Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evaluation of the Sulfide and Carbonate Distribution in Waste Rock Dumps and Development of Operational Guidelines for Acid Rock Drainage Control at the Ok Tedi Mine,Papua New Guinea

    By H Kundapen, B Bolton, S Miller

    The Ok Tedi porphyry copper and gold mine is an open-pit operation located within the Star Mountains in the Western Province of Papua New Guinea and is situated near the headwaters of the Ok Tedi-Fly

    Jan 1, 2003

  • AUSIMM
    Two Stage Iron Purification of Zinc Plant Solutions (bbf6e4b6-3e13-4866-8453-33e6cff94330)

    By Kershaw M. G

    At the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, impurities toxic to the electrolytic production of zinc metal, notably arsenic and antimony, have traditionally been coprec

    Jan 1, 1990

  • AUSIMM
    The Nature and Origin of the Gold-Bearing Laterities at Mount Gibson, Western Australia

    By Sale M, Clarke R, Parker M

    The Mount Gibson goidmine is located at the southern end of the Retaliation greenstone belt within the Murchison Province, approximately 300 km northeast of Perth, Western Australia. Economic gold m

    Jan 1, 1988

  • AUSIMM
    Pophyry Type Mineralization of Lower Cretaceous Age in S.E. Queensland

    Porphyry type mineralization of Lower Cretaceous age in eastern Queensland has been recognized only from the easternmost part of the northern New England Orogen (Day, Murray and Whitaker, 1978), w

    Jan 1, 1987

  • AUSIMM
    Pilot Plant Work as an Aid to Process Flow Line Development and Process Choices

    Pilot plant work has played a major role in the process development and design phase of the Iscor Heavy Minerals project. The pilot plant campaigns have been aimed at three process areas, namely prima

    Jan 1, 2001

  • AUSIMM
    The Development of a KPI and Metallurgical Accounting Systems at Nabalco

    By J Barnes

    During September 2000, Nabalco management identified the need for a corporate system to deliver its key performance indicators (KPIs). In June 2001, a need was also identified to replace the existing

    Jan 1, 2002

  • AUSIMM
    Validation of the AMIRA P9 Flotation Model Using the Floatability Characterisation Test Rig (FCTR)

    By J-P Franzidis

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant. It was developed as part of the AMIRA P9 project, primarily to determine ore floatabilit

    Jan 1, 2007

  • AUSIMM
    Mineral Resource Classification Using a Data Geometry Index

    Mineral resource classification is essential because it is required for public disclosure. The resources must be binned by a qualified person into measured, indicated and inferred categories using an

    Sep 26, 2011

  • AUSIMM
    Prediction of Hydrocyclone Performance in Iron Ore Beneficiation Using Virtual Modelling

    By S P. Suthers, J M. F Clout, J J. Campbe

    An advanced technique for modelling hydrocyclone separation performance has been developed. This technique is based on the combined modelling of hydrocycloning parameters and ævirtualÆ iron ore feed.

    Jan 1, 2005

  • AUSIMM
    A Model for Near-Field Blast Vibration Based on Signal Broadening and Amplitude Attenuation

    By D S. Scovira

    The effect of blast vibration on highwall stability is a common concern for many open pit mines. Vibration in such a case is a typical near-field blast vibration situation. Vibration modelling in the

    Jan 1, 2007

  • AUSIMM
    Selection Criteria for the Application of Resue Mining

    By K Osman, P Bennett

    The mining of an underground orebody requires development both in waste and ore before stoping commences. Regardless of what metal is being extracted, the waste development is minimised to reduce the

    Jan 1, 2002

  • AUSIMM
    The BHP Metallurgy Research Facility

    By Hart A. T, Lanigan P. G

    BHP is currently undertaking research into plasma are metallurgical processing at the Central Research Laboratories (CRL), Shortland. The use of high intensity plasma arcs for melting and smelting

    Jan 1, 1987

  • AUSIMM
    Mining and Storage of Reactive Shale at BHP BillitonÆs Mt Whaleback Mine

    By Kane, M O&apos

    The mineralised members of the Brockman Iron Formation mined at Mt Whaleback are overlain and underlain by shale horizons. To maximise resource recovery, waste movement within the life of mine plan wi

    Jan 1, 2003

  • AUSIMM
    Commissioning a Large Coal Blending and Preparation Plant

    The Curragh coal mining operation was designed and constructed to produce two coals initially at a rate of 4.3Mtpa. These are a high thermal energy steam coal primarily for domestic electricity ge

    Jan 1, 1986

  • AUSIMM
    Fine and Coarse Iron Ore Beneficiation - An Evaluation into Global Technologies and Techniques

    By L M. van Niekerk

    The mining of iron ore is a high volume low margin business because the value of this commodity is significantly lower than that of base metals. The main metallurgical challenges in most of the iron o

    Jul 15, 2013

  • AUSIMM
    The Effect of Detonating Fuse Downlines on Ammonium Nitrate/Fuel Oil Charges

    The effects of detonation of downlines and downline-booster systems on lodse-poured charges of 94% porous prilled ammonium nitrate/6% fuel oil (AN/FO) were determined. Detonation stability was indica

    Jan 1, 1970

  • AUSIMM
    The Porgera Gold Deposit, Papua New Guinea: The Influence of Structure and Tectonic Setting on Hydrothermal Fluid Flow and Mineralisation at a Convergent Plate Margin (16186b1d-6c25-4af8-9364-e7daeb6b3e56)

    The structure and tectonic setting has had a strong influence on gold mineralisation at the Porgera gold deposit. Here, the structural controls on the mineralisation at Porgera are discussed and plac

    Jan 1, 1995

  • AUSIMM
    Civil, Criminal and Professional Liability of Experts or ""Caveat Expert""

    By Jackson E

    The general level of awareness amongst members of the professions that they are faced with an increasing number of claims for breaches of their professional duty was dramatically heightened by the d

    Jan 1, 1989

  • AUSIMM
    A Description of the Stripping and Re-Timbering f the Ivanhoe South Extended Shaft, with Work Incidental Thereto

    With the post-war expansion of mmmg activities on its Western group of mines, the management of Lake View and Star Limited has commenced a project for the improvement of underground ventilation.The ma

    Jan 1, 1948

  • AUSIMM
    Opportunities With Underground Grinding and Hydraulic Hoisting

    By C J. Larder, S E. Turner

    The concept of underground grinding is not new, but to a metallurgist and a mining engineer this could be considered unconventional. The idea of pumping a ground slurry several hundred metres from und

    Jan 1, 2005