Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel MineBy J Foster
The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte
Mar 21, 2011
-
Geotechnical strata characterisation using geophysics and its application for coal mine designBy T Medhurst
Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g
Nov 30, 2018
-
Harnessing data complexity – how machine learning applies all project data for accurate resource modellingBy S Sullivan
A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in
Mar 22, 2022
-
An application of Monitoring and Numerical Modelling in Open Stope MiningBy Thomson I. R R, Friday R. G, Palmer W. T
The paper introduces the problems encountered in designing open stopes and briefly examines the factors that determine the final stope dimensions achieved after mining is completed. A case study is
Jan 1, 1981
-
Worthing Mine and its Historic EnginehouseBy Connell JE
The Worthing Mine near Hallett Cove. 20 km southwest of the cite of Adelaide, belongs to Aus- tralia's first mining era, which took place in South Australia between 1841 and 1851 (Figure 1). Op
Jan 1, 1987
-
A review of the most common underground slot, winze, rise or raise designsBy E Wargem
The conventional method of underground mining involves a process known as drilling and blasting to excavate valuable ore bearing minerals through the load and haul process. Drilling and blasting proce
Mar 29, 2023
-
Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processingBy S Fityus, K Koosmen, J Simmons
The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for
Jul 1, 2021
-
The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western AustraliaBy J deVries, A Broodryk, P Kyselica, K McLean
Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc
Aug 31, 2015
-
Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling SystemsBy R Shaw, T T. Neidel, C Adams
Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi
Jul 29, 2014
-
Assessment of climate risk in the Australian mining industryBy M Allen
By its nature, the mining industry is energy and emissions intensive. In the future, the world will still require the outputs of mining but the industry will need to adapt to the low emissions economy
Jul 25, 2018
-
Paving the Future - A Case Study Replacing Truck-and-Shovels by Shovel-and-Conveyor Continuous Mining at Carajas Open Pit MinesBy C T. Senra, A Souza
Increasing fuel prices, unavailabilty and high prices of tyres have imposed tremendous challenges for large open pit operations. Carajßs open pit mines, one of the largest iron ore projects in the wor
Jan 1, 2009
-
Value Impacts of Truck Limited SchedulingBy P G. Doig
Recent drops in commodity prices and economic uncertainty have seen many businesses re-evaluate their operational expenditure to ensure mine profitability. The high capital and operational cost of tru
Jul 16, 2014
-
Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel ProcessingBy A Tawadrous, B Wheeler, D S. Preece, S A. Silling
The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical
Aug 24, 2015
-
Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016By J Darbritz
"This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016
Nov 15, 2016
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted AnnulusBy M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnaceBy S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka
The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of
Jun 19, 2024
-
Design of Yield Pillars for Improved Stability of Colliery RoadwaysBy Bhattacharyya A. K
A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction
Jan 1, 1995
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022
-
Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic DamBy H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant
"The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable
Jun 15, 2016
-
Safety Support Functions for Underground Network CommunicationsBy A Noack
Today underground infrastructures, like tunnels and especially wide spread underground mines, are often equipped with ethernet based communication systems. These networks are used for the unified comm
Sep 26, 2011