Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case StudyBy D Kentwell
For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e
Jul 13, 2015
-
How Much Do We Need to Drill?By C Taylor, E Retz
Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr
Jul 13, 2015
-
Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, AustraliaBy A Fowler
The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit
Aug 22, 2011
-
Benefits Related to Applications of a Mass Blast in Open Cut MiningBy C Muñoz, N Ortega, J Vergara, D Avilés
Mass blasts have been the subject of extensive studies because of their potential benefits in mining operations. However, it has not been possible to advance due to the paradigm that states that the b
Aug 24, 2015
-
Strategies for Mine Planning and DesignBy S Coward, C Xu, P A. Dowd
"This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif
Nov 24, 2014
-
The influence of roadway configurations on VCD and bulkhead designBy M Salu
Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme
Oct 12, 2022
-
Quantifying Plant Flow Availability for an Alumina Refinery Expansion using Dynamic SimulationBy B Reynolds
The process design for green- or brown-fields metallurgical plants typically starts with two fundamental elements: the detailed mass and energy balance and the plant flow availability. The detailed m
Aug 8, 2011
-
Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)By Hoskings R
Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ
Jan 1, 1980
-
Observations on the Behaviour of a Gold Tailings with Hypersaline Pore FluidBy D Reid
Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to
Jul 27, 2015
-
Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley OperationsBy S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans
A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success
Mar 15, 2021
-
Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine ClosureBy S Jahn, M Noel, E M. Rykaart, M Pau
Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m
Jan 1, 2003
-
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer ProgrammingBy Y Li, S Ramazan, E Topal
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t
Nov 24, 2014
-
Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case studyBy E Philippa, J Vitanza, C Hawtin, B Miller
B Miller , E Philippa , C Hawtin and J Vitanza
Mar 22, 2022
-
Drill hole spacing analysis for classification and cost optimisation – a critical review of techniquesBy J Levett, O Rondon, I Glacken
Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl
May 24, 2023
-
Metallurgical test work – between a rock and a hard placeBy K Fiedler, A Newell, P D. Munro
Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and
Aug 29, 2018
-
The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel IntersectionsBy Hocking G
For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D
Jan 1, 1976
-
The Value Opportunity for New Zealand's Lignite DepositsThe lignites of Otago and Southland offer a potentially viable future feedstock for electricity production and possible conversion to petrochemicals or liquid fuels. The deposits, when combined, repre
Jan 1, 2005
-
Recent Operation at Harima WorksBy Kadoya H, Kondo Y
The Harima works were established in 1964 and started operation in 1966. The initial capacity was 3500 t/month of zinc and 1500 t/month of lead. Until 1990 a lot of improvements had been made and th
Jan 1, 1993
-
The Design Development, and Mining of the Southern 'B' Lode Orebody at NBHCThe Southern 'B' lode orebody at the New Broken Hill Consolidated Limited (NBHC) mine, Broken Hill, is a continuation of the zinc-rich orebody that was first mined in NBHC in the 1940&apo
Jan 1, 1977
-
The Competitive Challenge - Women's Contribution to EmploymentBy Pratt V
The economic, social and political environment of the mining and minerals industries is, as we all know, volatile and affected by constantly changing international forces. In addition, the outcome of
Jan 1, 1985