Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Conclusion or 'Chairman's Reflections'

    It is always difficult to sum up an open forum adequately and instantaneously, so, with the privilege of hindsight, and also with some time to reflect, I am exercising the Chairman's prerogat

    Jan 1, 1986

  • AUSIMM
    Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro Extension

    By L Nagy, K P. Juhasz

    The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi

    Sep 17, 2014

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Shifting Waters in the Pilbara’s Iron Ore Industry

    By I Brandes de Roos

    Water has played a key role in the Pilbara’s 60-year history of iron ore operations. In contrast to many of the current-day mining environments, iron ore mining was initially hosted by geological form

    Jul 13, 2015

  • AUSIMM
    Operational Management of Underground In-Seam Drilling Sites

    By ZáWang, F Hungerford, T Ren

    Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov

    Jul 1, 2013

  • AUSIMM
    ShovelSense measuring grade at bucket resolution – the new tool in the mine geologist toolbox

    By F Faraj, M Pal, M Haest, M Bradshaw, H Lang, K Hume

    MineSense Technologies Ltd. is revolutionising grade control at mining operations by installing ShovelSense® sensors on buckets that measure the grade of every load before it is dumped in the truck. T

    Mar 22, 2022

  • AUSIMM
    Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency

    By F Musa

    One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput

    Aug 8, 2011

  • AUSIMM
    BioHeap® – Breaking the Grade/Recovery Curve for Nickel Concentrators

    By J Fewings, T McCredden, S Seet, C Fitzmaurice

    "Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio

    Oct 10, 2016

  • AUSIMM
    Gold Dredging In New Zealand

    The history of gold dredging in New Zealand, leading to the develop- ment of the `New Zealand Type' dredge is considered. Much of this infor- mation has come from contemporaneous publications by

    Jan 1, 1988

  • AUSIMM
    Safety is all around – state-of-the-art underground mining safety with Mobilaris Mining Intelligence

    By A Prill

    Safety First and zero accidents are the targets most mines in Australia are aiming for, but manual processes and procedures limit the capabilities and response time in emergency situations. Even with

    May 5, 2022

  • AUSIMM
    Improving industrial copper processing operations through the application of thermodynamic fundamentals and advanced predictive tools

    By G R. F Alvear Flores

    Mineral resources are becoming more complex in composition and structure making it more difficult to produce clean concentrates for primary metal smelting. In parallel, providing technological solutio

    Jun 17, 2024

  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    The Ore-Deposits of Captain's Flat, New South Wales

    The revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of

    Jan 1, 1941

  • AUSIMM
    Geometallurgical Communication as a Distributed Information System

    By C Moorhead, J Jones

    A common problem in the mining industry is that company geologists can operate in relative isolation to the rest of the company (Jones and Moorhead, 2011). This may result in poor knowledge transfer a

    Sep 29, 2013

  • AUSIMM
    Ventilation Duct Leakage ù A Method of Assessment

    The tangible effects of leakage are presented graphically, and a technique for quantifying the leakage characteristics of a ventilation column using the æSolveÆ capabilities of a common spreadsheet is

    Jan 1, 2002

  • AUSIMM
    Some Aspects of Illawarra Coals for the Production of Blast Furnace Coke

    Iron from the blast furnace constitutes the starting point in steel production and any increase that can be made in iron production will bring about important repercussions in a long line of processes

    Jan 1, 1958

  • AUSIMM
    Perspectives and initiatives for the future of mining

    By O J. Restrepo Baena, S Nowosad, R Webber-Youngman, N Mojtabai, P Foster, A Binder, S Hazuria, erson, S Raval, L Liu

    As the mining industry faces times of change, new challenges arise to ensure raw material supply for the younger and future generations. Different scenarios are currently shaping the way we mine and t

    Sep 1, 2024

  • AUSIMM
    Acid Rock Drainage From Highway and Construction Activities in Virginia, USA

    By Z W. Orndorff

    Excavation through sulfidic geologic materials during construction activities has resulted in acid rock drainage (ARD) related problems at numerous (>40) locations across all five geologic regions of

    Jan 1, 2003

  • AUSIMM
    Structural analysis and modelling in an evolving mineral resources operation

    By N Arrys, A Jani, S Shahin

    Optimising pit slope stability and reducing strip ratio of a mining operation are two key tasks in geotechnical engineering. With a growing demand for minerals and an increasing cost associated with e

    Sep 1, 2024

  • AUSIMM
    The Application of Rubber and Polyurethane Screens for Sizing, Dewatering and Heavy Medium Recovery

    We are all no doubt aware that with today's high costs it is more important than ever to get the maximum possible return on capital invested in the mining industry. Screening is an important a

    Jan 1, 1984