Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part B - FlotationBy T Gibbons, M Korte, C Brent, K Runge
The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and steadily increased production from the original 119 t/h design capacity to 265 t/h milling throughput in
Jan 1, 2009
-
Pushing the boundaries of slag operability – processing of high-MgO nickel concentrates with the Ausmelt TSL processBy J Coveney, A Rich, D Grimsey, J Wood, S Creedy
In 2021, BHP and Metso examined processing of high-MgO nickel sulfide concentrates using Metso’s Ausmelt Top-Submerged-Lance (TSL) technology. Test work was conducted in Metso’s pilot test work facili
Aug 21, 2024
-
What is the Oxygen Depletion Potential of ?Water Vapour?By M A. Tuck
Atmospheric air on a moisture free volume basis consists of approximately 21 per cent oxygen. The current minimum threshold for oxygen in Australia is 19.5 per cent. Atmospheric air generally will als
Aug 31, 2015
-
Recent Development in Geoscience Research and Professional Education to Meet the Demands of Australia's Mining IndustryThe Research Centres Program initiated by the Federal Government and supported by the mining industry has had a major impact on geoscience research and education during the past five years. Eight m
Jan 1, 1996
-
Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI inputBy S K. Panda, M A. Van Ende, S Chatterjee
Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu
Jun 19, 2024
-
Investigations for Proposed Upgrade of the Homer Tunnel, New ZealandBy A D. Campbell
The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a
Mar 8, 2011
-
-
Can We Stop a Black Swan Breeding? Advances in Bowties and Critical Control ManagementBy M Andrew, H Reynolds, R Mills
As the global mining industry continues to grapple with ‘black swans’ (high consequence / low frequency events) for health, safety and environmental losses, the focus is shifting from risk assessment
Jun 22, 2016
-
Developing the Ridgeway Deeps Project with an Operations AttitudeBy C Jones
Ridgeway Deeps is a block cave (BC) located down dip of the operating Ridgeway sublevel cave (SLC) mine. The BC is located approximately 210 m vertically below the lowest SLC level and approximately 1
Mar 21, 2011
-
Recovery of the northern mining block at Cliffs Nickel MineBy M Hopkins, A Mutale, A E. Vidal da Silva
The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block
Mar 15, 2021
-
Jasper Bars and Structural Geology in Western AustraliaIn the introduction to a recent paper dealing with, the relationships of magnetite and hematite in the banded iron formations or "jasper bars" of the Western Australian pre-Cambrian(17)t the
Jan 1, 1943
-
Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levelsBy H J. J Boshoff
Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a
Jul 25, 2018
-
A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and LeadingBy J Nixon
I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co
Mar 21, 2011
-
Regular Measurement Defines Upgrades on Scrubber ScreensBy R Wilson, S Luke, R Williams, B Freeburn
"In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e
Oct 10, 2016
-
Do You Understand Your Legal Obligations in the Industry?Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest
Jan 1, 2007
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsBy V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil
Sep 18, 2012
-
A Producing Miner's View of DCF Methods in Mineral ValuationBy McMahon D
The approach to valuations at the Normandy Poseidon Group is a measured and methodical process that utilises skills sourced from a number of different disciplines. Whilst being subject to a strict
Jan 1, 1994
-
Is Truck Queuing Productive?By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
New Blasting Initiation Technologies in the Mining IndustryAlfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based
Jan 1, 2005
-
The Central Eyre Iron Project – Process Selection and DesignBy D Connelly
The Iron Road Limited Central Eyre Iron Project (CEIP) area, located on the Eyre Peninsula of South Australia, covers extensive Archaean iron formations that occur as coarse-grained magnetite bearing
Jul 11, 2011