Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    Of Detritals, Derivatives and Determination ù An Example of Detrital Iron Discovery

    By P J. Hawke, M F. Flis

    The Hamersley Basin of Western Australia holds significant tonnages of detrital iron deposits. Formed by a cyclic weathering and eroding sequence of nominally barren banded iron formation, they may fo

    Jan 1, 2002

  • AUSIMM
    Extension of the Rosebery Mine by Decline Access Below 17 Level

    Access to the Rosebery Orebody, which dips into the western slopes of Mount Black at 45¦, has been achieved in sequence by the following means: - A series of adits down to 8 level - An inclined shaf

    Jan 1, 1982

  • AUSIMM
    Effect of Iron Removal and Reduction on Gold and Silver Extraction by Thiourea Leaching of a Pressure Oxidation Product

    By Woodcock J. T, Zhu T, Sparrow G. J

    A lead-zinc-pyrite flotation middling was pressure oxidised to give residues containing iron hydroxy sulphates (a mixture of basic iron sulphate (BIS) and a hydrated iron sulphate (HIS)) and lead su

    Jan 1, 1991

  • AUSIMM
    High Temperature Interactivity of Iron Ores in the Cohesive Zone of the Blast Furnace

    By X L. Liu, W Huang, J M. Zhu, S L. Wu

    The shape, position and thickness of the cohesive zone have a great influence on the operational performance of the blast furnace. Many researchers have found that the high temperature properties of i

    Jul 13, 2015

  • AUSIMM
    Driving improvements to underground diamond drilling effectiveness through real-time implicit modelling at Olympic Dam

    By J Taylor, M Smith, A Tunnadine, D Nikolakopoulos

    As Olympic Dam rapidly expands into the Southern Mine Area (SMA) the Mine Geology team has concurrently ramped up underground diamond drilling to sustain rates of above 175 km/a. With >10 underground

    Mar 22, 2022

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011

  • AUSIMM
    The Bottle Creek Au/Ag Deposit Ore Resource Calculation Procedures

    By Moeller T

    The Bottle Creek mine, when opened next month, will consist of three open cuts, Emu, VB and Boags, feeding ore to a central mill. The open cuts cover a strike length of 4.5 kilometres which forms pa

    Jan 1, 1987

  • AUSIMM
    Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources

    By A J. Ryan

    The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti

    Jan 1, 1998

  • AUSIMM
    Project-Finance Risks ù Due Diligence Matters

    Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/

    Jan 1, 2007

  • AUSIMM
    Narrow Vein Education - Back to the Future?

    By S Hall

    Mining schools around the world, many unfortunately now closed, were often established to teach the techniques of narrow vein mining and associated processing to students studying part-time while work

    Mar 26, 2012

  • AUSIMM
    Chlorine Based In-Situ Leaching of Alluvial Gold Deposits

    Alluvial mining even of shallow deposits is often economically a marginal proposition and causes significant disruption of the land surface through the need for large scale excavation. In-situ leach

    Jan 1, 1992

  • AUSIMM
    Using Geostatistics to Assist in Optimising Grade Control Estimation at KCGM's Fimiston Open Pit

    By Kelly D, Moore C

    The Golden Mile, which has been mined continuously for the past 100 years by both underground and more recently open pit methods, occupies an area of 1.2 km by 4 km adjacent to the city of Kalgoorli

    Jan 1, 1994

  • AUSIMM
    Investigation of Shield Face Stability by Transparent Soil Models

    By M Ahmed

    Reliable face support pressure is necessary for shield driven tunnels in cohesionless soils to prevent excessive ground movements. This paper presents experimental work on stability of a tunnel face u

    Mar 8, 2011

  • AUSIMM
    Evaluation of CAVEX Hydrocyclone in the Ok Tedi Grinding Circuit

    Ok Tedi Mining Limited has recently completed the first phase of a trial to compare the performance of D26B Krebs cyclones in different configurations to the new Warman 650 mm CAVEX cyclones. From 199

    Jan 1, 2000

  • AUSIMM
    Origin of High-Grade Iron Ores at the Thabazimbi Deposit, South Africa

    By N J. Beukes, S T. Netshio, M O. de Kock

    The Thabazimbi iron ore deposit comprises a series of stratabound orebodies, on average 18 - 25 m thick that are aligned along the faulted basal contact between the Penge Iron Formation and dolostones

    Jan 1, 2005

  • AUSIMM
    Challenges Faced by Narrow Vein Graphite Mining and Influence of Graphite Infill on Wall Stability

    By H S. Welideniya, K Ekanayake

    Carbon rich graphite deposits found in Sri Lanka are of inorganic origin and they occur as narrow steeply dipping veins. The vein width of these deposits varies from a few centimetres to metres, with

    Mar 26, 2012

  • AUSIMM
    Potential and limitations for sensor-based particle sorting of gold ores – experiences on sensor-based particle sorting piloted for SAG pebbles

    By A Kobzev, C Robben

    Sensor-based particle sorting of gold ores is the masterclass of preconcentration. The technical challenges of a grade in ppm scale makes a direct detection with currently available technology in mill

    Nov 10, 2020

  • AUSIMM
    The Filblast Cyanidation Process

    By Bodnaras G. E, Sceresini P. A

    The Filblast Cyanidation Process incorporates the advantages of intense high shear mixing, high dissolved oxygen concentration and high pressure to achieve extremely rapid gold dissolution rates. Th

    Jan 1, 1994

  • AUSIMM
    Industrial Relations in the Broken Hill Mining Industry - A Discussion

    To explain in any depth the industrial relations of Broken Hill I believe that it is necessary to trace some of the many happenings that created the present industrial climate. While appreciating

    Jan 1, 1975