Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NY
By Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht
The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou
Jan 1, 2018
-
Remediation Of Rail Structures Impacted By Landslides Using Sleeved Bored Piles
By Paul Hewitt, Aaron Rastall
The New South Wales South Coast rail corridor is key infrastructure for both freight and passenger transport. Geomorphological and geological evidence suggests that land instability has been widesprea
Nov 1, 2022
-
Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone
By Jim Glider, Noah Miner
The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio
Sep 8, 2021
-
Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) Wall
By Pancho J. Garza, Keith H. Dahlen, Chris A. Labye
"Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta
Jan 1, 2015
-
Application Of High-Strength Concrete To Drilled Shafts - 1. Summary
By A. E. Fiorato
A test program was conducted to evaluate use of high-strength concrete in drilled shafts (caissons). The objective of the program was to determine if internal temperatures developed during cement hydr
Jan 1, 1991
-
Reducing Downdrag Loads With Bitumen
By J. -L. Briaud
This presentation shows the results of laboratory and field tests to date for the NCHRP project entitled "Downdrag on Bitumen-coated Piles". This project required to test a variety of bitumens in the
Jan 1, 1991
-
DFI Collaborates on Risk-Based Panels
By Derrick Dasenbrock
Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co
Sep 1, 2023
-
Installation Of Augered Cast-In-Place Piles
By Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents
By Frank Rausche
Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world
Jan 1, 2001
-
Jardim de Alah Station — Built in Olympic Time
By Dario Libano, Luis Carlos Tenuta, Juliano Penteado
"Subway Line Number 4 is one of the newest additions to the Rio de Janeiro subway network. Built for the 2016 Olympic Games, the 16 km (10 mi) subway line connects the south of the city, with the famo
Jan 1, 2016
-
Long-Term Performance Of Wind Turbine Foundations Through Numerical Modeling
By Spencer Ness, Yazen Khasawneh, William Tjaden, Mohammad Nassim
The evaluation of long-term performance of the wind turbine structures is essential in lowering the Levelized Cost of Electricity (LCOE) from wind sources. The required maintenance of the wind turbine
Oct 1, 2022
-
Life Extension of 132 kV Lattice Tower Foundations
By Allan Herse
"The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig
Jan 1, 2017
-
ISM MICROPILE WORLD CUP 2017 WINNER - Life Extension of 132 kV Lattice Tower Foundations
By Allan Herse
"The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig
Jan 1, 2017
-
Innovative Drilled Shaft Installation Process Through Existing Bridge Foundations
By Tracy Brettmann
The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b
May 1, 2022
-
A Numerical Study On Behavior Characteristics Of Steel-Concrete Composite Drilled Shafts
By Hyu-Soung Shin
This study is concerned with the characteristics of the behavior of steel-concrete composite drilled shafts, a material that is used for large bridge foundations, and especially for weak submerged gro
Jan 1, 2007
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability
By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
Geotechnical Monitoring Of Deep Shoring Adjacent To Train Infrastructure
By Jakub Szary
Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel
Sep 1, 2022
-
Lateral Vibration Response Of Full Scale Single Piles
By A. Boominathan
The behaviour of single piles under lateral dynamic loading is very critical and the study is still a current field of research since 1950's. Though many methods have been developed analytically
Jan 1, 2002
-
Statnamic Load Testing Of High Capacity Marine Foundations (62a0500e-14c7-4ace-9608-4578694a5392)
By Mike Muchard
STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o
Jan 1, 2013
-
Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution Imaging
By Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T
Oct 1, 2022