Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Exploration History of Savage River Iron Deposits

    By Weatherstone N

    Ironstone outcrops on the Savage River were discovered by State Government Surveyor C. P. Sprent in 1877. The limonitic outcrops were initially regarded as the surface expressions of pos- sible tin-

    Jan 1, 1988

  • AUSIMM
    The Field Evalution of Explosives Performance

    By Cameron A

    In recent years there have been significant developments in the tech- nology available for blast monitoring, analysis and simulation. Progress in these areas has been achieved through research conduc

    Jan 1, 1988

  • AUSIMM
    Gympie Gold ù The Revival of the Monkland Mine

    By D Kahler

    Modern gold production from the Gympie Goldfield commenced in 1995 with the first production from the Monkland Mine. The primary ore target was the 2.5 m wide Inglewood Fault ore zone, which was initi

    Jan 1, 2002

  • AUSIMM
    Mineral Sand Mining and its Effect on Ground Water Quality

    Tomago sandbeds is an unconfined coastal aquifer located 20km. north of Newcastle in New South Wales, Australia. These sandbeds extend over an area of about 130km. The average aquifer depth is abo

    Jan 1, 1987

  • AUSIMM
    Performance of Vertical Flow Systems for Passive Treatment of Acid Mine Drainage

    Vertical flow systems (SAPS, vertical flow wetlands) are increasingly used for passive treatment of mine drainage that is net acid. Data on 30 systems in eastern US show that well designed systems typ

    Jan 1, 2003

  • AUSIMM
    Gold Mineralisation at the North End of the Kalgoorlie Field, Mount Percy - Kalgoorlie, Western Australia

    By Bonsall EM, Schwabe MR, Hamlyn DA

    Historically, most of the gold produced from Kalgoorlie has been derived from the gold and gold telluride Golden Mile lode systems dominantly hosted within the Golden Mile Doler-ite and to a lesser ex

    Jan 1, 1984

  • AUSIMM
    Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.

    A new approach to resource estimation at the exploration stage is emerging, based on the application of simple software techniques. The techniques combine the power of interactive graphics with proven

    Jan 1, 1990

  • AUSIMM
    Aluminium Extraction

    The Hall-Hoult process is likely to be the dominant method of aluminium production for the remainder of the century. The characteristics of the operation of a modern smelter are described and attentio

    Jan 1, 1985

  • AUSIMM
    Dilution Control at Outokumpu Mines

    By Pitkajarvi J

    Waste rock dilution causes mill feed grade to be lower than mineral resource grade. In nickel mines relative grade decrease (dilution) may be tens of per cent because of irregular ore boundaries and

    Jan 1, 1996

  • AUSIMM
    The Estimation of the Liquid Level in the Blast Furnace

    By Fukuda M, Kurita K

    A mathematical model for estimating the liquid level in the hearth is presented. The analytical result was checked on a cold two-dimensional model and an additional boundary condition for the fundame

    Jan 1, 1975

  • AUSIMM
    Ore Reserves and Reconciliations in an Orebody Containing Coarse Gold

    The South Junction deposit of St Barbara Mines Limited was discovered in 1989 by the geologists of Ross Atkins Mining.The deposit occurs in the lower part of the Gabanintha Formation of the Lukes Cree

    Jan 1, 1993

  • AUSIMM
    The Waihi Goldfield

    SOME 70 miles south-east of the of Auckland lies the town of Waihi-the centre of the Waihi goldfield, at present the mining pride of New Zealand. That the glory of most mining camps is evanescent form

    Jan 1, 1911

  • AUSIMM
    Review of Ground Support Systems at King Island Scheelite

    By Nag D. K

    King Island Scheelite is a wholely owned subsidiary of Peko-Wallsend Ltd. The company works two underground mines near the southern end of King Island at the western approach to lass Strait, 240 k

    Jan 1, 1981

  • AUSIMM
    Direct Reduction Technology - The Western Titanium Process for the Production of Synthetic Rutile, Ferutile, and Sponge Iron

    By Clements R. J, Davey J. M

    Development of the process from the pilot stage to the current operation of the Capel, W.A. plant is briefly described. The design criteria for a larger sized plant are discussed together with fact

    Jan 1, 1979

  • AUSIMM
    Transfer of Zinc from LGM Concentrate to Zinc Concentrate at the Hilton Concentrator of Mount Isa Mines Limited

    By Burford B. D, Johnson N. W, Rohner P

    Under design philosophy, the Hilton concentrator produced lead, zinc and LGM (lead plus zinc) concentrates. The LGM (Iow grade middling) concentrate was produced by combining coarse middling streams f

    Jan 1, 1994

  • AUSIMM
    Implementation of Split to Estimate the Size Distribution of Rocks in Mining and Milling Operations

    By Kanchibolta S. S, Brunton I, Tapia-Vergara F

    The Split digital image processing system has been implemented in three Australian mines for analysing the size distribution of rocks from the images taken from muckpiles, conveyor belts and tipping

    Jan 1, 1998

  • AUSIMM
    The Reduction of Zinc Oxide

    By Hayes P. C

    The reduction of small, dense zinc oxide (ZnO) samples in CO/CO2, and CO/N2 gas mixtures has been investigated at temperatures between 900 and 1100¦C. The microstructural characterisation of the rea

    Jan 1, 1991

  • AUSIMM
    Reducing Gassiness of Outburst-Prone Coal at Coal Basin Mines, Colorado, USA

    By Martin T

    High methane content of the medium volatile metallurgical coal mined from the Coal Basin mines causes very difficult mining conditions. Rapid desorption into the mine ventilation system limits coal

    Jan 1, 1982

  • AUSIMM
    Industrial Applications of the High-Intensity Rare Earth Drum Magnetic Separator

    By Merwin RA

    The recent development of rare earth permanent magnets has revolutionised the field of magnetic separation. The advent of rare earth permanent magnets in the 1980s provided a magnetic energy produc

    Jan 1, 1993

  • AUSIMM
    Reducing Bench Turnover Time and Improving Shovel Digability

    By D Kavanagh, C Michaud

    "A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im

    Nov 15, 2016