be in
Jan 1, 2019
-
Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NY
By Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand
"The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The
Jan 1, 2016
-
How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case Studies
By Alok Bhowmick
The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ
Nov 1, 2022
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)
By George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2003
-
Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil Nails
By Daniel A. Thome, Robert C. Janke
"Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and
Jan 1, 2005
-
Stability Analysis Of A Rubble Mound Breakwater Resting On The Weak Seabed By 2D Finite Element Modelling
By Vijaya R, Boominathan A
The design of a rubble mound breakwater resting on a problematic seabed is quite challenging and expensive. In the present study, stage-wise construction of a typical section of the breakwater for a p
Sep 1, 2022
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore
By George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2005
-
Experimental Investigation on the Lateral Load Capacity of Monopiles in Dense Sand
By Kenneth Gavin, Weichao Li, Paul Doherty
"The lateral load capacity is one of the most important issues to be considered in designing piles to resist berthing loads, ship impact forces and for monopiles used in the offshore wind sector. A nu
Jan 1, 2015
-
Influence Of Freeze–Thaw Cycles On Strength And Heavy Mental Leaching Performance Of Petroleum Drilling Mud Stabilized By Waste
By Tian Miaomiao, Cheng Yin, Shen Jun, Yu Hao, Li Yafei
Vast amounts of waste drilling mud containing heavy metals is produced during oil drilling process, which causes great pollution to the environment. Therefore, it needs to be treated until it is harml
Nov 1, 2022
-
Analysis of Water Leakage in Downstream Dam Toe of Komani Dam
By Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi
"Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita
Jan 1, 2016
-
Experimental Evaluation of Building Settlements Founded on Liquefiable Soils
By Ramin Motamed, Farshid Ghazavi, Joseph A. W. Toth
"Post-disaster reconnaissance of areas affected by earthquakes has documented extensive damage to buildings with shallow foundations located in liquefaction-prone areas. Currently, estimation of lique
Jan 1, 2016
-
Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction
By Stephen Buttling, Zhong Rui
"A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a
Jan 1, 1900
-
Evergreen Line Rapid Transit Project: Analysis and Design of Deep Soil Mix Panels to Mitigate Seismic Lateral Spreading
By E. Naesgaard, Brian E. Hall, A. Amini, Advanced Geosolutions, A. Azizian
"A 2 km section of the Evergreen Line Rapid Transit Project is supported on improved ground consisting of cement deep soil mix (CDSM) panels because of highly variable and challenging soil conditions,
Jan 1, 2015
-
Innovative Micropile Retrofi t of an Existing Structure
By Kenneth R. Chadwick, Thomas J. Tuozzolo, Terence P. Holman
"Micropiles are often installed to retrofit existing foundations that experience distortion and to underpin structures prior to future construction. The Dublin Road Pump Station project is an example
Jan 1, 2008
-
Assessment of Existing Bulkhead Walls for Dredging Impacts
By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Accuracy of Low-Strain Pile Integrity Test Results
By Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Influence of Different Parameters on the Behavior of Laterally Loaded Piles in Sand
By Musbah A. Hasan, Ahmed M. Nasr, Fauzi Jarushi
Many transmission towers, high-rise buildings and bridges are supported by piles. These structures may be subjected to large lateral loads. Therefore, experimental investigations on model piles under
Jan 1, 2017